Village of Peoria Heights, Illinois handles residential and commercial construction applications through the village, and a site plan must accompany the application.1 The village has adopted building codes and zoning districts; Peoria County’s unincorporated-land rules are not the village’s zoning rules.23 For a property needing septic, start with Peoria City/County Health Department Environmental Health and confirm coverage of the village address before designing the system.4

At a glance

Building application
Village construction application; site plan required1
Building codes
Adopted residential, building, electrical, mechanical, energy and plumbing codes2
Zoning
Village residential, business, conservation and industrial districts3
Permit fees
Paid before issuance; doubled for starting without a permit unless arranged beforehand5
Septic contact
Ask Peoria City/County Health Department Environmental Health to confirm village-address jurisdiction4
Owner plumbing
Conditional Illinois owner-occupant exemption; local plumbing permits can still apply67

Who to call

Building permits

Peoria Heights Village Hall, Administration and Zoning Office

Village building and electrical applications, zoning questions and construction inspection coordination

(309) 686-2385

4901 N Prospect Rd Peoria Heights, IL 61616

Septic permits

Peoria City/County Health Department, Environmental Health Division

Onsite wastewater plan review, septic permits and installation or repair inspections; confirm service for the village parcel

309-679-6161

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Village of Peoria Heights means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Village of Peoria Heights, IL?

Peoria Heights publishes a Building/Demolition Permit Application for residential and commercial construction and requires an attached site plan.1 We could not confirm a complete village list of work requiring a building permit or qualifying for an exemption; take the project description to village Administration before scheduling construction.8

The village has adopted the 2018 International Residential Code and International Building Code, alongside electrical, mechanical, property-maintenance, energy and plumbing codes.2 Peoria Heights requires fees before permit issuance and doubles fees when work starts without a permit unless prior arrangements were made with the village inspections department.5 Ask for the project’s current fee calculation before work begins.1

Who handles building applications in Village of Peoria Heights?

Peoria Heights Administration lists building and electrical permits and a Zoning Office among its responsibilities.8 Start at Village Hall for the application and zoning contact; the village’s construction application directs building-regulation questions to Code Enforcement.1

The village application page says all village applications and permits are available at Village Hall.1 Bring a site plan with the residential or commercial construction application.1 Ask village Administration which plan reviews and inspections apply to the proposed work; the department describes reviewing construction plans and inspecting construction, alterations and repairs for code compliance.8

Does Village of Peoria Heights have zoning, lot-size and setback rules?

Peoria Heights has village zoning regulations, including conservation, residential, business and industrial districts.3 The residential districts include low-density, medium-density, multiple-family and planned residential categories, so a residential label alone does not identify the parcel’s district.3

We could not confirm the village’s operative district schedules for minimum lot size, setbacks, lot coverage, building height or minimum dwelling size; ask the village Zoning Office to identify the parcel’s district and provide the applicable standards before choosing a building footprint.8 Peoria Heights also publishes subdivision regulations, but the available provisions do not establish the approval thresholds or procedure; ask the village about a proposed lot split before relying on it.9

How do septic permits work inside Village of Peoria Heights?

Illinois requires private sewage disposal plan approval from IDPH or the applicable local authority before construction, with notice at least 48 hours before installation, repair or modification begins.10 Peoria City/County Health Department Environmental Health reviews onsite wastewater plans, issues septic permits and inspects installation or repair.4

We could not confirm an express Peoria Heights jurisdiction statement, so ask Environmental Health to confirm the village address and whether the proposed system falls under its program.4 The department says anyone constructing, altering or extending a private sewage disposal system must have its valid permit.4 Keep that approval separate from the village construction application, which concerns residential and commercial construction.1

Can you live in an RV or tiny home in Village of Peoria Heights?

We could not confirm Peoria Heights rules allowing residential RV occupancy, temporary camping, tiny homes, manufactured homes or accessory dwellings on a private lot; ask the village Zoning Office about the specific use before buying a unit or arranging delivery.8 The village’s residential zoning districts and adopted construction codes are separate considerations for a proposed dwelling.32

An off-grid toilet does not resolve all wastewater obligations: Illinois allows specified alternative human-waste systems under conditions, but other domestic wastewater must go to a conventional private sewage disposal system.11 Ask Environmental Health about the proposed sanitation design and village Administration about dwelling approval and utility-connection requirements.48

Building a home in Village of Peoria Heights: what should you check first?

Begin with the village Zoning Office: identify the district and ask whether the intended dwelling and site layout can be approved.8 Next, prepare the village construction application with its required site plan and ask Code Enforcement about project-specific requirements.1 If the parcel needs onsite wastewater, confirm the responsible health authority and obtain plan approval before septic construction.10

Before taking on plumbing yourself, distinguish a trade-license exemption from a building-permit exemption: Illinois allows qualifying owner-occupants to perform specified plumbing work under conditions, while local plumbing permits and inspections can still apply.67 For land outside village limits, use the Peoria County guide for the county’s unincorporated-area building-permit answer.12

Watch-outs

  • Peoria Heights doubles permit fees for starting work without a permit unless prior arrangements were made with the village inspections department.5
  • We could not confirm village certificate-of-occupancy requirements, water or sewer connection mandates, or floodplain and driveway approval procedures; ask village Administration before finalizing the purchase or construction plan.8

Sources

  1. Applications/Permits (Village of Peoria Heights), quoted and re-checked
  2. 9-2-1-1: CODES ADOPTED (Village of Peoria Heights), quoted and re-checked
  3. TITLE 10 ZONING REGULATIONS (Village of Peoria Heights), quoted and re-checked
  4. Peoria City/County Health Department, Environmental Health Division (pcchd.org)
  5. 9-2-2: PERMIT FEES (Village of Peoria Heights), quoted and re-checked
  6. HB5913 Enrolled — Illinois Plumbing License Law amendment (Illinois statewide rule), quoted and re-checked
  7. 225 ILCS 320/18 — Local regulation; Department standards (Illinois statewide rule), quoted and re-checked
  8. Peoria Heights Village Hall, Administration and Zoning Office (peoriaheights.org)
  9. TITLE 11 SUBDIVISION REGULATIONS (Village of Peoria Heights), quoted and re-checked
  10. 77 Ill. Adm. Code 905.190 Installation Approval (Illinois statewide rule), quoted and re-checked
  11. 77 Ill. Adm. Code 905.130 Human Waste Disposal (Illinois statewide rule), quoted and re-checked
  12. Residential Permits (2026 county census)

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Village of Peoria Heights

Village of Peoria Heights’s own rules

  • Building code adoptedAdopted

    Construction, alteration, repair, and occupancy-related regulation inside Peoria Heights village.

    • The adopted codes include the 2018 International Residential Code, 2018 International Building Code, 2018 International Mechanical Code, 2018 International Property Maintenance Code, 2014 NFPA 70 National Electrical Code, Illinois Energy Conservation Code, and Illinois Plumbing Code.
    • The village code states that adopted code documents are on file in the village clerk's office.
    • The code page identifies Ordinance 2019-1605 dated 9-17-2019 among the amendments.

    international residential code edition: 2018 · international building code edition: 2018 · national electrical code edition: 2014

    “the international residential code, 2018 edition, including appendix A through and including appendix T, is hereby adopted as the residential code”
  • Zoning districtsPublished

    Zoning districts inside Peoria Heights village.

    • The code lists the C Conservation, R-1, R-2, R-3, R-P, B-1, B-2, B-3, B-4, and I-1 districts, plus overlay and other specialized chapters.
    • A parcel-specific zoning-map determination was not made.
    “R-1 Low Density Residential District 7A R-2 Medium Density Residential District 7B R-3 Multiple-Family Residential District 7C R-P Planned Residential District 7D”
  • Subdividing landRegulated (with conditions)

    Subdivision activity inside Peoria Heights village.

    • Title 11 distinguishes Village Regulations from the County Subdivision Code; the operative approval thresholds and procedures were not retrieved.
    “TITLE 11 SUBDIVISION REGULATIONS Village Regulations 1 County Subdivision Code 2”
  • Permit feesPublished

    Building, demolition, electrical, inspection, and certificate-of-occupancy fees inside Peoria Heights village.

    • All fees are to be paid before a permit is issued.
    • Fees are doubled if work is started without a permit unless prior arrangements have been made with the village inspections department.
    • The code identifies the building-fee schedule as Ordinance 2005-1249 dated 11-15-2005, with later 2016 Code amendments for some electrical fees.

    certificate of occupancy fee: 6 USD · sign permit fee: 31 USD · fence permit fee: 25 USD · demolition permit fee: 25 USD

    “Sign permits | $31.00 Fence permits | 25.00 Demolition permits | 25.00 Certificate of occupancy | 6.00”
  • Permit processPartial

    Residential and commercial construction permit applications inside Peoria Heights village.

    • The official page says a site plan must be attached.
    • The page directs applicants to ordinances or Code Enforcement for more information.
    • The page states that all village applications and permits are available at Village Hall and advises contacting Administration for more information.
    “Application for residential and commercial construction. Permit fees are based on the schedule found in Ordinance 2005-1429. Please see Ordinances for more information on fees and building regulations or contact Code Enforcement. Site plan must be attached.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Peoria Heights or Peoria County directly.

  • Building permit — Residential and commercial construction inside Peoria Heights village.
  • Owner-builder exemption — Owner-builders performing construction inside Peoria Heights village.
  • Certificate of occupancy — Buildings and changes of occupancy inside Peoria Heights village.
  • Minimum dwelling size — Residential dwellings inside Peoria Heights village.
  • Minimum lot size — Residential lots inside Peoria Heights village.
18 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Peoria Heights publishes no rule on the point, not that none exists. Peoria County’s page lists the county offices to call.