Macon County, Illinois
Village of Mount Zion is a village in Macon County, Illinois. Village of Mount Zion adopts its own zoning, so inside its limits Village of Mount Zion’s rules apply, not the county’s. 20 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Macon County page.
Construction inside Mount Zion village for which a building permit is required
“if a building permit is required and not issued before your project begins, a stop work order is issued”
“all above-ground and in-ground swimming pools require a building permit and most likely an electrical permit”
Commercial, industrial and dwelling construction inside Mount Zion village
“be and are hereby adopted by reference as the applicable minimum standards covering construction of commercial, industrial and dwelling structures within the village of mt. zion, illinois”
Construction-related permits issued by the Mount Zion village Building Permits and Inspections Department
“they are responsible for permitting all construction and conducting inspections of all construction-related permits”
All land inside the corporate limits of Mount Zion village (Village of Mt. Zion, Macon County, IL)
“for the purpose of this ordinance, all land and water areas within the corporate area of the village are divided into the following zones”
Zoning districts for land inside Mount Zion village
“(a) agricultural zone (va-1). the agricultural zone is established as a zone in which agriculture and certain related uses are encouraged as the principal uses of land.”
Agricultural zone (VA-1) in Mount Zion village
minimum lot area: >= 10 acres · minimum lot width: >= 200 feet
“va-1. (1) minimum lot area - 10 acres. (2) minimum lot width - 200 feet. (3) minimum front yard - 50 feet.”
“vr-2. (1) minimum lot area - 12,000 square feet. (2) minimum lot width - 80 feet. (3) minimum front yard - 30 feet.”
“vr-1. (1) minimum lot area - 1 to 2 units per acre. (2) minimum lot width - 150 feet. (3) minimum front yard - 35 feet.”
Suburban residential zone VR-1 in Mount Zion village
minimum front yard: >= 35 feet · minimum side yard (total): >= 60 feet (10 to 50 feet per side) · minimum rear yard: >= 30 feet
“(3) minimum front yard - 35 feet. (4) minimum side yard - 10 to 50 feet per side, total 60 feet. (5) minimum rear yard - 30 feet.”
“(3) minimum front yard - 50 feet. (4) minimum side yard - 20 feet to 100 feet per side, total 120 feet. (5) minimum rear yard - 100 feet.”
“(3) minimum front yard - 30 feet. (4) minimum side yard - 10 feet per side, total 20 feet. (5) minimum rear yard - 25 feet.”
Urban residential zone VR-2 in Mount Zion village
maximum building coverage: <= 0.3 share of lot
“(7) maximum coverage -.30. (8) maximum floor area ration -.30.”
“(6) maximum height - 35 feet. (7) maximum coverage -.30.”
Urban residential zone VR-2 in Mount Zion village
maximum height: <= 35 feet
“(5) minimum rear yard - 25 feet. (6) maximum height - 35 feet.”
“(5) minimum rear yard - 100 feet. (6) maximum height - 35 feet.”
Individual on-site wells and septic in the VR-1 suburban residential district of Mount Zion village
“the suburban residential zone is provided for low-density developments, especially in areas which are suitable for development, but which must be serviced by individual wells and septic disposal systems because of the lack of readily accessible community facilities.”
New single-family homes in Mount Zion village, by zoning district: VR-2 and VR-3 require community water and sewer; VR-1 is intended for individual wells and septic
“this district shall specifically permit single-family dwellings served with both community water and community sewer, or an acceptable on-site substitute as determined by e.p.a. standards (not septics).”
Development inside the floodplain of Mount Zion village (flood hazard areas, zoning code sections 150.170 through 150.179d)
“no person, firm, corporation, or government body not exempted by law shall commence any development in the floodplain without first obtaining a development permit form the village administrator.”
Building permit application process in Mount Zion village
“then print and fill out the building permit application form and return to village hall.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Mount Zion or Macon County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Mount Zion publishes no rule on the point, not that none exists. Macon County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Mount Zion means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.