Bolthole Index

Montgomery County, Illinois

Zoning, building permits and septic rules in Raymond Township, Illinois

Raymond Township is a township in Montgomery County, Illinois. Septic permits inside Raymond Township come from the county and state together. 6 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Montgomery County page.

Answers from the rulebook for Raymond Township

Rules another office applies inside Raymond Township

Raymond Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicMixed (with conditions)

    Private sewage disposal systems on land inside Raymond township, Montgomery County, IL. The county health department administers the program countywide, under a state program and a county ordinance; this applies inside Raymond township.

    • The county health department's program covers residents of Montgomery County generally; no municipal septic program inside the township was checked, so a village or city within the township may differ.
    • Systems must also conform to the Illinois private sewage disposal licensing act and code, per the county application form.
    “The Department administers and enforces the Private Sewage Disposal Program”
  • Septic permitRequired

    New and renovated private sewage disposal systems on land inside Raymond township, Montgomery County, IL (county-wide health department program that applies inside the township)

    • Permit is issued to the owner and a licensed septic installer before construction begins.
    • Permit is issued by the Montgomery County Health Department (11191 Il. Rte. 185, Hillsboro, IL 62049; 217-532-2001).
    • The 2016 application form states the permit expires one year from date of issue; the current form was not checked.
    • Whether any incorporated municipality inside the township runs its own septic permit was not checked.

    permit validity: 1 year from date of issue (per the 2016 application form)

    “all new and renovated private sewage disposal systems require a permit to be issued to the owner and licensed septic installer prior to construction.”
  • Septic inspectionRequired

    New and renovated private sewage disposal systems on land inside Raymond township, Montgomery County, IL (county-wide health department program that applies inside the township)

    • Installer or owner must request inspection by calling the county health department two working days before installation begins.
    • Inspection and final approval must be obtained on all portions of the system before any portion is covered.
    • The department evaluates, approves and inspects the systems.
    “prior to covering any portion of the system.”
  • Well permitRequired

    Drilling of new private water wells on land inside Raymond township, Montgomery County, IL (county-wide health department program that applies inside the township)

    • Permit is required for drilling new water wells and for sealing abandoned wells; the department visits sites for inspection.
    “the department requires and issues a permit for the drilling of new water wells and the sealing of abandoned wells and shall visit such sites for inspection.”
  • Permit feesPublished (with conditions)

    Private sewage disposal permit application fee for land inside Raymond township (county health department)

    • Fee stated on the 2016 application form; the current fee schedule was not checked.
    • No township or building-permit fee schedule was found.

    septic sewage permit application fee: 50 USD (2016 form; confirm current fee)

    “permit # $50 application fee date of issue date of pre-eval”
  • Permit processPartial

    Septic (private sewage disposal) permit process only, for land inside Raymond township; no building-permit process was found

    • Owner and licensed installer apply for the permit before construction; health department evaluates and approves the system.
    • Inspection and final approval are required before covering any part of the system.
    “all new and renovated private sewage disposal systems require a permit to be issued to the owner and licensed septic installer prior to construction.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Raymond Township or Montgomery County directly.

  • Building permit — Building permits for new residential construction inside Raymond township
  • Owner-builder exemption — Owner-builder exemption from permits or licensing inside Raymond township
  • Building code adopted — Building code adopted for new construction inside Raymond township
  • Inspections — Building inspections for construction inside Raymond township
  • Certificate of occupancy — Certificate of occupancy for new dwellings inside Raymond township
18 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Raymond Township publishes no rule on the point, not that none exists. Montgomery County’s page lists the county offices to call.

← All of Montgomery County: county rules, score and offices