Ogle County, Illinois
Buffalo Township is a township in Ogle County, Illinois. Septic permits inside Buffalo Township come from Ogle County (Ogle County Health Department · (815) 562-6976). 8 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Ogle County page.
Buffalo Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction and land/building permits administered by Ogle County for unincorporated land inside Buffalo Township.
“Construction of any building, structure or addition thereto shall not be commenced; preliminary work shall not be done with respect to any other use of land; and no permits pertaining to the use of land or buildings shall be issued, by officer, employee, department, board or bureau of Ogle County, unless a zoning certificate has been obtained from the office of the zoning administrator.”
A single-family dwelling on a lot divided and set aside from a farm in the AG-1 Agricultural District, if that county district applies to unincorporated land in Buffalo Township.
minimum lot area: >= 1 acre (single-family dwelling on lot divided and set aside from a farm in AG-1) · minimum lot width: >= 150 feet (same use and district)
“Single-family dwelling, when constructed on a lot divided and set aside from a "farm" as defined herein. Lot area shall be not less than one acre and the lot width shall be not less than one hundred fifty feet (150'). At least one of the following criteria must be met prior to issuance of a special use permit for a single-family dwelling in an AG-1 agricultural district:”
Private sewage systems serving homes inside Buffalo Township where city sewer is not connected.
“I understand that this signed form must be returned to the Ogle County Health Department as a condition of septic permit issuance.”
Private septic installation, repair, or alteration inside Buffalo Township.
“I understand that this signed form must be returned to the Ogle County Health Department as a condition of septic permit issuance.”
Private septic systems inside Buffalo Township installed, repaired, or altered after January 1, 2014.
initial evaluation: <= 3 years after installation · residential evaluation interval: <= 5 years (After the first evaluation) · nonresidential evaluation interval: <= 3 years (After the first evaluation)
“After the first evaluation, the system shall be evaluated a minimum of once every 5 years if residential and every 3 years if nonresidential.”
New homes inside Buffalo Township subject to Ogle County Health Department guidance.
sanitary sewer availability distance: <= 300 feet (unless a physical barrier or local ordinance prevents connection)
“For building a house, you will need to have a source of water either from a private well or city water source. For wells, if there is reasonable connection to a city water source, it must be connected. Many cities and towns have more stringent requirements for connection, so again, it is important to check with them first.”
Buildings or structures used exclusively for agricultural purposes in an agricultural district on unincorporated land inside Buffalo Township, if county agricultural zoning applies.
“In agricultural districts the only requirement shall be written notification and shall be submitted to the zoning administrator for a building or structure used or to be used exclusively for agricultural purposes as defined herein, and need only show the building setback lines in relation to abutting public streets or highways.”
Floodplain development on unincorporated land inside Buffalo Township.
“Any development located on land that can be shown by survey data to be higher than the current base flood elevation and which has not been filled after the date of the site's first flood insurance rate map is not in the floodplain and therefore not subject to the requirements of this division.”
We looked and could not find an official answer yet. Silence is not permission; ask Buffalo Township or Ogle County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Buffalo Township publishes no rule on the point, not that none exists. Ogle County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Buffalo Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.