Zoning, building permits and septic rules in French Township, Indiana

French Township is a township in Adams County, Indiana. Septic permits inside French Township come from the county and state together. 8 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Adams County page.

Answers from the rulebook for French Township

Rules another office applies inside French Township

French Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitRequired

    New construction and remodel projects inside French township, which lies in the rural (unincorporated) area that the Adams County Building and Planning Department serves

    • The county page states the department issues building permits for all new construction and remodel projects on both residential and commercial buildings; it does not name French township, so applicability assumes French township is outside the incorporated towns of Geneva and Monroe and outside any city.
    • Construction may proceed only after the permit is issued.
    “issue building permits for all new construction and remodel projects on both residential and commercial buildings”
  • Building code adoptedAdopted (with conditions)

    Building codes enforced for construction inside French township in the rural (unincorporated) area of Adams County

    • The county page refers to 'state and local building codes' being upheld and enforced; it does not name the specific code edition. The Indiana Residential Code (675 IAC 14) was seen only in search results and was not opened, so its edition is not confirmed here.
    “inspect projects in all phases of construction to insure the state and local building codes are upheld and enforced”
  • InspectionsRequired

    Construction projects inside French township in the rural (unincorporated) area served by the Adams County Building and Planning Department

    • The county page states the department inspects projects in all phases of construction; it does not name French township, so applicability assumes French township is in the rural area the department serves.
    • The page does not state inspection frequency or the individual inspections required.
    “inspect projects in all phases of construction to insure the state and local building codes are upheld and enforced”
  • Who permits septicMixed (with conditions)

    Residential on-site sewage systems for a dwelling not connected to a sanitary sewer, inside French township

    • The state rule (410 IAC 6-8.3) sets the standard; the local health department (Adams County Health Department) issues the construction permit under it.
    • Section 53(c): approval of a site by the local plan commission or the county recorder does not constitute approval by the local health officer.
    “the local health department shall issue or deny, in writing to the owner, a residential on-site sewage system construction permit”
  • Septic permitRequired

    New residence or other dwelling inside French township that will not be connected to a sanitary sewer, before construction, placement of a manufactured or mobile home, or addition of plumbing

    • Construction may proceed only after a written construction permit signed by the health officer is issued; the permit is required before the listed work starts.
    • Section 53(a) also covers replacement or alteration of an existing system and adding a system to an existing residence without one.
    • Section 53(b): the local health department may not issue a permit for a new system without written approval of the state department, except as provided in section 52(g).
    • Section 53(c): plan commission or county recorder site approval is not health officer approval.
    • Individual lots in subdivisions with plats approved and recorded before December 21, 1990 are exempt from the listed provisions (section 53(n)); the amendment text does not state the exemption fully in the excerpt.
    • Filed text shows 'forty-five (45) thirty (30) days' with tracked-change marks; confirm the final decision period in the effective rule.

    permit decision period after application and plan submittal: 30 days (amendment text shows forty-five (45) struck and thirty (30) inserted; confirm in final effective rule)

    “the owner, or agent of the owner, shall obtain a written construction permit, signed by the health officer, for construction of a residential on-site sewage system prior to the”
  • Septic inspectionRequired

    Residential on-site sewage system installed inside French township under a construction permit

    • The permittee must notify the health officer when work is ready for final inspection, using the local board's published procedure; if none is published, notice is at least 48 hours or 2 working days before subsurface portions are covered.
    • Requirements of the permit are not fulfilled until installation is completed to the health officer's satisfaction (section 53).

    notice before covering subsurface work: >= 48 hours (applies only if the local health board has not published inspection procedures; otherwise use the published procedure)

    “the permittee shall notify the health officer or his or her the health officer's designee when the work is ready for final inspection”
  • Building in a floodplainRequired

    New construction inside French township in the rural (unincorporated) area served by the Adams County Building and Planning Department, where the flood zone map applies

    • Location permits must confirm compliance with zoning and flood map parameters; the county page does not give the flood-zone rules or elevation requirements, and does not confirm whether French township parcels lie in a mapped flood zone.
    • The county page says the department keeps and maintains current flood zone maps.
    “issue location permits for any new construction ensuring it is in compliance with zoning and flood map parameters”
  • Permit processPartial

    Permit process for construction inside French township, as administered by the Adams County Building and Planning Department

    • The county page lists the department's services (building, electrical and location permits, addresses) and its office at 313 W Jefferson Street, Suite 338, Decatur, IN 46733 (phone 260-724-5305), but gives no step-by-step procedure or application form.
    • The page links a fee schedule that was not opened; fees are not recorded here.
    “the adams county building and planning department has jurisdiction over the rural areas of adams county as well as the towns of geneva and monroe”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask French Township or Adams County directly.

  • Owner-builder exemption — Owner-builder exemption from permits or licensing inside French township
  • Certificate of occupancy — Certificate of occupancy for new construction inside French township
  • Local zoning — Whether French township itself adopts and administers a zoning ordinance
  • Zoning districts — Zoning districts that would apply inside French township
  • Minimum dwelling size — Minimum dwelling size inside French township
17 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that French Township publishes no rule on the point, not that none exists. Adams County’s page lists the county offices to call.