Aledo, Illinois requires a city building permit for a new home, with construction drawings and a registered-surveyor plat of survey.1 Aledo enforces its own zoning ordinance; Mercer County Health Department handles private wastewater approvals, while the city controls required public sewer connections.234 For an Aledo lot, settle the sewer connection question before budgeting for septic.4
At a glance
- Building permits
- City building permit required for new homes and listed construction1
- Zoning
- City zoning ordinance enforced by Aledo Code Administration2
- Septic approval
- Mercer County Health Department; confirm city sewer requirements first34
- Sewer connection
- Required on qualifying occupied properties when city sewer is within 200 feet of the property line, within 60 days after official notice4
- Owner-builder
- Contractor-license exception for qualifying owner occupants doing their own work; building permits still apply5
- Driveway
- City driveway permit and City form required; survey if field inspection determines necessary6
- Private wells
- Illinois requires a permit before construction, modification or sealing; ask the health department which office processes the application78
Who to call
Building permits
City building-permit, plan-review, inspection and zoning questions
120 N College Avenue Aledo IL 61231
Septic permits
Mercer County Health Department
County onsite wastewater construction and repair applications; ask about private-well routing
305 NW 7th Street Aledo, Illinois 61231
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Aledo means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Aledo, IL?
Yes: new homes inside Aledo city limits need an all-inclusive city building permit, construction drawings and a registered-surveyor plat of survey.1 Aledo uses the 2021 International Residential Code, as locally amended, for single-family and two-family dwellings, including construction, alterations, additions and rehabilitation.9
Aledo’s permit schedule also covers residential garages, fences, decks, permanent or fixed accessory structures, demolition, sewers and driveways.1 Building-permit fees depend on construction cost; the city lists a $25 plan-review fee plus review cost and a $50 fee per after-hours inspection.10 Ask Code Administration for the city fee calculation for your project.2
Who issues building permits and answers zoning questions in Aledo?
Start with Aledo Code Administration for a project inside city limits; call 309-582-7241, ext. 205 to arrange an inspector appointment.2 The city office is at 120 N College Avenue Aledo IL 61231.2 Bring the proposed project description, and ask the city official to identify the applicable building-permit submission and zoning requirements.112
For land outside Aledo city limits, use the Mercer County guide: the county zoning ordinance applies to land outside incorporated municipalities.12 Private wastewater approval remains a Mercer County Health Department responsibility; Aledo’s public sewer connection requirements are a separate city decision.34
Does Aledo have zoning, and can you live in an RV or tiny home?
Aledo enforces a city zoning ordinance through its Code Administration office.2 We could not confirm Aledo’s rules for living in an RV, temporary camping, tiny-home occupancy, accessory dwellings or manufactured-home placement; ask the Building and Zoning Official about your proposed use before buying a lot.2
We also could not confirm Aledo’s applicable minimum lot size, minimum dwelling size, setbacks, lot coverage or height schedule; request the parcel’s zoning district and the dimensions the city will require.2 A new dwelling still falls under Aledo’s building-permit and residential-code requirements, so do not assume a small home avoids the city application process.19
How do sewer connections and septic permits work inside Aledo?
Aledo requires qualifying occupied properties abutting a street, alley or right-of-way with city sewer to connect at the owner’s expense when the sewer is within 200 feet of the property line, within 60 days after official notice.4 Ask the city whether that connection requirement applies to your lot before pursuing private sewage disposal.42
Mercer County Health Department requires a permit for constructing or repairing an onsite wastewater system, with a soils evaluation and at least 3 borings by a certified soil classifier.13 Submit the application, soil report and fee to the health department; the listed fees are $200 for contractors and $600 for homeowner installation.13 Aledo separately lists a $25 private sewer permit and inspection fee; ask both offices how the city and county approvals fit your address.108
What are the steps for building a home in Aledo?
- Ask Aledo Code Administration to confirm the parcel’s city zoning requirements and the proposed residential use.2
- Resolve city sewer connection requirements; if private wastewater is applicable, obtain the health department’s soils evaluation and septic approval before system construction.41314
- Prepare construction drawings and a registered-surveyor plat for the all-inclusive new-home building permit; drawings need not be sealed unless significant structural issues are evident.11
- Obtain the city driveway permit using the City form, with a survey if field inspection determines one is necessary.6
- Arrange inspections with Code Administration and ask the city official which completion approvals apply to the home.2
Aledo’s contractor-license exception covers qualifying owners occupying their own single-family or two-family dwelling and doing their own work, with liability retained by the owner; required building permits and state roofing and plumbing licensing rules still apply.5
What should you check before buying a lot in Aledo?
For a proposed private well in Aledo, Illinois requires a permit before constructing a new well, modifying an existing well or sealing an abandoned well, from IDPH or an approved local health department.7 We could not confirm which office processes private-well applications inside Aledo; ask Mercer County Health Department to identify the responsible office.8
We could not confirm Aledo’s local floodplain-development procedure; ask Code Administration about the parcel before planning grading or construction.2 Illinois separately requires approval for construction in regulated floodways, subject to the state program’s scope and exceptions.15 For access involving work in a state-maintained road right-of-way, obtain the IDOT highway permit before work begins, in addition to addressing Aledo’s city driveway permit.166
Watch-outs
- Aledo’s owner-occupant contractor-license exception does not remove required city building permits or applicable state roofing and plumbing licensing rules.5
- Aledo’s published certificate-of-occupancy provision covers new business occupancies and changes in use groups, excludes home occupations, and should not be read as confirmation of the final approval procedure for a new home; ask Code Administration.172
- An Illinois-approved compost toilet does not eliminate wastewater disposal obligations: other domestic wastes must go to a conventional private sewage disposal system, and Aledo’s applicable sewer connection requirement still needs to be addressed.184
Sources
- Aledo City Code § 4-1-3, Permit, Plan and Survey Requirements (Aledo), quoted and re-checked
- Aledo Code Administration (aledoil.gov)
- Programs | Mercer County Health, quoted and re-checked
- Aledo City Code § 7-1-11, Use of Public Sewers Required (Aledo), quoted and re-checked
- Aledo City Code § 4-1-7, Contractor Licensing (Aledo), quoted and re-checked
- Aledo City Code § 4-1-3, Permit, Plan and Survey Requirements (Aledo), quoted and re-checked
- 77 Ill. Admin. Code 920.130, Water Well Permit Requirements (Illinois statewide rule), quoted and re-checked
- Mercer County Health Department (mchdil.com)
- Aledo City Code § 4-1-1, Adoption (Aledo), quoted and re-checked
- Aledo City Code § 13-1-1, Schedule of Fees (Aledo), quoted and re-checked
- Aledo City Code § 4-1-3, Permit, Plan and Survey Requirements (Aledo), quoted and re-checked
- ZONING RESOLUTION, quoted and re-checked
- Onsite Wastewater Disposal Permit Application Instructions, quoted and re-checked
- 77 Ill. Adm. Code 905.190 Installation Approval (Illinois statewide rule), quoted and re-checked
- Permit Program (Illinois statewide rule), quoted and re-checked
- Highway Permits (Illinois statewide rule), quoted and re-checked
- Aledo City Code § 4-1-10, New Occupancy Requirements (Aledo), quoted and re-checked
- 77 Ill. Adm. Code 905.130 Human Waste Disposal (Illinois statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.