Howard County, Indiana
Union Township is a township in Howard County, Indiana. Septic permits inside Union Township come from Howard County (Howard County Health Department – Environmental Health Office · 765-456-2406). 13 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Howard County page.
Union Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction, alteration or extension of buildings in unincorporated Union township (outside Kokomo, Russiaville and Greentown), under the county building-regulations section
“prior to the construction of any building, structure, dwelling or any part thereof, no extension, repair or alteration of any existing building, no plumbing, no electrical work, no heating work, no ventilation work, nor air conditioning work having a contract price or estimated cost of more than $100 shall be started until a statement in writing of the work proposed to be done shall first be submitted by the contractor or individual in charge of the work to and approved by the building commissioner, and a permit issued by him or her for the proposed construction, alteration, repair or extension work.”
“improvement location permit information required for kokomo and howard county, indiana note: property owner's signature is required for all permit applications.”
Howard County zoning districts that govern unincorporated land in Union township
“changing the zoning classification for property described as part of the southeast quarter of section 12, township 22 north, range 5 east, union township, at 11678 east 200 south greentown, from ag (agricultural) to rr (rural residential).”
New lot approval in the RR (rural residential) district in unincorporated Union township
minimum lot area (RR): 1 acre · minimum lot width (RR): >= 120 feet · minimum public street frontage (RR): >= 50 feet (access from the public street)
“approval of a new lot in rural residential districts requires: a. the lot contain 1 acre; 120 feet minimum lot width with 50 feet on a public street with access from said public street.”
“approval of a new lot in ag, agricultural districts requires: a. the lot contain at least 20 acres or b. the lot contain at least one acre and 19 acres of contiguous permanent conservation easement.”
On-site sewage system permitting and approvals in unincorporated Union township, Howard County
“prior to construction or repair of an on-site sewage system (septic system), the property owner is required to obtain a permit from the environmental health office.”
New or repaired on-site sewage (septic) systems on lots in unincorporated Union township, Howard County
“prior to construction or repair of an on-site sewage system (septic system), the property owner is required to obtain a permit from the environmental health office.”
Proposed residential developments (subdivisions) on land in unincorporated Union township; no sewer connection rule was found for a single home on an existing lot
distance to nearest sanitary sewer: < 300 feet per lot (applies to proposed residential development only)
“a direct connection shall be required when the total length of the sanitary sewer lines required from the existing sanitary sewer system to the nearest property line of the proposed project is less than 300 feet per lot in the total project”
Subdivision and replat of land in the unincorporated territory of Howard County, including unincorporated Union township
“no plat or replat of a subdivision of land located within the jurisdiction of commission shall be recorded until it shall have been approved by the commission”
New homes on land in unincorporated Union township, Howard County (outside Kokomo)
“a driveway permit from the howard county highway department (phone: 765-456-2802)”
Development in a Special Flood Hazard Area (SFHA) on land in unincorporated Union township
“failure to obtain an improvement location permit in the sfha or failure to comply with the requirements of a permit or conditions of a variance shall be deemed to be a violation of this chapter.”
Improvement location permit fee for work in unincorporated Union township, Howard County
ILP fee rate: 1 USD per 1,000 USD of estimated or contracted cost · ILP minimum fee: 15 USD · ILP maximum fee: 1000 USD · after-the-fact permit surcharge: 10 USD per 1,000 USD of estimated cost (applies to after-the-fact permits)
“a permit fee which is calculated at $1.00 per $1,000.00 of estimated or contracted cost of the improvement. the minimum fee is $15.00. the maximum fee is $1,000.00.”
Improvement location permit application for unincorporated Union township
“the following items must be submitted with the application for an improvement location permit:”
We looked and could not find an official answer yet. Silence is not permission; ask Union Township or Howard County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Union Township publishes no rule on the point, not that none exists. Howard County’s page lists the county offices to call.