The Town of Mulberry, Indiana uses the Clinton County Area Plan Commission for building permits and inspections; applications start digitally by email.1 The commission also administers zoning and subdivision ordinances for Mulberry.2 Private sewage disposal requires a town permit from the Superintendent, with additional Clinton County Health Department requirements potentially applying.34
At a glance
- Building permits
- Clinton County Area Plan Commission; digital applications by email1
- Zoning and subdivisions
- Area Plan Commission serves Mulberry; request the applicable district standards2
- Private sewage disposal
- Town Superintendent permit plus county health requirements; town permit and inspection fee is $37534
- Public sewer
- Qualifying properties must connect within 90 days after written notice when the sewer is within 300 feet of the property line5
- RV and tiny-home living
- We could not confirm parcel-specific occupancy rules; ask Area Plan before buying6
- Private wells
- We could not confirm a Mulberry well-permit requirement; ask Clinton County Health Department78
Who to call
Building permits
Clinton County Area Plan Commission
Building permits, building inspections, zoning questions and subdivision administration inside Mulberry. Town sewage approvals and county health review are separate.
2 E Washington St. Ste 104
Also useful
Contact point for reaching the town Superintendent about sewer connections and town private sewage disposal approval.
123 S Glick St. Mulberry, IN 46058
Septic permits
Clinton County Health Department
County health review and residential onsite sewage permits; coordinate with Mulberry’s separate town approval.
1234 Rossville Ave., Ste B Frankfort, IN 46041
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Town of Mulberry means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Town of Mulberry, IN?
Start a Mulberry home project with the Clinton County Area Plan Commission, which issues building permits and arranges inspections for the town.1 Email project details to the commission to begin the digital application process.6
The commission’s published exceptions include portable structures of 200 square feet or less, provided setbacks and other ordinance standards are met.6 Decks under 30 inches above natural grade do not need a building permit unless attached to an existing structure.6 Ask Area Plan to confirm that a proposed shed or deck qualifies before construction; the shed exception still requires compliance with placement standards.6
Who handles building permits and zoning for the Town of Mulberry?
The Clinton County Area Plan Commission explicitly serves Mulberry, so the county commission is the correct building-permit counter for an address inside town.6 Send project details to the commission’s application email listed above; the published process is digital.6 Mulberry building inspections require at least 24 hours’ notice, a valid building permit and prepaid inspections before scheduling.1
Building approval does not replace Mulberry’s private sewage disposal approval: the town Superintendent signs that separate permit, and county health requirements may also apply.34 Contact Town Hall to reach the Superintendent and Clinton County Health Department for the health review.910
Does the Town of Mulberry have zoning, lot-size and setback rules?
Mulberry is served by the Clinton County Area Plan Commission, which administers zoning and subdivision ordinances.2 Obtain the official Unified Development Ordinance from the commission rather than treating a downloaded copy as the final authority.2 Ask Area Plan to identify the parcel’s district and the standards that apply to the proposed use.6
We could not confirm Mulberry’s district-specific minimum lot sizes, setbacks, lot coverage or height limits; request those answers from Area Plan before committing to a building layout.6 A small portable structure’s building-permit exception does not waive setback guidelines or other location standards.6
How do septic permits and sewer connections work in the Town of Mulberry?
Mulberry requires sewer connection for qualifying properties abutting a street, alley or right-of-way containing public sanitary or combined sewer, when the sewer is within 300 feet of the property line; connection is due within 90 days after written notice.5 Where public sewer is unavailable under the town code, private sewage disposal requires a written Superintendent permit before construction and a $375 town permit and inspection fee when applying.3
County health approval remains part of residential onsite sewage permitting: Clinton County Health Department handles septic permits, and applications require a soils evaluation and compliant plans.1011 Mulberry’s Superintendent must receive notice for final inspection before underground portions are covered; the town code calls for inspection within 72 hours after notice.12 Coordinate both offices’ inspection procedures before covering the system.413
Can you live in an RV or tiny home in the Town of Mulberry?
We could not confirm a Mulberry rule authorizing residential RV occupancy, temporary camping or tiny-home occupancy on a private lot; ask Area Plan about the exact proposed dwelling and use.6 Request answers about occupancy, accessory dwellings and any minimum dwelling-size requirement before purchasing a unit.6
Mulberry’s sewage rules still matter to an off-grid proposal: private sewage disposal is allowed only through the town code’s compliant system, permit and inspection route where public sewer is unavailable.14 Indiana’s residential onsite sewage rules do not allow drywells or cesspools as sewage treatment.15 Sewage approval alone does not settle the unconfirmed RV or tiny-home land-use question; ask Area Plan separately.6
Building a home in the Town of Mulberry: what steps come first?
- Ask Area Plan to identify the parcel’s zoning and review the proposed home, placement and any subdivision proposal.62
- Ask the town Superintendent about sewer availability; if private sewage disposal is needed, arrange town approval and county health review before construction.5311
- Email project details to Area Plan to start the building-permit application.1
- Schedule building inspections with the required notice and prepaid inspections, and coordinate separate sewage inspections before covering underground work.11213
We could not confirm a Mulberry owner-builder exemption or certificate-of-occupancy requirement; ask Area Plan to resolve both before setting the construction schedule.6 For land outside town, use the Clinton County guide for the unincorporated-area building and zoning answers.1617
Watch-outs
- Mulberry’s $375 residential or commercial building-sewer permit and inspection fee is a sewer approval fee, not the general building-permit price.18
- We could not confirm private-well approval requirements inside Mulberry; ask Clinton County Health Department before planning a well.78
- A Mulberry agricultural-purpose exemption depends on use and location; a state design-release exemption does not establish a blanket exemption from local zoning or inspections.1920
Sources
- Clinton County - Area Plan (Town of Mulberry), quoted and re-checked
- Clinton County Area Plan zoning and subdivision administration (Town of Mulberry), quoted and re-checked
- § 51.03 Private Sewage Disposal Systems (Town of Mulberry), quoted and re-checked
- § 51.03 Private Sewage Disposal Systems (Town of Mulberry), quoted and re-checked
- § 51.02 Mandatory Connection (Town of Mulberry), quoted and re-checked
- Clinton County Area Plan Commission (clintonco.com)
- Recommended Standards For Private Water Wells (Indiana statewide rule), quoted and re-checked
- Clinton County Health Department (in.gov)
- Town of Mulberry Town Hall (townofmulberry.com)
- Clinton County: Staff, quoted and re-checked
- 410 IAC 6-8.3 Residential Onsite Sewage Systems, quoted and re-checked
- § 51.03 Private Sewage Disposal Systems (Town of Mulberry), quoted and re-checked
- 410 IAC 6-8.3 Residential Onsite Sewage Systems, quoted and re-checked
- codelibrary.amlegal.com (Town of Mulberry), quoted and re-checked
- 410 IAC 6-8.3 Residential On-Site Sewage Systems (Indiana statewide rule), quoted and re-checked
- Clinton County Area Plan Commission (2026 county census)
- Clinton County - Area Plan (2026 county census)
- § 51.03 Private Sewage Disposal Systems (Town of Mulberry), quoted and re-checked
- Class 1 Structure Agricultural Purpose Exemption (Town of Mulberry), quoted and re-checked
- Plan Review FAQs (Indiana statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.