Bolthole Index

DeKalb County, Indiana

Zoning, building permits and septic rules in Auburn, Indiana

Auburn is a city in DeKalb County, Indiana. Auburn adopts its own zoning, so inside its limits Auburn’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the DeKalb County page.

Answers from the rulebook for Auburn

Auburn’s own rules

  • Building permitRequired

    New buildings, additions, remodels, sheds, garages, decks, fences, foundation work, electrical, plumbing and utility connections inside Auburn city limits, as listed by the city.

    • The city's FAQ lists when a permit is required; new buildings are on that list.
    • Construction may proceed after the permit is issued, so status is conditional.
    • The list is the city's FAQ; the adopted code text that imposes the duty was not opened.
    “the following are times when a permit is required: additions decks / pergolas demolitions electrical work fences foundation work garages / carports gazebos new buildings and changes to existing permanent signs and temporary signs plumbing work remodels sheds / yard barns swimming pools utilities: sewer connection and tap; water connection, meter and tap; irrigation meters work in the right-of-way”
  • InspectionsRequired

    Permitted construction inside Auburn city limits; the city's building inspector inspects the work during construction and at completion.

    • The required inspections are included in the building permit fee, per the same FAQ.
    • The permit applicant must call for each inspection at least 24 hours before it is needed, per the FAQ.
    • Special re-inspection fee is $40 per the FAQ.

    re-inspection fee: 40 USD (special inspection fee for required re-inspection)

    “to ensure compliance with these safety codes, the building inspector visits the project during construction and upon completion.”
  • Certificate of occupancyRequired

    Construction projects inside Auburn city limits that require a building permit, before occupancy or use of the building.

    • The certificate will not be issued until all electrical, mechanical and plumbing work is complete and address numbers are posted on the building, per the FAQ.
    • There is no fee for a certificate of occupancy; a conditional certificate of occupancy costs $30 and is issued only in rare circumstances, per the FAQ.
    • The FAQ's fee statement is not dated; no effective date is stated.

    conditional certificate of occupancy fee: 30 USD (standard certificate of occupancy has no fee)

    “a certificate of occupancy (c. of o.) is required for all construction projects requiring a building permit to the occupancy or use of the building.”
  • Local zoningPresent (with conditions)

    Land inside Auburn city limits, Indiana (DeKalb County). The city's Unified Development Ordinance (UDO) is the zoning and development document the city's Building, Planning & Development department administers.

    • The UDO page describes the document as a guideline and as a local policy instrument; the adopted legal status of the UDO was not confirmed from the ordinance text because the full UDO PDF could not be opened.
    • The page says the UDO was last updated on September 17, 2024; this is a revision date, not an effective or adoption date, so effective_at is null.
    • The same page says the UDO also covers the city's extra-territorial district; this claim does not extend to any area outside city limits.
    “the document features development standards set forth by the auburn building, planning & development department and approved by the auburn common council and the auburn plan commission.”
  • Zoning districtsPublished (with conditions)

    Land inside Auburn city limits, Indiana: the city publishes a zoning map for its zoning districts.

    • The map is listed as a city document (Auburn Zoning Map, August 2026, DocumentCenter/View/2183); the map itself was not opened, so the district names and boundaries are not recorded here.
    • The zoning district list inside the UDO was not opened.
    “documents auburn zoning map august 2026 bpd annual report 2025 2026 facade improvement grant program packet 2026”
  • Permit feesPublished

    Building, planning and development permits issued by the City of Auburn, Indiana.

    • The city's Building Permits & Fees page lists the fees, including general building, demolition, improvement location (residential $25, non-residential $50), fence and water well permits; the fee schedule states no effective or revision date.
    • The page's list of fees is the published schedule opened; it does not give an adoption date.
    • Electrical and plumbing fees are on the same page with separate per-square-foot and minimum amounts; they are not all recorded as parameters.

    general building permit fee: per 0.1 USD per square foot under roof ($35.00 minimum) · general building permit minimum fee: 35 USD · demolition permit fee: 50 USD · improvement location permit fee, residential: 25 USD (non-residential is $50.00) · fence permit fee: 25 USD · water well permit fee: 35 USD

    “permit fees demo $50.00 general building $0.10 per square foot under roof, $35.00 minimum”
  • Permit processPublished

    Obtaining a building, utility-connection or electrical permit for land inside Auburn city limits.

    • Apply through the Building, Planning & Development department at 210 S Cedar St, second floor, Auburn, IN 46706 (page address).
    • The permit applicant must call for each inspection at least 24 hours before it is needed.
    • Contractors often handle the water tap and electrical call-in steps, per the FAQ.
    “your first step is to contact auburn's building, planning, and development department and apply for a permit.”

Rules another office applies inside Auburn

Auburn does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted

    Residential construction inside Auburn city, Indiana, under the Indiana Residential Code, 675 IAC 14-4.4 (2020 edition), which the state lists as the code in effect.

    • Edition and effective date come from the state FPBSC rules table: 675 IAC 14-4.4 is the 2020 Indiana Residential Code, effective 12/26/2019, and 675 IAC 14-4.3 is listed as repealed effective 12/26/2019.
    • The state table does not state the scope limits; the one- and two-family dwelling scope was not verified from an opened rule text.
    • The city's Building Permits & Fees page says the building department enforces codes 'established by both city and state agencies' and points to code of ordinances chapters 151, 153, 155, 158, 159, 163 and 165; those city chapters were not opened, so city-level amendments are not recorded.
    • The Indiana Building Code (675 IAC 13) and any 2026 successor were not opened.
    “675 iac 14-4.4 2020 indiana residential code free access (model code with incorporated amendments) 2018 international residential code for one- and two-family dwellings, first printing currently in effect effective: 12/26/2019”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Auburn or DeKalb County directly.

  • Owner-builder exemption — Owner-builder permit rules for an owner building or renovating a home inside Auburn city limits.
  • Minimum dwelling size — Minimum dwelling size for a single-family home inside Auburn city limits (main single-family residential district).
  • Minimum lot size — Minimum lot size for the main single-family residential district and any agricultural or rural-residential district inside Auburn city limits.
  • Setbacks — Yard setbacks for the main single-family residential district inside Auburn city limits.
  • Lot coverage — Maximum lot coverage for the main single-family residential district inside Auburn city limits.
17 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Auburn publishes no rule on the point, not that none exists. DeKalb County’s page lists the county offices to call.

← All of DeKalb County: county rules, score and offices