St. Clair County, Illinois
Fayetteville Township is a township in St. Clair County, Illinois. Septic permits inside Fayetteville Township come from St. Clair County (St. Clair County Health Department – Water & Private Sewage · 618-233-7769). 20 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the St. Clair County page.
Fayetteville Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Permitted construction on unincorporated land inside Fayetteville township, inspected by the St. Clair County Building & Zoning Department
re-inspection fee: 75 USD (per failed inspection)
“final building inspection: following completion but prior to occupancy.”
Unincorporated land inside Fayetteville township (outside the village of Fayetteville and any other zoned municipality). This is the county's zoning, not a township ordinance; it applies here unless Fayetteville township adopts its own zoning, which was not found.
“it is hereby declared that the provisions of this code shall apply to all unzone municipalities and to all properties in the unincorporated part of st. clair county”
Unincorporated land inside Fayetteville township; the district applying to a given parcel comes from the county zone district map
“rr-1 1 per 1 acre 1 acre 125’ 150’ 25’ 25’ 40 15”
Any residential lot inside Fayetteville township that needs a private sewage disposal system (septic), under the St. Clair County Health Department code
minimum lot area for private sewage system: >= 1 acre usable space (may be greater on health department finding; smaller allowed for community sewage collection)
“minimum lot size for a residential structure requiring a private sewage disposal system shall be one (1) acre usable space in size excluding lakes, ponds and easements.”
“sr-1 1 per 20,000 sq. ft. 100’ 150’ 25’ 25’ 30 15”
“rr-1 1 per 1 acre 1 acre 125’ 150’ 25’ 25’ 40 15”
Single-family residence district SR-1 on unincorporated land inside Fayetteville township
front yard depth: 25 ft · side yard abutting a street: 25 ft · side yards total both: 30 ft · side yard minimum either: 15 ft
“sr-1 1 per 20,000 sq. ft. 100’ 150’ 25’ 25’ 30 15”
“rr-1 1 per 1 acre 1 acre 125’ 150’ 25’ 25’ 40 15”
Lots in the county conservation overlay zone (flood, inundation and ponding lands) on unincorporated land inside Fayetteville township; not a general residential lot-coverage limit
maximum share of lot disturbed: <= 20 percent
“40-4-89 lot requirement. any lot shall contain a minimum of three (3) acres and not more than twenty percent (20%) of the lot or site shall be used, modified and otherwise disturbed by grading, placement of fill, removal of woodland, construction of buildings, provision of access roads, parking facilities and driveways, and other such on-site facilities or structures.”
Manufactured homes on unincorporated land inside Fayetteville township
“40-5-12 manufactured home. the following requirements and standards shall apply to any manufactured home located in any zoning district in st. clair county unless otherwise specifically provided therein.”
Private sewage disposal (septic) systems on land inside Fayetteville township; the St. Clair County Health Department issues permits and inspects, under the county's private sewage code
“(b) all applications for permits granted under the provisions of this code shall be made to the health department.”
Construction, alteration or extension of a private sewage disposal system on land inside Fayetteville township
initial construction permit fee: 300 USD (charged for initial construction, alteration or extension)
“(a) it shall be unlawful for any person to construct, alter or extend individual domestic sewage disposal systems within st. clair county unless he/she holds a valid permit issued by the health department”
Private sewage disposal systems on land inside Fayetteville township
operational inspection fee: 300 USD (on sale or refinancing application)
“(c) an operational inspection may be conducted on any private sewage disposal system which is part of a sale of property. or for refinancing any time an application for inspection is submitted to the health department. there shall be a three hundred dollar ($300.00) fee charged for the inspection.”
Household sewage disposal on land inside Fayetteville township that is not on a sewer
“(a) it shall be unlawful for any person to construct, alter or extend individual domestic sewage disposal systems within st. clair county unless he/she holds a valid permit issued by the health department”
New single-family home inside Fayetteville township where a sanitary sewer is available
sewer availability distance for single-family residence: <= 300 ft (per health department code reasonable-distance rule)
“the health department shall refuse to grant a p.ermit for the construction of a private sewage disposal system where a sanitary sewage system is available.”
Structures used for agriculture on unincorporated land inside Fayetteville township
“exempt structures for agricultural use exempt public school structures exempt township structures”
Dividing unincorporated land inside Fayetteville township into two or more lots
“except as otherwise provided in this code the division of land creating two or more lots shall require a plat recorded with the county recorder of deeds.”
Building permit applications for manufactured or modular homes and other construction in the flood zone on unincorporated land inside Fayetteville township
“flood elevation certificate (if applicable).”
County building permit fees for unincorporated land inside Fayetteville township
single-family residence fee, 2,500 sq ft and under: 500 USD · single-family residence fee, 2,501 sq ft and larger: 700 USD
“$500 single family residence 2,500 sq ft and under $700 single family residence 2,501 sq ft and larger”
Building permit application and issuance on unincorporated land inside Fayetteville township
“a permit for any proposed work shall be invalid within 12 months after the date it is issued.”
We looked and could not find an official answer yet. Silence is not permission; ask Fayetteville Township or St. Clair County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Fayetteville Township publishes no rule on the point, not that none exists. St. Clair County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Fayetteville Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.