Bolthole Index

Montgomery County, Illinois

Zoning, building permits and septic rules in Village of Fillmore, Illinois

Village of Fillmore is a village in Montgomery County, Illinois. 3 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Montgomery County page.

Answers from the rulebook for Village of Fillmore

Rules another office applies inside Village of Fillmore

Village of Fillmore does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Septic inspectionRequired

    Onsite sewage disposal system installations serving property inside Fillmore village (Montgomery County Health Department jurisdiction).

    • Owner must request the inspection at least two working days before installation begins (call 217-532-2001).
    • Final approval must occur before any portion of the system is covered.
    • Quoted text is from the county health department's 2016 application form; not yet checked against the current ordinance.

    inspection notice: >= 2 working days (before beginning of installation)

    “to request an inspection call 217-532-2001 two working days prior to beginning of installation.”
  • Permit feesPublished (with conditions)

    Sewage disposal (septic) permit fee from the Montgomery County Health Department, applicable to land inside Fillmore village.

    • Fee shown on a 2016 county form; current fee schedule not verified.
    • Fee applies to the sewage permit only; building, zoning, and other village fees are not covered.

    sewage permit application fee: 50 USD (2016 form; current amount not verified)

    “montgomery county health department permit # $50 application fee date of issue date of pre-eval”
  • Permit processPartial

    Sewage disposal permit process through the Montgomery County Health Department for property inside Fillmore village. Building permit and village zoning steps are not covered.

    • Permit expires one year from date of issue.
    • Process steps shown on 2016 form: application with pre-evaluation, permit issuance, installer licensing, inspection request, final inspection and approval. Current procedure not verified.

    permit validity: 1 year (from date of issue)

    “permit expires one year from date of issue.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Fillmore or Montgomery County directly.

  • Building permit — Whether a building permit is required for new construction inside Fillmore village limits
  • Owner-builder exemption — Whether owner-builders may build a home inside Fillmore village without a licensed contractor
  • Building code adopted — Whether Fillmore village has adopted a building code applying inside village limits
  • Inspections — Whether building inspections are required for construction inside Fillmore village limits
  • Certificate of occupancy — Whether a certificate of occupancy is required for new dwellings inside Fillmore village
21 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic permit
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Fillmore publishes no rule on the point, not that none exists. Montgomery County’s page lists the county offices to call.

← All of Montgomery County: county rules, score and offices