Henry County, Illinois
Clover Township is a township in Henry County, Illinois. Clover Township adopts its own zoning, so inside its limits Clover Township’s rules apply, not the county’s. Septic permits inside Clover Township come from Clover Township. 19 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Henry County page.
Construction, enlargement, alteration, repair, moving, demolition, or occupancy change of a building or structure in unincorporated Clover Township.
maximum stated potential fine or penalty: <= 500 USD (The instructions say a violation may result in fines and penalties up to this amount.)
“Any owner or authorized agent (contractor)who intends to construct, enlarge, alter, repair, move, demolish or change occupancy of a building/structure shall first obtain required building permit.”
An owner acting as contractor for work in unincorporated Clover Township.
“If property owner will be the contractor, write owner in space provided.”
Buildings and structures in the unincorporated portion of Clover Township.
International Building Code adoption date: 2001-04-17 (The document says the County replaced its prior code with the International Building Code 2000 Edition.)
“replaced the code with International Building Code 2000 Edition on April 17, 2001.”
Work for which a Henry County building permit is required in unincorporated Clover Township.
advance inspection notice: >= 24 hours
“All construction or work for which a permit is required shall be subject to inspection by the building official.”
Unincorporated land inside Clover Township, where Henry County administers its zoning program; this is not evidence of a separate Clover Township zoning ordinance.
“Henry County Zoning and Building Department is responsible for development and implementation of several land use management programs in the unincorporated areas of the county.”
District classifications shown on Henry County's building-permit application for unincorporated Clover Township.
listed district labels: AG-1; R-1/M-1; AG-2; R-2/B-1; C-1/H-1; R-3/R-5; R-4
“AG-1 R-1/M-1 [...] AG-2 R-2/B-1 [...] C-1/H-1 R-3/R-5 [...] R-4”
R-1/M-1 district entries on the Henry County building-permit application for unincorporated Clover Township.
minimum ground-floor area per dwelling: >= 825 square feet (R-1/M-1 table entry.)
“Ground Floor Area/Dwelling [...] R-1/M-1 43,560 150 40 10 40/10 825”
R-1/M-1 district entries on the Henry County building-permit application for unincorporated Clover Township.
minimum lot size: >= 43560 square feet (R-1/M-1 table entry.)
“Lot Size [...] R-1/M-1 43,560 150 40 10 40/10 825”
R-1/M-1 district entries on the Henry County building-permit application for unincorporated Clover Township.
front yard: >= 40 feet (R-1/M-1 table entry.) · side yard: >= 10 feet (R-1/M-1 table entry.)
“Front Yard Side Yard Rear Yard [...] R-1/M-1 43,560 150 40 10 40/10”
Private-water well associated with a building project in unincorporated Clover Township.
“PLEASE OBTAIN NECESSARY PRIVATE WATER WELL AND SEWAGE DISPOSAL SYSTEM PERMITS FROM THE HENRY COUNTY HEALTH DEPARTMENT BEFORE STARTING PROJECT”
Agricultural buildings and structures in unincorporated Clover Township.
“Illinois law exempts agricultural buildings/structures from all zoning regulations EXCEPT minimum set back from road right-of-way requirements”
Subdivision plats for unincorporated land inside Clover Township.
final plat fee for 1-3 lots without new streets or access easements: 50 USD (Plus $15 per lot.) · per-lot fee: per 15 USD (Applies to the stated final-plat category.)
“Final Subdivision Plat with 1-3 lots without new streets or easements of access [...] $50.00 + $15.00 per lot submitted to Zoning/Building Department”
Driveway access for a construction project inside Clover Township.
township-road centerline setback: >= 73 feet (Applies under the County building application.) · township-road right-of-way setback: >= 40 feet (Applies under the County building application.)
“Driveway access permits are required from highway authority with jurisdiction and must be installed prior to starting construction project.”
Building-permit applications for unincorporated Clover Township.
“Plot plans are required only for new structures or additions to existing structures to illustrate compliance with set back regulations.”
Clover Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private sewage disposal systems on property inside Clover Township, subject to the Henry County ordinance.
“Health Authority means the Administrator or Health Officer of Henry County Health Department or his or her designee.”
Construction, alteration, repair, extension, or enlargement of capacity of a private sewage disposal system inside Clover Township.
construction permit validity: 6 months (Void if construction has not started within the stated time limit.)
“It shall be unlawful for any person to construct, alter, repair, extend, and enlarge the capacity of any private sewage disposal system [...] unless he holds a valid construction permit issued by the Health Authority”
Private sewage disposal system installation inside Clover Township.
notice before backfilling: >= 48 hours
“I accept responsibility for notifying the Health Department at least forty-eight (48) hours prior to backfilling to allow for final inspection of the system.”
Human occupancy, use, or assembly inside Clover Township that relies on private sanitation.
public sewer availability distance: <= 200 feet (Private sanitation is not allowed under the ordinance when a public sanitary system is available.)
“No building, structure, area or premise shall be constructed or maintained for human occupancy, use or assembly, without adequate facilities for the sanitary and safe disposal of human excreta”
Property inside Clover Township where a publicly operated sanitary-waste collection and disposal system is available within 200 feet of the property line.
public sewer availability distance: <= 200 feet (Measured from the property line.)
“Where a publicly operated system for collection and disposal of sanitary wastes is available within two-hundred (200) feet of the property line, the utilization of such public sewage systems shall be considered the only safe and sanitary means”
We looked and could not find an official answer yet. Silence is not permission; ask Clover Township or Henry County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Clover Township publishes no rule on the point, not that none exists. Henry County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Clover Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.