Shelby County, Indiana
Addison Township is a township in Shelby County, Indiana. Septic permits inside Addison Township come from Shelby County. 14 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Shelby County page.
Addison Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New home construction inside Addison township, which lies in the unincorporated area that the Shelby County building inspector serves
“building, electrical, and plumbing permits are required and allow for inspection of new construction to ensure it complies with building code.”
Owner-occupants building a home inside Addison township who act as their own builder
“improvement location permit, building, and electrical permits may be obtained by the homeowner with submittal of a homeowner’s affidavit.”
New one- and two-family dwellings and their accessory structures inside Addison township, which is in Indiana; the 2020 Indiana Residential Code applies statewide through the state fire and building commission
code edition: 2020 Indiana Residential Code (based on 2018 IRC)
“675 iac 14-4.4 2020 indiana residential code free access (model code with incorporated amendments) 2018 international residential code for one- and two-family dwellings, first printing currently in effect effective: 12/26/2019”
New home construction inside Addison township, inspected through Shelby County's permit process
“it is the responsibility of the permit applicant to call all applicable departments and agencies to request necessary inspections at the appropriate times, including the plan commission, inspector’s office, and health department.”
New home inside Addison township before occupancy
“the home shall not be occupied until issuance of a temporary or final certificate of occupancy.”
Septic systems for new homes inside Addison township, permitted through the Shelby County Health Department
“obtain a septic permit from the shelby county health department.”
New homes inside Addison township that use on-site septic
septic permit fee: 25 USD
“a septic permit is required for all new homes, unless utilizing sewer/water from the waldron conservancy district.”
New homes inside Addison township with an on-site septic system
“the shelby county inspector’s office will issue a final certificate of occupancy after completion and approval of all inspections, including inspection of the septic system.”
New homes inside Addison township; the Waldron Conservancy District sewer or water is the only utility named in the county new-home procedure
“a septic permit is required for all new homes, unless utilizing sewer/water from the waldron conservancy district.”
Creating a new lot inside Addison township, such as splitting part of a farm parcel
“creation of a new lot (example – purchase of a portion of farm ground) must go through the platting process.”
New home driveways that connect to a county road inside Addison township
“obtain an access permit from the shelby county highway department.”
New home sites inside Addison township that lie in a flood hazard area
“the planning director will also verify that the lot does not lie within a flood hazard area.”
New home permits for land inside Addison township
site plan fee: 60 USD · septic permit fee: 25 USD · access permit fee: 20 USD · improvement location permit fee: 190 USD · building permit fee: 200 USD · electrical permit fee: 150 USD · plumbing permit fee: 150 USD · additional basement fee: 100 USD (if applicable) · floodplain permit fee: 60 USD (if applicable)
“permit fees site plan - $60.00 septic permit – $25.00 access permit - $20.00 improvement location permit - $190 building permit - $200 electrical permit - $150 plumbing permit - $150 additional basement fee (if applicable) - $100 floodplain permit fee (if applicable) - $60”
New home permit sequence for land inside Addison township
“new home process 1. buildable lot verification contact the planning director to verify that the lot complies with all lot standards implemented by the plan commission.”
We looked and could not find an official answer yet. Silence is not permission; ask Addison Township or Shelby County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Addison Township publishes no rule on the point, not that none exists. Shelby County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Addison Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.