Zoning, building permits and septic rules in Jasonville, Indiana
Jasonville is a city in Greene County, Indiana. 5 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Greene County page.
Answers from the rulebook for Jasonville
Jasonville’s own rules
Living in an RVLimited
Campers (motor vehicles or trailers with sleeping and cooking facilities) used as a dwelling on land inside Jasonville city limits
Permitted only as a state-licensed mobile home park placement, or within the 60-day limit.
Sec. 152.04(b): the city shall not provide water, trash pickup, gas or sewer service to any camper or amish cabin located within the city, except within a state-licensed mobile home park.
Sec. 152.04(c): campers and amish cabins inhabited as a dwelling before the chapter's effective date are exempt from this section but must be relocated within the city or replaced.
Code currency: the overview page states 'local legislation current through ord. 2022-17, passed 12-29-2022'.
maximum period as structure outside state-licensed mobile home park: <= 60 days (unless placed within a mobile home park licensed and regulated by the state)
“no person shall place or locate a camper or amish cabin within the corporate limits of the city for use as a structure for a period of more than 60 days, unless such camper or amish cabin is placed within a mobile home park licensed and regulated by the state as provided in i.c. § 16-41-27.”
Camping on your landLimited
Camping in a camper or amish cabin on land inside Jasonville city limits
Camping in a camper or amish cabin used as a structure for more than 60 days is prohibited unless the unit is inside a state-licensed mobile home park.
Penalty under sec. 152.99: the penalty may be levied at the amount of $50, and each day the unit is in violation is a separate violation.
This chapter does not address tent camping or short stays under 60 days.
maximum period as structure outside state-licensed mobile home park: <= 60 days (unless placed within a mobile home park licensed and regulated by the state)
“no person shall place or locate a camper or amish cabin within the corporate limits of the city for use as a structure for a period of more than 60 days, unless such camper or amish cabin is placed within a mobile home park licensed and regulated by the state as provided in i.c. § 16-41-27.”
Tiny homesLimited
Placing a tiny home (prefabricated dwelling with no permanent foundation, typically not over 550 square feet) on a lot inside Jasonville city limits
Requires approval by the board of public works and safety after a published public hearing (sec. 152.03(b)-(e)).
Board must consider the factors in sec. 152.03(f), including size, appearance, age and condition, owner-occupancy, effect on property values, and whether placement is temporary or permanent.
Application denied if the structure is not in a livable/inhabitable condition when applied (sec. 152.03(g)).
Board decision may be appealed to the common council within 30 days of the public hearing (sec. 152.03(h)).
Tiny home definition: prefabricated dwelling with no permanent foundation that does not typically exceed 550 square feet (sec. 152.02).
tiny home definition maximum typical size: <= 550 square feet (definition only, not a standalone occupancy limit)
“no person shall place or locate a mobile home or tiny home within the corporate limits of the city without first obtaining the necessary approvals and permits as provided by this section.”
Manufactured homesLimited
Placing an individual mobile home (factory-built, transportable, not on a fully enclosed permanent foundation) on a lot inside Jasonville city limits; mobile home parks are separately licensed by the state
Individual placement requires board approval after a published public hearing (sec. 152.03(b)-(e)).
Perimeter enclosure or skirting must be installed within 60 days after placement (sec. 152.05(b)).
Owners must comply with state mobile home law and the city's unsafe building, weeds, and garbage codes (sec. 152.05(c)).
A transferee who wants to keep the home in the city must obtain a new approval (sec. 152.05(d)).
Sec. 152.05(a): the city enforces state health and sanitation standards for mobile homes and mobile home parks.
skirting or perimeter enclosure installation deadline after placement: <= 60 days
“within 60 days after they have been placed onto the location or site, all mobile homes shall have an approved perimeter enclosure or skirting installed.”
Permit processPartial
Permit process for placing a mobile home or tiny home inside Jasonville city limits only; no published general building-permit process was found
Application to the board of public works and safety on a form the board establishes, with a plot plan, structure description, location drawing and color photographs (sec. 152.03(b)).
Board sets a public hearing; notice published once in the local newspaper at least ten days before the hearing, at applicant's cost (sec. 152.03(d)).
Board decision may be appealed to the common council within 30 days of the public hearing (sec. 152.03(h)).
newspaper notice before public hearing: >= 10 days (notice published one time, at least ten days before the hearing) · appeal window after public hearing: <= 30 days
“the board will also have a notice published in the local newspaper one time, at least ten days before the hearing.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Jasonville or Greene County directly.
Building permit — New construction inside Jasonville city limits: whether a city building permit is required
Owner-builder exemption — Owner-builders constructing a home inside Jasonville city limits
Building code adopted — Construction inside Jasonville city limits: which building code is adopted and enforced
Inspections — Construction inside Jasonville city limits: inspection requirements
Certificate of occupancy — Occupancy of new homes inside Jasonville city limits
20 more unanswered
Local zoning
Zoning districts
Minimum dwelling size
Minimum lot size
Setbacks
Lot coverage
Building height
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Subdividing land
Driveway access
Building in a floodplain
Short-term rentals
Permit fees
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Jasonville publishes no rule on the point, not that none exists. Greene County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Jasonville means bringing your own water and power. The kit we’d start with: