St. Clair County, Illinois
Village of New Baden is a village in St. Clair County, Illinois. Village of New Baden adopts its own zoning, so inside its limits Village of New Baden’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the St. Clair County page.
Residential structures inside New Baden village limits at each occupancy (occupancy inspection by the village inspector)
“the purpose of the inspections is to maintain the quality of the village's housing and building stock over time by requiring violations to be corrected prior to each occupancy.”
Residential structures inside New Baden village limits whenever occupancy is established or changed (homes, trailers, apartments)
“an occupancy permit is required from the village of new baden whenever occupancy is established or changed in a residential structure.”
Land inside New Baden village limits; the village's own zoning code (Ordinance 2013-07-A) administered by the Village Building and Zoning Department
“the zoning code was updated by ordinance 2013-07-a; applications, informational handouts, and fees have changed.”
Village water and sewer tap fees for properties inside and outside New Baden village corporate limits (recorded under permit_fees as the nearest topic; these are utility tap fees, not building permit fees)
water tap fee, inside corporate limits: 1000 USD (excludes meter and additional supplies) · sewer tap fee, inside corporate limits: 1500 USD · water tap fee, outside corporate limits: 1500 USD (excludes meter and additional supplies) · sewer tap fee, outside corporate limits: 2000 USD
“water and sewer tap fees (effective 09/12/06) inside corporate limits water tap fee - $1,000.00 (does not include cost of meter and any additional supplies.)”
“the fee for the occupancy permit inspection is $50.00.”
Occupancy inspection/permit process inside New Baden village limits; the village has not published the building permit application process on the captured pages
“the process is simple and requires an application and fee to set up an inspection time with the village inspector.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of New Baden or St. Clair County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of New Baden publishes no rule on the point, not that none exists. St. Clair County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of New Baden means bringing your own water and power. The kit we’d start with: