Floyd County, Indiana
Franklin Township is a township in Floyd County, Indiana. Septic permits inside Franklin Township come from Franklin Township. 17 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Floyd County page.
Franklin Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Occupancy and use of land or buildings on unincorporated land inside Franklin township under the Floyd County zoning ordinance
“the floyd county plan commission hereby requires that an application be submitted for the following petitions and permits.”
Land inside Franklin township outside any incorporated city or town: Floyd County zoning (FCO-2006-06, as amended) administered by the Floyd County Building & Development Services and Plan Commission. No Franklin Township zoning ordinance was located.
“in floyd county, zoning is controlled by the floyd county zoning ordinance, fco-2006-06.”
Zoning districts applying to unincorporated land inside Franklin township under the Floyd County zoning ordinance
“the planning jurisdiction is divided into the following zoning districts for general uses.”
Single-family primary dwellings in the AR (agricultural-residential) district on unincorporated Franklin township land
minimum ground floor area: >= 950 square feet (amended per guide note (5))
“minimum ground floor area 950 square feet (amended 5)”
Lots in the AR (agricultural-residential) district on unincorporated Franklin township land
minimum lot area: >= 87120 square feet · minimum lot area (acres): >= 2 acres
“87,120 square feet (2 acres) 100 feet 100 feet 35 feet 18 feet requires connection to public water”
Primary and accessory structures in the AR (agricultural-residential) district on unincorporated Franklin township land
front yard setback: 60 feet (amended per guide note (8)) · side yard setback: 10 feet · primary rear yard setback: 20 feet · accessory rear yard setback: 10 feet
“60 feet (amended 8) 10 feet 20 feet 10 feet”
AR (agricultural-residential) district lots on unincorporated Franklin township land
maximum lot coverage: <= 35 percent
“square footage of all primary structures, accessory structures and impervious surface shall not exceed:) 35 percent”
AR (agricultural-residential) district structures on unincorporated Franklin township land
maximum primary structure height: <= 35 feet · maximum accessory structure height: <= 18 feet
“87,120 square feet (2 acres) 100 feet 100 feet 35 feet 18 feet requires connection to public water”
On-site sewage systems on land inside Franklin township (Floyd County Health Department service area)
health department phone: (812) 948-4726
“contact the floyd county health department at (812) 948-4726”
New construction served by an on-site sewage system on land inside Franklin township
“pay for and pick up septic permit to submit to building department”
New on-site sewage systems for new construction inside Franklin township
“the house and any other planned construction (i.e. pole barn, swimming pool, deck, patio, geothermal system, etc) must be marked prior to the site survey or an additional site survey or site approval will be required.”
New homes in the AR (agricultural-residential) district on unincorporated land inside Franklin township
“87,120 square feet (2 acres) 100 feet 100 feet 35 feet 18 feet requires connection to public water may use either septic or sanitary sewer system”
Driveways serving new residential construction on unincorporated land inside Franklin township
“the location of all existing and proposed driveways”
Construction in the mapped floodplain or floodway on unincorporated land inside Franklin township
“under the provisions of ic 14-28-1 a permit for construction in a floodway from the indiana department of natural resources is required prior to the issuance of a local building permit for any excavation, deposit, construction, or obstruction activity located in the floodway.”
Septic site survey fee for new construction on land inside Franklin township
septic site survey fee: 50 USD (waived for septic repair permits)
“an application for an on-site sewage system must be filled out and the $50.00 site survey fee paid.”
Residential building permit applications on unincorporated land inside Franklin township
“applications are completed using a pdf document and can be submitted online or in person.”
“fchd will provide the homeowner with a minimum design specification sheet, which specifies the minimum requirements for a septic system and set-a-side area (if applicable) for the property. *this is not an approval.*”
We looked and could not find an official answer yet. Silence is not permission; ask Franklin Township or Floyd County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Franklin Township publishes no rule on the point, not that none exists. Floyd County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Franklin Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.