Monroe County, Illinois
Village of Valmeyer is a village in Monroe County, Illinois. Village of Valmeyer adopts its own zoning, so inside its limits Village of Valmeyer’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Monroe County page.
Erecting, constructing, altering or repairing any structure or building inside Valmeyer village limits
building permit fee: 0.3 USD per square foot (subject to minimum fees; residential home with basement minimum 200.00 USD; residential home with crawl space minimum 150.00 USD; commercial and industrial rates are set by a separate schedule)
“no person shall erect, construct, alter, or repair any structure or building within the village limits of valmeyer, illinois, without having first obtained a permit from the village code official.”
Electrical work only, for an owner-occupied single-family home or owner-occupied duplex inside Valmeyer village
“the village clerk shall issue work permits to licensed electrical contractors or a homeowner, provided the homeowner personally performs the electrical work and provided the electrical work is to be installed in the home occupied by the owner and that the home is a single-family residence or owner-occupied duplex.”
Structures inside Valmeyer village limits
“being marked and designated as the international building code, 2006 edition, including all appendix chapters, as published by the international code council, is hereby adopted as the building code of the village of valmeyer”
New construction inside Valmeyer village limits
building inspection fee, new residential home: 650 USD (in addition to the building permit fee)
“all structures must comply with the village of valmeyer's codes. inspections will be conducted by the building inspector, plumbing inspector and electrical inspector contracted by the village.”
Residential or rental property inside Valmeyer village after a change of occupants
“6-5-6 - occupancy permit required. hereinafter, upon change of occupants after the issuance of an initial occupancy permit, no residential or rental property shall be occupied or used until a new occupancy permit shall have been issued by the code official stating that the premises comply with the provisions of this code.”
Land inside Valmeyer village limits. The village's own Chapter 40 zoning code applies; county zoning does not govern land inside village limits.
“this sections shall not apply in areas of the village that are zoned agricultural in nature”
A dwelling inside a subdivision within Valmeyer village
“if dwelling is to be in a subdivision, written approval must be obtained from the developer or home owner's association for plan and site location.”
Building, electrical and inspection permit fees for work inside Valmeyer village
building permit fee: 0.3 USD per square foot (subject to minimum fees in Schedule A; may be superseded by Ordinance 25-02 (2025))
“the application for building permit shall include a permit fee of thirty cents ($0.30) per square foot of structure to be constructed, including without limitation the area of any garage”
New construction permit process inside Valmeyer village
“complete the building permit application and submit to the zoning administrator along with a copy of the recorded deed to the property.”
Village of Valmeyer does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New onsite sewage disposal system on land inside Valmeyer village where city services are not available
“contact bi-county health department (618-939-3871) to apply for permit to install a sewage disposal system. the health department is located at 901 illinois ave., waterloo, il 62298. (only if city services are not available).”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Valmeyer or Monroe County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Valmeyer publishes no rule on the point, not that none exists. Monroe County’s page lists the county offices to call.