Pike County, Illinois
New Salem Township is a township in Pike County, Illinois. Septic permits inside New Salem Township come from Pike County (Pike County Health Department, Environmental Health · (217) 285-4407). 6 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Pike County page.
New Salem Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction in unincorporated Pike County land, which includes the unincorporated part of New Salem township, where the Pike County Zoning Administration issues building permits. Not verified that New Salem township itself has no zoning of its own.
penalty for beginning construction without a building permit: 2 multiple of regular fee (penalty applies if construction begins without a building permit)
“fee for beginning construction without a building permit is two (2) times the regular fee.”
Private sewage disposal systems on Pike County land, administered by the Pike County Health Department; the page does not name townships, so inclusion of New Salem township is inferred from the county-wide program, not separately quoted.
“issue permits and inspect the installation of private sewage disposal systems”
Private sewage disposal system installations on Pike County land, including land in New Salem township (county-wide program; township not named on the page).
“issue permits and inspect the installation of private sewage disposal systems”
Installation of private sewage disposal systems on Pike County land, including land in New Salem township (county-wide program; township not named on the page).
“issue permits and inspect the installation of private sewage disposal systems”
Pike County zoning permit fees for buildings and structures in unincorporated Pike County, including the unincorporated part of New Salem township. Applicability inside New Salem township not separately verified.
permit fee per $1000 of valuation (valuations up to $500,000.00): 2.5 USD (subject to a minimum fee of $50.00) · minimum permit fee: 50 USD (applies to permit fees for all other excluding the above categories)
“permit fees for all other excluding the above minimum fee $50.00 up to $500,000.00 $2.50 per $1000”
Building permit process administered by the Pike County Zoning Administration for unincorporated Pike County land, including the unincorporated part of New Salem township.
“below is the link for pike county building permit”
We looked and could not find an official answer yet. Silence is not permission; ask New Salem Township or Pike County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that New Salem Township publishes no rule on the point, not that none exists. Pike County’s page lists the county offices to call.
Off-grid gear
Going off-grid in New Salem Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.