St. Clair County, Illinois
Village of Hecker is a village in St. Clair County, Illinois. Village of Hecker adopts its own zoning, so inside its limits Village of Hecker’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 22, 2026. Rules for unincorporated land are on the St. Clair County page.
Occupancy-permit inspection of single-family, manufactured and mobile homes inside the Village of Hecker (not construction inspections)
single family/manufactured home/mobile home inspection fee: 140 USD
“single family/manufactured home/mobile home inspection fee – $140.00 this fee is required to be paid before an inspection will be scheduled and is valid for a period of one (1) year.”
Residences (owner-occupied or non-owner-occupied) and commercial property inside the Village of Hecker
occupancy permit fee: 25 USD · certificate of occupancy fee: paid at time certificate is issued
“an occupancy permit is required on any residence (owner occupied or non-owner occupied) or commercial property located in the village of hecker.”
Land inside the Village of Hecker corporate limits (the village's own zoning, per its zoning page and code table of contents)
“the village enforces zoning codes and manages building permits and occupancy permits.”
Village of Hecker: availability of village water and sewer service (mandatory-connection rule not verified)
“the village provides water and sewer service to the village of hecker and some of the surrounding area.”
Land divisions inside the Village of Hecker (the village subdivision code)
“chapter 33 - street regulations chapter 34 - subdivision code chapter 36 - taxation”
Occupancy permit and inspection fees for the Village of Hecker
occupancy permit fee: 25 USD · single family/manufactured home/mobile home inspection fee: 140 USD · multi-family rental structure inspection fee: 140 USD per dwelling unit · copy of an existing occupancy permit fee: 20 USD
“occupancy permit fee – $25.00 certificate of occupancy fee shall be paid at the time the certificate is issued.”
Occupancy permit process in the Village of Hecker
“it shall be the responsibility of the tenant/occupant to apply for the certificate of occupancy after the application for occupancy has been approved”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Hecker or St. Clair County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Hecker publishes no rule on the point, not that none exists. St. Clair County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Hecker means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.