Zoning, building permits and septic rules in Village of Andalusia, Illinois
Village of Andalusia is a village in Rock Island County, Illinois. Village of Andalusia adopts its own zoning, so inside its limits Village of Andalusia’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Rock Island County page.
Answers from the rulebook for Village of Andalusia
Village of Andalusia’s own rules
Building permitRequired
Electrical, mechanical, plumbing and other building work inside Andalusia village; permits are issued by the Rock Island County director of zoning & building under the village building code
Applies to any owner or authorized agent who intends to enlarge, alter, repair, remove, convert, or replace an electrical, mechanical, or plumbing system regulated by codes adopted by the county, or to cause such work to be done.
Owner-occupants of single-family detached dwellings may obtain permits themselves (see owner-builder claim).
“shall first make application to the director of zoning & building and obtain the required permit”
Owner-occupants doing work on their own single-family detached residence and accessory structures inside Andalusia village
Available only to owner occupants of single-family detached dwellings.
Work by anyone else (including contractors, firms and non-occupant owners) requires county registration.
“owner occupants of single-family detached residential dwellings are permitted to obtain permits and perform work to said residence and accessory structures”
Building code adoptedAdopted (with conditions)
Construction inside Andalusia village limits under the village building code (Title 4, Chapter 1)
Adopted editions are 2012; the codes are subject to the Rock Island County, Illinois building code amendments in sections 1-1-3 through 1-1-11 of the village code.
Adopted by reference: international residential code, international building code, international fuel gas code, international existing building code, international mechanical code, NFPA 70 national electrical code, international property maintenance code.
“the village of andalusia has adopted by reference the following codes as its building code”
InspectionsRequired
Buildings or structures being erected or altered inside Andalusia village
Duty of the village building inspector to inspect as frequently as necessary to insure compliance with the village code.
Plumbing and electrical inspections are handled by contracted inspectors (see plumbing claim).
“to inspect all buildings or structures being erected or altered, as frequently as may be necessary to insure compliance with the village code”
One more reviewed finding on this topic
Required — Plumbing inspections inside Andalusia village
“the village of andalusia contracts with a plumbing inspector for all plumbing inspection needs in the village.”
Local zoningPresent (with conditions)
Land inside Andalusia village limits; the village's own Zoning Ordinance (administered through the village Zoning Board of Appeals and zoning enforcement officer)
Only the existence of the village zoning ordinance is confirmed here; the ordinance text (districts, dimensional standards) was not in the cached code PDF and is not recorded in this record.
Zoning amendments and recent proposals were seen only in search snippets and are not relied on.
“in violation of the zoning title (title 10 of this code)”
Building in a floodplainRequired
Development in a special flood hazard area inside Andalusia village, via the village building code's flood-loads amendment
The village amendment points to the Rock Island County code of ordinances section 3-2-38 for development in special flood hazard areas.
Village Title 4 Chapter 6 (flood damage prevention) also exists; its text was not read.
“1612 flood loads, the rock island county code of ordinances section 3-2-38, development in a special flood hazard area shall apply.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Village of Andalusia or Rock Island County directly.
Certificate of occupancy — New homes inside Andalusia village
Zoning districts — Zoning district map and district list inside Andalusia village
Minimum dwelling size — Single-family dwelling minimum size, main residential district inside Andalusia village
Minimum lot size — Minimum lot size, main single-family residential district inside Andalusia village
Setbacks — Yard setbacks, main single-family residential district inside Andalusia village
19 more unanswered
Lot coverage
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Subdividing land
Driveway access
Short-term rentals
Permit fees
Permit process
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Andalusia publishes no rule on the point, not that none exists. Rock Island County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Andalusia means bringing your own water and power. The kit we’d start with: