Boone County, Indiana
Washington Township is a township in Boone County, Indiana. Septic permits inside Washington Township come from Boone County (Boone County Health Department - Environmental Health Division · 765-483-4458). 12 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Boone County page.
Washington Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Zoning districts applying to land in the unincorporated part of Washington township under the Boone County Area Plan Commission ordinance
“the jurisdiction area is hereby classified and divided into districts designated in table 1, land use districts”
Single-family residential lots in the unincorporated part of Washington township under the Boone County zoning ordinance
minimum lot area with public sewers: >= 5000 sq ft (all districts with public sewers) · minimum lot area without public sewers: >= 2 acre (3 acres in the re district)
“minimum lot area: 5,000 square feet in all districts with public sewers. 2 acres in all districts without public sewers, and 3 acres in the re district”
Residential lots in the unincorporated part of Washington township under the Boone County zoning ordinance
maximum lot coverage range: 50% to 70% percent (varies by district; mapping not confirmed)
“maximum lot coverage 50% 50% 60% 60% 70% 70% 70% 70% 70% 70% 70%”
Accessory dwelling units on residential lots in the unincorporated part of Washington township under the Boone County zoning ordinance
“a separate driveway from any public right-of-way shall not be permitted”
On-site sewage (septic) systems on land inside Washington township; the Boone County Health Department administers them under state rule 410 IAC 6-8.3 and Boone County ordinance 2012-04
“the boone county health department reserves the legal authority to reject any site or proposed system that does not meet the requirements of the indiana state department of health rule 410 iac 6-8.3 and/or boone county ordinance 2012-04.”
New on-site septic system serving a home on land inside Washington township
plan review fee: 150 USD (submitted with soil report, application and floor plan)
“procedures for obtaining an on-site sewage disposal permit step 1: submit a soil report, completed application, floor plan”
Septic system inspections for homes inside Washington township, as shown in the county on-site sewage permit procedure
“a portion of this tile will need to be uncovered for an inspection prior to permit approval”
New single-family homes on lots in the unincorporated part of Washington township under the Boone County zoning ordinance
lot size threshold for required public water and sewer: < 1 acre (lots less than one acre)
“public water & public sewer connection: required in all districts for lots that are less than one acre in size.”
Subdivision of land in the unincorporated part of Washington township; major subdivision approvals are made by the Boone County Area Plan Commission
“the area plan commission has public hearings on text amendments to the subdivision control and the zoning ordinance, map amendments (rezones), development plan reviews and major subdivision approvals.”
Residential lots in the unincorporated part of Washington township that use a private access driveway
minimum road frontage width: >= 100 feet (private access driveway lots; major subdivisions may reduce by up to 20%)
“road frontage: all residential lots utilizing a private access driveway for access shall have frontage on a public road. the minimum width of that frontage is 100’ of continuous width which extends the depth of the lot.”
Building permit fees charged by the Boone County Area Plan Commission for work in the unincorporated part of Washington township
base building permit fee: 160 USD (includes up to 2 hours of structural plan review)
“fee schedule building permit fees - effective 3/4/26”
Building permit process in the unincorporated part of Washington township through the Boone County Area Plan Commission
“after your application is reviewed, you will receive a fee calculation worksheet that itemizes how the permit fee was derived.”
We looked and could not find an official answer yet. Silence is not permission; ask Washington Township or Boone County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Washington Township publishes no rule on the point, not that none exists. Boone County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Washington Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.