Shelby County, Illinois
Holland Township is a township in Shelby County, Illinois. Septic permits inside Holland Township come from Shelby County (Shelby County Public Health Department · 217-774-2355). 8 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Shelby County page.
Holland Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New homes (frame, manufactured, modular, mobile or pole built), additions and accessory buildings on land in unincorporated Holland township, Shelby County. Administered by the Shelby County Zoning Office.
new residence building permit fee: 175 USD · residential addition building permit fee: 125 USD · accessory building building permit fee: 125 USD · construction without a permit fine: <= 500 USD (per week the violation remains uncorrected, each week a separate offense)
“no structure of any kind shall be placed, erected, altered, changed, or located on any land within the jurisdiction of shelby county, illinois, including any unincorporated villages, without an improvement location permit (building permit).”
Land inside Holland township, Shelby County, IL that is outside incorporated municipalities. No Holland township zoning ordinance was found; the Shelby County zoning ordinance is the zoning rule applied there.
“the zoning office is responsible for the issuance of building permits and enforcement of ordinance in any unincorporated areas of shelby county”
County zoning districts applying to unincorporated land inside Holland township
“zoning map (pdf, 249 kb) opens in new tab”
Minimum yard setbacks for land in unincorporated Holland township, by county zoning district (ag residential, rural residential, general business, and two further district columns). The column-to-district mapping is not readable in the text extract.
minimum front yard, major street (four district columns): 40 40 40 40 (column-to-district mapping unverified) · minimum side yard (four district columns): 15 6 20 5 (column-to-district mapping unverified) · minimum rear yard (four district columns): 20 20 40 20 (column-to-district mapping unverified)
“minimum front yard when the lot abuts: ag residential (yellow) rural residential general business (blue) (purple) major street 40 40 40 40 collector street 30 30 30 30 local street 25 25 25 25 side yard 15 6 20 5 rear yard 20 20 40 20”
Private sewage (septic) permits for buildings on unincorporated land inside Holland township, through the Shelby County Health Department
“once you’ve obtained a sewer permit from the shelby county health department (if applicable), you should apply for a building permit.”
New buildings needing private sewage service on unincorporated land inside Holland township
“once you’ve obtained a sewer permit from the shelby county health department (if applicable), you should apply for a building permit.”
Land divisions and subdivisions (preliminary and final plats) in unincorporated Holland township
preliminary plat application fee base: 500 USD (plus $25 for each lot or parcel)
“application for preliminary plat, plus $25 for each lot or parcel in the proposed addition or subdivision $500”
Building permit process for unincorporated land inside Holland township
typical permit issue time: <= 15 business days (typical, not guaranteed) · time to begin construction before permit expires: 1 year
“typically, a permit is issued within 15 business days. you have 1 year to begin construction before the permit expires.”
We looked and could not find an official answer yet. Silence is not permission; ask Holland Township or Shelby County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Holland Township publishes no rule on the point, not that none exists. Shelby County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Holland Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.