Adams County, Indiana
French Township is a township in Adams County, Indiana. Septic permits inside French Township come from the county and state together. 8 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Adams County page.
French Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction and remodel projects inside French township, which lies in the rural (unincorporated) area that the Adams County Building and Planning Department serves
“issue building permits for all new construction and remodel projects on both residential and commercial buildings”
Building codes enforced for construction inside French township in the rural (unincorporated) area of Adams County
“inspect projects in all phases of construction to insure the state and local building codes are upheld and enforced”
Construction projects inside French township in the rural (unincorporated) area served by the Adams County Building and Planning Department
“inspect projects in all phases of construction to insure the state and local building codes are upheld and enforced”
Residential on-site sewage systems for a dwelling not connected to a sanitary sewer, inside French township
“the local health department shall issue or deny, in writing to the owner, a residential on-site sewage system construction permit”
New residence or other dwelling inside French township that will not be connected to a sanitary sewer, before construction, placement of a manufactured or mobile home, or addition of plumbing
permit decision period after application and plan submittal: 30 days (amendment text shows forty-five (45) struck and thirty (30) inserted; confirm in final effective rule)
“the owner, or agent of the owner, shall obtain a written construction permit, signed by the health officer, for construction of a residential on-site sewage system prior to the”
Residential on-site sewage system installed inside French township under a construction permit
notice before covering subsurface work: >= 48 hours (applies only if the local health board has not published inspection procedures; otherwise use the published procedure)
“the permittee shall notify the health officer or his or her the health officer's designee when the work is ready for final inspection”
New construction inside French township in the rural (unincorporated) area served by the Adams County Building and Planning Department, where the flood zone map applies
“issue location permits for any new construction ensuring it is in compliance with zoning and flood map parameters”
Permit process for construction inside French township, as administered by the Adams County Building and Planning Department
“the adams county building and planning department has jurisdiction over the rural areas of adams county as well as the towns of geneva and monroe”
We looked and could not find an official answer yet. Silence is not permission; ask French Township or Adams County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that French Township publishes no rule on the point, not that none exists. Adams County’s page lists the county offices to call.