Piatt County, Illinois
Village of Hammond is a village in Piatt County, Illinois. Village of Hammond adopts its own zoning, so inside its limits Village of Hammond’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Piatt County page.
Construction, alteration, repair, removal or demolition of buildings inside Hammond village limits, filed with the village building inspector.
building permit fee: 100 USD (Permit exemptions listed in the same subsection)
“it shall not be lawful to construct, alter, repair, remove, demolish, or to commence the construction, alteration, removal, or demolition of a building or structure, without first filing with the building inspector an application in writing and obtaining a formal permit.”
Land inside the corporate limits of Hammond village, Piatt County, Illinois (not the unincorporated county area).
“an ordinance authorizing zoning, within the corporate limits of the village of hammond”
Zoning districts of Hammond village (a agricultural, b, r residential)
“a. district regulations: in the following established districts, a building or premise shall be used only for the following purposes: page 9 of 33 ordinance #2024-04 april 17, 2024 1. a: agricultural district permissive uses:”
Single-family dwellings inside Hammond village limits
minimum floor area, single-family dwelling: >= 900 sq ft
“dwelling, single-family-a building designed for or occupied exclusively for one family, having at least 900 square feet in floor space, which is connected permanently to sewer, water, and electrical hookups.”
“dwelling, two-family-a building designed for or occupied exclusively by two families, having at least 1,000 square feet in floor space.”
Occupying a travel trailer, camper or motor home (RV-type unit) for residential or other purposes on land inside Hammond village limits
maximum consecutive days per temporary use: <= 3 days (Temporary, infrequent use only) · maximum occasions per calendar year: <= 3 occasions (Temporary, infrequent use only)
“except that such units may be occupied on a temporary, infrequent basis by the owners of such units, or by guests visiting residents of the village of hammond. as used in this paragraph, a temporary, infrequent use of such a unit shall mean its use for not more than three consecutive days on not more than three occasions during a calendar year.”
Temporary camping with a travel trailer, camper or motor home on land inside Hammond village limits
maximum consecutive days per temporary use: <= 3 days (Owners or guests of residents only)
“as used in this paragraph, a temporary, infrequent use of such a unit shall mean its use for not more than three consecutive days on not more than three occasions during a calendar year.”
Modular homes (prefabricated homes) inside Hammond village limits
“all modular homes shall conform with the applicable yard size, height, and density requirements and all other requirements to which other single-family dwellings must conform of the district in which modular homes are permitted.”
“it shall be unlawful for any person to occupy for residential or other purposes any mobile home in the village of hammond, which mobile home is not located within a mobile home park licensed, developed, maintained, and operated in accordance with state law and the ordinances of the village.”
Agricultural use inside the village's a (agricultural) district, for building-permit purposes
“a permit is not required for: 1. routine maintenance or repair of building structures or equipment; 2. alterations of existing buildings costing less than $300; 3. construction of a service connection to a municipality owned and operated utility; 4. any agricultural use in the a district;”
Land divisions and large-scale residential developments inside Hammond village limits
“the final development plan shall follow all applicable procedures, standards, and requirements of the ordinance governing the subdivision of land.”
Building, pool and demolition permits in Hammond village
building permit fee: 100 USD · pool permit fee: 10 USD · demolition permit fee: 25 USD
“until all applicable fees, charges, and expenses have been paid in full, no action shall be taken on any application or appeal.”
Building permit applications in Hammond village
“until all applicable fees, charges, and expenses have been paid in full, no action shall be taken on any application or appeal.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Hammond or Piatt County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Hammond publishes no rule on the point, not that none exists. Piatt County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Hammond means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.