Greene County, Indiana
Town of Bloomfield is a town in Greene County, Indiana. Septic permits inside Town of Bloomfield come from Greene County (Greene County Health Department, Environmental Health – Habitation Division · (812) 384-4496). 5 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Greene County page.
Town of Bloomfield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private sewage disposal (septic) systems on private property inside Bloomfield town limits, under the Greene County code, which applies within Greene County
“no person shall install or cause to be installed a private sewage disposal system or privy, or alter, repair, or add to an existing private sewage disposal system without first obtaining a permit from the health department.”
New dwellings or buildings with septic systems inside Bloomfield town limits, under the Greene County code
“prior to construction of any building or private residence where a private sewage disposal system is to be installed, or prior to any replacement, reinspection, expansion, or remodeling of a residence which may increase the number of bedrooms or bedroom equivalents and any addition to, alteration of, or repair of an existing sewage disposal system, the owner or agent of the owner shall obtain a written construction permit signed by the health officer.”
Septic systems inside Bloomfield town limits, under the Greene County code
“the health officer or his or her agent shall be permitted to enter upon all properties at any state of construction for the purpose of inspection, observation, measurement, sampling, and testing necessary to assure compliance with the provisions of this chapter.”
Dwellings inside Bloomfield town limits that cannot connect to a sanitary sewer, under the Greene County code
minimum septic tank capacity below the water line: >= 1000 gallons
“holding tanks may only be approved for installation where absorption field repairs cannot be made or on a temporary basis (as approved by the board) pending hookup to the sanitary sewer.”
Homes inside Bloomfield town limits served by a private septic system; sewer-connection rule from the Greene County code. Water connection rules were not found.
distance from occupied building to public sewer triggering connection: <= 300 feet (only when existing system fails or constitutes a health hazard) · time to connect after official notice: 90 days
“at such time as a public sewer comes within 300 feet of any house, building, or structure used for human occupancy, employment, recreation, or other purpose and served by a private sewage disposal system, a direct connection to the public sewer shall be required should the existing system fail or constitute a health hazard.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Bloomfield or Greene County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Bloomfield publishes no rule on the point, not that none exists. Greene County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Bloomfield means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.