Montgomery County, Indiana
Scott Township is a township in Montgomery County, Indiana. Septic permits inside Scott Township come from Montgomery County (Montgomery County Health Department · (765) 364-6440). 4 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Montgomery County page.
Scott Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Onsite sewage (septic) systems for dwellings not connected to public or municipal sewer, inside Scott township, Montgomery County, IN, as administered by the Montgomery County Health Department (the procedure does not name Scott township; applicability is inferred from the county health department's countywide procedure and is not separately verified for the township).
“any dwelling that is not connected to a public or municipal sanitary sewer is required to have an onsite sewage system as a method of waste disposal and wastewater treatment.”
New onsite sewage system or repair of an existing system for a dwelling inside Scott township, Montgomery County, IN, as administered by the Montgomery County Health Department (township not named in the source; applicability inferred from the countywide procedure).
permit fee, new system or repair of existing system: 200 USD (commercial permits for construction or repair are $300.00) · permit validity: 1 year
“an onsite sewage system permit is required before a building permit will be issued.”
Septic (onsite sewage system) permit fees for work inside Scott township, Montgomery County, IN. No building permit fee was found for the township.
septic permit fee (new system or repair): 200 USD (commercial permits $300.00)
“the permit fee for the construction of a new system or the repair of an existing system is $200.00.”
Septic permit process for new construction inside Scott township, Montgomery County, IN (as administered by the county health department; township not named in the source).
“the first step in acquiring a permit for new construction is to obtain an application at the health department.”
We looked and could not find an official answer yet. Silence is not permission; ask Scott Township or Montgomery County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Scott Township publishes no rule on the point, not that none exists. Montgomery County’s page lists the county offices to call.