Moultrie County, Illinois
Village of Lovington is a village in Moultrie County, Illinois. Village of Lovington adopts its own zoning, so inside its limits Village of Lovington’s rules apply, not the county’s. Septic permits inside Village of Lovington come from the county and state together. 18 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Moultrie County page.
New construction, alteration and remodeling inside Lovington village limits
“it is unlawful to construct any building or structure other than a fence in the village, or to alter or remodel any building or structure so as to change the bearing walls, beams, supports or the roof thereof, without first securing a permit therefor.”
New, altered, extended or changed-use buildings inside Lovington village
“all certificates of occupancy shall be applied for coincident with the application for a building permit.”
All land inside Lovington village limits; the village adopts and administers its own zoning code (Chapter 40)
“the village is divided into five (5) districts, known as: a b c d e residential district residential district commercial business district light industrial district agricultural district which areas and boundaries are designated by the official map.”
Zoning districts inside Lovington village limits
“the village is divided into five (5) districts, known as: a b c d e residential district residential district commercial business district light industrial district agricultural district which areas and boundaries are designated by the official map.”
Main buildings on a lot in the A residential district inside Lovington village
minimum lot area: >= 9000 square feet (smaller lot of record permitted for uses in this district) · minimum average lot width: >= 60 feet
“every lot upon which a building is erected shall have an area of not less than nine thousand (9,000) square feet, and an average width of not less than sixty (60) feet, except that any of the uses permitted in this district may be erected or constructed upon a smaller lot of record.”
Main buildings in the A residential district inside Lovington village: front and side yards
front yard depth: not less than the width of the street as measured from the center (unless 30% or more of frontage has a different built-out depth) · side yard width (each side): >= 10 feet (reduction for lots of record under 50 feet wide in 40-4-4(b), not quoted)
“there shall be a side yard on each side of the building having a width of not less than ten (10) feet”
“accessory building setbacks shall be as specified for front and side yards. required rear yard setbacks shall be two (2) feet from the lot line.”
Buildings in the A residential district inside Lovington village
maximum building height: <= 35 feet · maximum stories: <= 2.5 stories
“no building shall exceed two and onehalf (2 ½) stories, nor shall it exceed thirty-five (35) feet in height.”
Mobile homes on a lot in the B residential district inside Lovington village (use variance route)
accessory storage locker base area: >= 50 square feet
“a permit for a mobile home to be placed upon a lot as a use variance shall be issued by the zoning administrator if the following conditions are met: (a) the mobile home is to have utility connections for electric, and/or gas distribution service where needed and individual connections to the municipal water and sewer system.”
Private sewage disposal systems on lots inside Lovington village
“the type, capacities, location and layout of a private sewage disposal system shall comply with all recommendations of the state of illinois private sewage disposal licensing act and code and with the state of illinois environmental protection agency.”
Construction of a private sewage disposal system on a lot inside Lovington village where no public sewer is available
village permit and inspection fee for private sewage system: 100 USD · minimum lot area for subsurface soil absorption permit: >= 40000 square feet
“before commencement of construction of a private sewage disposal system the owner shall first obtain a written permit from the appropriate health department.”
Private sewage disposal systems installed inside Lovington village
“the inspection shall be made within seventy-two (72) hours of the receipt of written notice by the superintendent.”
Private sewage (privy, septic tank, cesspool) on lots inside Lovington village
“where a public sanitary sewer is not available under the provisions of section 38-4-7, the building sewer shall be connected to a private sewage disposal system complying with the provisions of this division.”
Houses and buildings used for occupancy inside Lovington village that abut a street or right-of-way with a public sanitary (or combined) sewer
distance from nearest property line to public sewer triggering connection: <= 200 feet (connection also requires adequate capacity and a village determination of requirement) · connection deadline after official notice: 90 days
“within ninety (90) days after date of official notice to do so, provided that said public sewer is within two hundred (200) feet of the nearest property line and adequate to handle the additional connection, where determined to be required.”
Subdivision and development of land inside Lovington village limits
“this chapter regulates the subdivision and development of land in order to assist in achieving the following specific objectives”
Development inside a floodplain within Lovington village limits
“no person, firm, corporation, or governmental body not exempted by law shall commence any development in the floodplain without first obtaining a development permit from the zoning administrator.”
Building permit fees inside Lovington village
building permit fee, anticipated cost up to $9,999: 25 USD (plus $0.50 per $500 increment over $10,000 as stated below) · increment over $10,000 of anticipated construction cost: per 0.5 USD per $500 (base $25 fee for amounts over $10,000 as stated in 40-11-3)
“a fee of twenty-five dollars ($25.00) shall be charged for up to nine thousand nine hundred ninety-nine dollars ($9,999.00)”
Building permit applications inside Lovington village
“application for building permits shall be made to the zoning administrator, and shall have attached thereto two (2) copies of a layout or plot plan”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Lovington or Moultrie County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Lovington publishes no rule on the point, not that none exists. Moultrie County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Lovington means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.