Mazon Township is a township in Grundy County, Illinois. Septic permits inside Mazon Township come from the county and state together. 8 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Grundy County page.
Buildings and regulated appurtenances located in the portion of Mazon Township outside municipal limits.
“It is hereby required that a permit be obtained in advance and all other requirements of this title be complied with whenever a building or structure, or parts or appurtenances thereof, such as plumbing installation and electrical installation, located outside the limits of municipalities of this county and regulated by this title is erected, installed, altered, converted, remodeled, structurally repaired, moved or changed.”
Private sewage disposal system installation in Mazon Township when handled by the Grundy County Health Department.
advance notice: >= 48 hours (Prior to PSD-system installation or well drill.)
“Contact the Health Department to schedule an appointment 48 hours prior to the PSD system installation/ well drill in order to schedule an inspection.”
Private sewage disposal serving dwellings in Mazon Township.
“Every building occupied as a dwelling shall have a sewage system as provided herein, approved by the county health department.”
New development inside Mazon Township that is subject to the county Unified Development Code.
“If a sanitary sewer system is not available and a new community sewage system with centralized treatment is not warranted or feasible, residential housing units and nonresidential facilities shall be served by individual or cluster on site sewage disposal systems.”
County building permits for the portion of Mazon Township outside municipal limits.
“Payment of the fees, as required by the schedule of fees adopted by resolution by the Grundy County board, shall be made with the application.”
County building permits for the portion of Mazon Township outside municipal limits.
application examination: <= 10 days (Examination by or under direction of Building Officer.) · residential accessory-building plan-waiver threshold: <= 700 square feet (Only if sufficiently described in application and not involving structural changes.)
“Examination of the application and plans shall be made within ten (10) days by or under the direction of the building officer.”
Mazon Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private sewage disposal systems serving land inside Mazon Township, subject to municipal-system availability and Illinois EPA jurisdiction.
“In some cases, permit approval of the Illinois EPA will be required in lieu of county approval. Systems that are regulated by the IEPA are not regulated by the county health department.”
Construction or alteration of a private sewage disposal system inside Mazon Township, where county rather than Illinois EPA approval has jurisdiction.
“No private sewage disposal system shall be constructed or altered unless a permit shall first have been obtained from the county health department.”
We looked and could not find an official answer yet. Silence is not permission; ask Mazon Township or Grundy County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Mazon Township publishes no rule on the point, not that none exists. Grundy County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Mazon Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.