Village of Forrest, Illinois requires a building permit for new construction or an addition to an existing structure.1 Forrest sets its own zoning standards; for homes not served by public sewer, private septic permits come from the Livingston County Health Department.23 Start with Village Hall for building and zoning questions, and the health department for private sewage disposal.45
At a glance
- Building permits
- Required for new construction and additions1
- Zoning
- Village residential, business and commercial districts2
- Septic permits
- Livingston County Health Department where public sewer does not serve the property3
- Minimum home size
- R Residential District: 400 square feet of ground-floor area for a detached single-family dwelling6
- Minimum lot
- R Residential District: 3,750 square feet and 50 feet mean or average width for a single-family dwelling7
- Floodplain development
- Village development permit required for development in the floodplain8
- Owner-installed septic
- Allowed for the owner’s personal residence, subject to sewage-disposal requirements and inspections9
Who to call
Zoning
Village of Forrest Village Hall
Starting contact for village building applications and zoning questions
323 S Williams Forrest, IL 61741
Building permits
Village of Forrest Building Permit Application
Village building-permit submission, review and inspection instructions
Septic permits
Livingston County Health Department, Environmental Health Division
Private sewage disposal plan approval, inspections and septic permits for homes not served by public sewer
310 E Torrance Avenue Pontiac , IL 61764
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Village of Forrest means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of Forrest, IL?
Forrest requires a building permit for new construction and additions to an existing structure.1 The village application asks for a drawing that includes a lot layout and front elevation, and the building permit must be posted at the job site before work starts.1 Forrest also requires foundation inspection before backfill and a final inspection; arrange those through the Village Office.1 Illinois leaves privately funded construction building-permit administration to the applicable local government, so a state office is not the application counter for a Forrest project.10
Who handles building applications in Village of Forrest?
Village Hall is the starting contact for Forrest building-permit applications and zoning questions, with the building application and zoning-code link on the village government page.4 Call 815-657-8226 or email [email protected] to discuss a proposed project.4 The village application says zoning committee members review the application and drawing, and approval can take 7–10 business days after receipt.1 Ask Village Hall for the current building-permit fee before submitting; we could not confirm a village building-permit fee schedule.4
Does Village of Forrest have zoning and minimum lot sizes?
Forrest publishes R Residential, B Business and C Commercial zoning districts, with uses governed by the applicable district regulations.2 In the R Residential District, a single-family dwelling needs a lot of at least 3,750 square feet and a mean or average width of at least 50 feet.7 A detached single-family dwelling in that district must have at least 400 square feet of ground-floor area.6 Front-yard requirements depend on adjoining development and corner-lot conditions, and side-yard provisions include an exception for lots in the village’s original plat; ask Village Hall to review the actual lot layout before choosing a footprint.114
How do septic permits work inside Village of Forrest?
Forrest properties not served by public sewer fall under the Livingston County Health Department’s private sewage disposal program.3 The Environmental Health Division approves installation plans, inspects systems and issues private sewage disposal permits.5 Illinois requires plan approval before private sewage disposal construction begins.12 For a subsurface seepage field, the county application process requires a soil investigation by an Illinois-licensed soil classifier or registered engineer.13 Owners may install a system serving their own personal residence, but must meet the other sewage-disposal requirements and give the health department at least 48 hours’ notice before excavation and again before covering for final inspection.914
Can you live in an RV or tiny home in Village of Forrest?
We could not confirm Forrest’s rules for living in an RV on private land, temporary camping, or tiny-home occupancy; ask Village Hall about the proposed dwelling and parcel before buying.4 The R Residential District’s 400-square-foot ground-floor minimum for detached single-family dwellings is a size standard, not a complete answer about permission for a particular tiny home.62 Where a Forrest home lacks public sewer service, private sewage disposal remains regulated by the county health department, including permits and inspections.15
Building a home in Village of Forrest: what are the steps?
- Ask Village Hall to confirm the parcel’s zoning district and review the planned use, lot dimensions and building footprint against village standards.42
- Confirm sewer service with Village Hall; if the home will use private septic, obtain county health department plan approval before septic construction.4312
- Submit the village building application with a lot layout and front elevation, and allow for the published review period.1
- Obtain a village development permit before development in the floodplain, with the required site drawings and elevation information.8
- Post the building permit before starting work and arrange foundation and final inspections through the Village Office.1
For a parcel outside Forrest’s limits, use the Livingston County guide for the county zoning and building questions.16
Watch-outs
- Forrest’s floodplain development permit requires other applicable federal, state and local permits to be obtained before issuance.8
- We could not confirm a Forrest certificate-of-occupancy requirement or a mandatory water/sewer connection rule; ask Village Hall before committing to a construction or utility plan.4
- An owner-installed septic allowance applies to the owner’s personal residence and does not waive sewage-disposal requirements or inspections.9
Sources
- Village of Forrest Building Permit Application (forrestil.org)
- ecode360.com (Village of Forrest), quoted and re-checked
- Septic Systems | Livingston County Health Department, IL (Village of Forrest), quoted and re-checked
- Village of Forrest Village Hall (forrestil.org)
- Livingston County Health Department, Environmental Health Division (lchd.us)
- ecode360.com (Village of Forrest), quoted and re-checked
- ecode360.com (Village of Forrest), quoted and re-checked
- Village of Forrest, IL Flood Damage Prevention (Village of Forrest), quoted and re-checked
- Private Sewage Disposal Permit Application, quoted and re-checked
- Illinois Codes FAQ (Illinois statewide rule), quoted and re-checked
- Village of Forrest, IL Classification of Uses (Village of Forrest), quoted and re-checked
- 77 Ill. Adm. Code 905.190 Installation Approval (Illinois statewide rule), quoted and re-checked
- lchd.us, quoted and re-checked
- Private Sewage Disposal Permit Application, quoted and re-checked
- Septic Systems | Livingston County Health Department, IL (Village of Forrest), quoted and re-checked
- Regional Planning & Zoning, quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.