Boone County, Indiana
Jackson Township is a township in Boone County, Indiana. Septic permits inside Jackson Township come from Boone County (Boone County Health Department - Environmental Health Division · 765-483-4458). 14 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Boone County page.
Jackson Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction on land in unincorporated Boone County, including unincorporated land inside Jackson township, administered by the Boone County Area Plan Commission office
“issue improvement location permits (building permits) for new construction as directed by the boone county zoning ordinance, building regulations and boone county subdivision control ordinance.”
Permits issued by the Boone County Area Plan Office for unincorporated land, including unincorporated land inside Jackson township
“any petition or permit granted through the boone county area plan office is subject to at least one site inspection before it will be approved.”
Zoning districts for unincorporated land inside Jackson township, under the Boone County Zoning Ordinance
“the jurisdiction area is hereby classified and divided into districts designated in table 1, land use districts”
Residential lots in unincorporated Boone County, including unincorporated land inside Jackson township; no district is named in the excerpt
minimum lot area with public sewers: >= 5000 square feet (all districts with public sewers) · minimum lot area without public sewers: >= 2 acres (3 acres in the RE district)
“minimum lot area: 5,000 square feet in all districts with public sewers. 2 acres in all districts without public sewers, and 3 acres in the re district”
Rear and side yard setbacks for structures on unincorporated land inside Jackson township
minimum rear yard for primary structures: >= 20 feet (all districts) · minimum side yard: >= 5 feet (agricultural district)
“minimum rear yard for primary structures: 20 feet in all districts”
“minimum front yard (unincorporated areas): in all districts, 20 feet from the right of way or 70 feet from the center of the road, whichever is greater (not applicable to flag lots)”
On-site sewage (septic) systems on land inside Jackson township, administered by the Boone County Health Department
“the boone county health department reserves the legal authority to reject any site or proposed system that does not meet the requirements of the indiana state department of health rule 410 iac 6-8.3 and/or boone county ordinance 2012-04.”
New on-site sewage disposal (septic) system on land inside Jackson township
plan review fee: 150 USD
“step 1: submit a soil report, completed application, floor plan (maximum 11” x 17” – minimum 8 ½” x 11”) and $150.00 plan review fee to this office.”
Residential development in unincorporated Boone County, including unincorporated land inside Jackson township; the county rule addresses subdivisions and lot size rather than a general connection duty for a single new home
major subdivision lot threshold: >= 15 lots
“utility connection: required for major residential subdivisions with 15 lots or more.”
Division of land into lots in unincorporated Boone County, including unincorporated land inside Jackson township
“enforce the regulations set forth by the boone county zoning ordinance, building regulations and boone county subdivision control ordinance.”
Private access driveways serving lots on unincorporated land inside Jackson township
maximum private driveway length: <= 1320 feet
“maximum driveway length: no private access driveway or private driveway shall extend the distance of more than one-thousand three hundred twenty (1320) feet in length from the public right-of-way.”
Development in mapped flood hazard areas on unincorporated land inside Jackson township
“the boone county area plan is also responsible for administering the floodplain ordinance adopted from the state of indiana.”
Septic (on-site sewage) permit plan review fee for land inside Jackson township; building permit fees not verified
septic plan review fee: 150 USD (plus permit fees paid at pickup, not stated in the excerpt)
“step 1: submit a soil report, completed application, floor plan (maximum 11” x 17” – minimum 8 ½” x 11”) and $150.00 plan review fee to this office.”
Permit process for new construction on unincorporated land inside Jackson township, administered by the Area Plan Office
“we work to assist the boards and the petitioners with the workings of the requirements of the boone county zoning ordinance and boone county subdivision control ordinance.”
We looked and could not find an official answer yet. Silence is not permission; ask Jackson Township or Boone County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Jackson Township publishes no rule on the point, not that none exists. Boone County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Jackson Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.