Village of Greenview, Illinois requires building permits for new construction, new garages, new fencing, additions and decks; contact the Village Clerk for building permits and costs.1 Greenview requires public sewer and water connections when available, subject to the ordinance’s exceptions for districts allowing private systems.2 In Menard County, Sangamon County Department of Public Health provides private sewage disposal and potable-water services.3
At a glance
- Building permits
- Required for new construction, garages, fences, additions and decks; contact the Village Clerk.1
- Zoning and setbacks
- We could not confirm district rules or setbacks; ask Village Hall for the parcel’s applicable ordinance.4
- Sewer and water
- Public connections required when available, with ordinance exceptions for districts allowing private systems.2
- Septic approval
- State plan approval before new-system construction; county health program is the local contact.53
- Private wells
- New wells require permits; Greenview allows private wells when public water cannot be made available and applicable codes are met.6
- Subdivision costs
- Developer or subdivider pays 1.5% of approved estimated public-improvement construction cost before final plat recording.7
Who to call
Building permits
Village of Greenview Building Permits / Village Clerk
Building permit applications and costs; referral for building-code questions.
106 E Washington St. Greenview, IL 62642
Planning & zoning
Village of Greenview Village Hall / Village Clerk
Clarification on Greenview ordinances, water-service signup and viewing the proposed sewer map.
106 E. Washington St. Greenview, IL 62642
Septic permits
Menard County Health Department
Local contact for private sewage disposal and potable-water services
One Centre Drive, Petersburg, Illinois 62675
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Village of Greenview means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of Greenview, IL?
Greenview requires building permits for new construction, new garages, new fencing, additions to existing structures and decks.1 Greenview’s fencing permit has no cost; ask the Village Clerk for the building permit cost for the proposed project.1 For construction within an approved subdivision, Greenview also conditions building and occupancy permit issuance on subdivision compliance and the required improvement surety or qualifying deposit.8 A permit application therefore needs to address the subdivision’s unfinished public improvements as well as the proposed building when those conditions apply.8
Who issues building permits in Village of Greenview?
Start a Greenview building permit application with the Village Clerk at (217) 968-5314 or [email protected].1 Greenview’s published application instructions say to read the required information, print and complete the building permit application, and return the form to City Hall.1 Village Hall also provides clarification on Greenview ordinances, making the clerk the starting contact for questions about the parcel’s requirements.4 Illinois leaves privately funded construction permit, inspection and occupancy administration to the applicable local government; the state’s administration policy does not waive Greenview’s building permits.9
Does Village of Greenview have zoning for RVs and tiny homes?
We could not confirm Greenview’s zoning districts, residential setbacks, minimum dwelling size or rules for living in an RV or tiny home; ask Village Hall for the ordinances applicable to the specific parcel and proposed use.4 Greenview regulates subdivision plats, including Board of Trustees approval before recording, so dividing land or proposing additional principal buildings needs subdivision review.10 Greenview’s utility ordinance also refers to zoning districts that specifically allow private septic systems or private wells as exceptions to public connection requirements.2 Those utility exceptions alone do not establish permission to occupy an RV or tiny home; request a separate answer from Village Hall before committing to that living arrangement.4
How do septic permits and wells work inside Village of Greenview?
Greenview allows private septic systems when public sewer is not readily available and applicable County Health Officer, Illinois EPA and other governmental requirements are met.2 Illinois requires plan approval before construction of a new private sewage disposal system and notice to the state or local authority at least 48 hours before work begins.5 Contact the Menard County Health Department local office at (217)535-3102 for the private sewage disposal program provided by Sangamon County Department of Public Health.3 Greenview allows private wells when public water cannot be made available and applicable codes are met; new well construction requires a permit.6 Public utility availability therefore comes before choosing a private well or septic design.2
Building a home in Village of Greenview: what comes first?
Begin with the Village Clerk: request the building permit application, project cost and clarification of the ordinances affecting the parcel.14 Next, establish whether public sewer and water are available, because Greenview’s connection requirements can determine whether private systems are an option.2 For a private sewage system, arrange plan approval before construction; for a new well, obtain the required construction permit.56 If subdividing land, obtain the required village plat approval before recording and resolve the improvement-surety conditions governing building and occupancy permits.11 The developer or subdivider must pay 1.5% of the Village Engineer-approved estimated public-improvement construction cost before final plat recording.7
What should you check before buying in Village of Greenview?
Ask Village Hall to clarify the applicable ordinances and let you view the proposed sewer map before relying on private sewer or water arrangements.4 Greenview’s requirement to connect to available public systems means an off-grid plan needs to fit the village’s utility rules.2 Illinois allows specified human-waste options, including compost toilets, but other domestic wastes still require conventional private sewage disposal; that statewide allowance does not remove Greenview’s public connection requirements.122 For land outside village limits, use the Menard County guide for the county-administered building permit answer rather than applying Greenview’s application process.13
Watch-outs
- Greenview’s subdivision building and occupancy permit conditions include financial surety for unfinished improvements; do not treat plat approval alone as clearance to build or occupy.814
- We could not confirm Greenview’s RV occupancy, tiny-home occupancy or floodplain development requirements; ask Village Hall for the applicable ordinance before buying for those uses.4
Sources
- Village of Greenview Building Permits / Village Clerk (thevillageofgreenview.com)
- codelibrary.amlegal.com (Village of Greenview), quoted and re-checked
- Menard County Health Department (menardcountyil.gov)
- Village of Greenview Village Hall / Village Clerk (thevillageofgreenview.com)
- 77 Ill. Adm. Code 905.190 Installation Approval (Illinois statewide rule), quoted and re-checked
- Private Water & Closed Loop Wells (Village of Greenview), quoted and re-checked
- § 150.09 Costs for Plat Review and Subdivision Inspection (Village of Greenview), quoted and re-checked
- § 150.08 Building and Occupancy Permits; Issuance (Village of Greenview), quoted and re-checked
- Illinois Codes FAQ (Illinois statewide rule), quoted and re-checked
- codelibrary.amlegal.com (Village of Greenview), quoted and re-checked
- § 150.03 Applicability and Compliance (Village of Greenview), quoted and re-checked
- 77 Ill. Adm. Code 905.130 Human Waste Disposal (Illinois statewide rule), quoted and re-checked
- Menard County IL :: Zoning, quoted and re-checked
- § 150.08 Building and Occupancy Permits; Issuance (Village of Greenview), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.