Kane County, Illinois
Dundee Township is a township in Kane County, Illinois. Dundee Township adopts its own zoning, so inside its limits Dundee Township’s rules apply, not the county’s. Septic permits inside Dundee Township come from Kane County (Kane County Health Department, Environmental Health (Private Sewage Program) · 630-444-3040). 14 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Kane County page.
New construction, remodel, repair, or demolition on unincorporated land inside Dundee Township.
“Building permits are required for all new construction, remodel, repair or demolition projects on properties in unincorporated Kane County.”
Construction on unincorporated land inside Dundee Township, administered by Kane County.
adopted codes: 2021 IRC; 2021 IBC; 2021 IEBC; 2021 IMC; 2020 NEC; 2024 Illinois Energy Conservation Code; 2014 Illinois State Plumbing Code; 2018 Illinois Accessibility Code (County page states that amendments may apply in some cases.)
“Kane County has adopted the following building codes: 2021 International Residential Code, 2021 International Building Code,”
Permitted construction on unincorporated land inside Dundee Township, administered by Kane County.
inspection-request notice: 48-72 hours (Typically required.) · re-inspection fee: 100 USD (May be charged when the inspection is not ready; payable before the next inspection is scheduled.)
“If the inspection is not ready once the inspector arrives, a re-inspection fee of $100.00 may be charged and will need to be paid prior to scheduling the next inspection.”
Unincorporated land located inside Dundee Township; Kane County administers the applicable zoning ordinance rather than the township.
“It also manages the Kane County Zoning Ordinance and Zoning Maps, Agriculture and Farmland Programs, Historic Preservation, and Cable Television Administration for the unincorporated areas.”
Zoning districts for unincorporated land inside Dundee Township, administered by Kane County.
“Kane County Zoning Ordinance Kane County Interactive Zoning Map Kane County Zoning Atlas Map”
Subdivision of unincorporated land inside Dundee Township, administered under Kane County subdivision regulations.
minimum parts constituting subdivision: >= 2 parts (The source definition also requires a division or redivision by mapping, platting, conveyance, change, or rearrangement of boundaries.)
“In general, any division or redivision of a parcel of land into 2 or more parts by means of mapping, platting, conveyance, change or rearrangement of boundaries is considered a subdivision.”
Short-term rentals on unincorporated land inside Dundee Township, administered by Kane County.
maximum stay included in short-term-rental definition: <= 30 days
“Short-term rentals are defined as dwelling units rented for stays of up to 30 days.”
Kane County building-permit applications for unincorporated land inside Dundee Township.
“Special accommodations may be made if a digital application cannot be submitted, please contact the building division if this applies to you.”
Dundee Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New and repaired onsite septic systems on land inside Dundee Township that require a permit.
“If you need a new septic system or an existing one repaired, you are either constructing a new home or business, need to upgrade a failing or insufficient system, or add capacity due to increased demands on your system, a KCHD septic permit is required.”
New septic systems and existing septic-system repairs on land inside Dundee Township.
“A soil evaluation (formerly called a perc test) is required with every application for a new system or a renovation involving the septic field. Tank replacements do not require a soil evaluation.”
New onsite septic systems on land inside Dundee Township.
“If the soil is not suitable for a properly sized subsurface system, alternative systems, including aerobic treatment units, will be required.”
New or modified private water wells on land inside Dundee Township.
test-results filing deadline: <= 30 days after well completion (Licensed contractor must provide coliform results to KCHD.)
“State of Illinois Application for Permit to Construct, Modify or Abandon a Water Well”
A proposed new septic system on land inside Dundee Township.
public-sewer access pipe threshold: > 4 inches (A connection is not required under this stated threshold exception or where connection creates undue hardship.)
“Unless access to public sewer requires more than a 4-inch pipe or creates an undue hardship, you will need to connect to public sewer.”
KCHD septic and water-well permits applicable to land inside Dundee Township.
new single-family septic construction: 350 USD · single-family septic renovation: 215 USD · construct, deepen, or modify water well: 100 USD · well inspection fee: 180 USD (Paid at time of permit fee.)
“Fees effective 1/1/2026 – 12/31/2026 All fees are non-refundable”
We looked and could not find an official answer yet. Silence is not permission; ask Dundee Township or Kane County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Dundee Township publishes no rule on the point, not that none exists. Kane County’s page lists the county offices to call.