McHenry County, Illinois
McHenry is a city in McHenry County, Illinois. McHenry adopts its own zoning, so inside its limits McHenry’s rules apply, not the county’s. Septic permits inside McHenry come from McHenry County (McHenry County Department of Health, Environmental Health Division · (815) 334-4000). 11 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the McHenry County page.
Construction, alteration, repair, removal or demolition of any structure inside McHenry city limits.
“a. building permit: it shall be unlawful to commence the construction, alteration, repair, removal or demolition of any structure in the city without obtaining a building permit from the city.”
Building construction inside McHenry city limits.
“be and is hereby adopted as mandated by the state of illinois for the control of buildings and structures as herein provided”
New or remodeled premises inside McHenry city limits, before a certificate of occupancy issues.
“2. the zoning administrator shall issue no certificate of occupancy for a new or remodeled premises unless he or she has inspected the premises after completion of all construction and certified that the premises is in conformity with the plans on which the building permit was based.”
Occupying or using any structure, land or premises in McHenry city, or changing its occupancy, in whole or in part.
temporary certificate of occupancy maximum period: <= 6 months (consistent with the safety of the occupants, for occupancy or partial occupancy pending completion of construction or alterations) · certificate of occupancy decision deadline: 20 days
“1. it shall be unlawful to occupy or use any structure, land, water or premises in the city, or change the occupancy or use thereof, in whole or in part, without obtaining a certificate of occupancy from the city.”
Land inside McHenry city limits; the city's own Title 11 Land Use Regulations (zoning) governs use and dimensional rules there.
“chapter 7: a-1 agriculture district chapter 8: residential districts chapter 9: commercial districts”
Zoning district structure of McHenry city.
“chapter 7: a-1 agriculture district chapter 8: residential districts chapter 9: commercial districts”
Land subdivision inside McHenry city limits.
“19. carry out any other function concerning land subdivision or other matters that may be conferred upon it by the subdivision control ordinance, zoning ordinance, this code, or any other city ordinance”
Building permit and certificate of occupancy process inside McHenry city limits.
“the building officer shall issue no building permit unless he or she has determined that the plans for the property for which the permit is sought comply with all applicable provisions of this title”
McHenry does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Onsite (septic) sewage systems on land inside McHenry city limits, where city sewer is not used; administered by the McHenry County Department of Health.
“a permit is required from the mchenry county department of health to install, modify, alter, extend, repair, replace or abandon a septic system in mchenry county.”
Installing, modifying, extending, repairing, replacing or abandoning a septic system on land inside McHenry city limits.
“a permit is required from the mchenry county department of health to install, modify, alter, extend, repair, replace or abandon a septic system in mchenry county.”
Onsite wastewater (off-grid sanitation) inside McHenry city limits, as administered by McHenry County.
“surface discharging onsite wastewater treatment systems are not allowed in mchenry county.”
We looked and could not find an official answer yet. Silence is not permission; ask McHenry or McHenry County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that McHenry publishes no rule on the point, not that none exists. McHenry County’s page lists the county offices to call.
Off-grid gear
Going off-grid in McHenry means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.