Honey Creek Township is a township in Howard County, Indiana. Septic permits inside Honey Creek Township come from Howard County (Howard County Health Department – Environmental Health Office · 765-456-2406). 6 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Howard County page.

Answers from the rulebook for Honey Creek Township

Rules another office applies inside Honey Creek Township

Honey Creek Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Septic systems on land inside Honey Creek township, administered by the Howard County Health Department environmental health office (Kokomo)

    • The OSS page does not state a township-by-township service boundary; the county health department is the permitting office named for Howard County.
    • Inside the City of Kokomo a sanitary sewer tap permit from the city applies instead of a septic permit, per the 2008 improvement location sheet.
    “prior to construction or repair of an on-site sewage system (septic system), the property owner is required to obtain a permit from the environmental health office.”
  • Septic permitRequired

    New or repaired septic systems on land inside Honey Creek township (Howard County Health Department)

    • A soil test is needed in all cases to determine the absorption field area, per the OSS page.
    • System size depends on soil types and number of bedrooms, per the OSS page.
    • Any septic work must receive prior approval before it begins, per the OSS page.
    • The 2008 improvement location sheet lists the health department septic permit phone as 765-456-2403; the current OSS page lists 765-456-2406. Confirm the current contact before relying on either.
    “in all cases, a soil test is needed to determine the area of the absorption field. any work performed on a septic system must receive prior approval before the work begins.”
  • Subdividing landRegulated (with conditions)

    Creating new lots on unincorporated land inside Honey Creek township, under the Howard County Plan Commission

    • Unapproved lots may require subdivision approval before a home permit issues.
    • The Kokomo-HC subdivision checklist (secure.in.gov) indicates separate rules for new lots in agricultural and rural residential districts; not opened within budget.
    “a. verify the property is an approved building lot. unapproved lots may require subdivision approval.”
  • Driveway accessRequired

    New home driveway access on unincorporated land inside Honey Creek township (Howard County Highway Department)

    • Listed as a companion permit for new homes on the 2/21/2008 sheet, which applies outside the City of Kokomo.
    • The sheet's phone number for the highway department is 765-456-2802; confirm before relying on it.
    “a driveway permit from the howard county highway department (phone: 765-456-2802)”
  • Permit feesPublished (with conditions)

    Howard County improvement location permit fee for work on unincorporated land inside Honey Creek township

    • Minimum fee $15.00; maximum fee $1,000.00, per the 2/21/2008 sheet.
    • An after-the-fact permit carries an additional $10.00 per $1,000.00 surcharge, per the same sheet.
    • The sheet is dated 2/21/2008; the current fee schedule was not verified and should be confirmed with the Plan Commission.

    permit fee rate: 1 USD per $1,000 of estimated or contracted cost (minimum $15.00; maximum $1,000.00)

    “a permit fee which is calculated at $1.00 per $1,000.00 of estimated or contracted cost of the improvement. the minimum fee is $15.00. the maximum fee is $1,000.00.”
  • Permit processPartial

    Howard County improvement location permit application for land inside Honey Creek township outside Kokomo

    • The sheet lists the required application items but not the review timeline or inspection steps for county work.
    • The sheet is dated 2/21/2008 and may not reflect the current process.
    • Companion permits also required for new homes: septic system permit (health department), MS4 permit (county surveyor), and driveway permit (county highway department).
    “the following items must be submitted with the application for an improvement location permit:”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Honey Creek Township or Howard County directly.

  • Owner-builder exemption — Owner-builder exemption for a home built by the owner inside Honey Creek township
  • Building code adopted — Building code adopted for new construction inside Honey Creek township
  • Inspections — Building inspections for new homes inside Honey Creek township
  • Certificate of occupancy — Certificate of occupancy for new homes inside Honey Creek township
  • Local zoning — Whether Honey Creek township itself adopts and administers a zoning ordinance for land inside its limits
17 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Honey Creek Township publishes no rule on the point, not that none exists. Howard County’s page lists the county offices to call.

← All of Howard County: county rules, score and offices