Ford County, Illinois
Dix Township is a township in Ford County, Illinois. Septic permits inside Dix Township come from Ford County (Ford County Public Health Department — Well and Septic Program · (217) 379-9281). 14 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Ford County page.
Dix Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction and projects increasing the square footage of existing buildings on unincorporated land inside Dix township.
construction permit fee up to 200 square feet: 20 USD (Non-agricultural projects.) · construction permit fee over 200 square feet: per 0.15 USD per square foot (Non-agricultural projects.)
“Construction permits are required for all new construction and for all projects which increase the square footage of existing buildings on the property.”
Work receiving a Ford County zoning construction permit on unincorporated land inside Dix township.
“He shall examine premises for which permits have been issued, and shall make necessary inspections to see that the provisions of law are complied with. [...] Inspections shall be made by the Zoning Enforcing Officer or a duly appointed assistant.”
A building requiring a building permit on unincorporated land inside Dix township.
temporary certificate duration: <= 1 year (During completion of alterations or partial occupancy pending completion.)
“No building requiring a building permit shall be occupied before a Certificate of Occupancy has been issued.”
Unincorporated land inside Dix township subject to the Ford County Zoning Ordinance.
“(1) AG-1 Agricultural District [...] (3) R - 1 Residential District [...] (8) I - 1 Industrial District”
Single-family dwelling in the R-1 Residential District on unincorporated land inside Dix township.
minimum lot area per family: 20000 square feet (R-1 single-family dwelling.) · minimum lot width: 100 feet (R-1.)
“R – 1 100 20,000 20,000 N. A. N. A. Water **”
Development in the AG-1 Agricultural District on unincorporated land inside Dix township.
front yard: 50 feet (AG-1.) · side yard: 20 feet (AG-1.) · rear yard: 50 feet (AG-1.)
“District Front Yard Side Yard Rear Yard AG-1 50 20 50”
“District Front Yard Side Yard Rear Yard [...] R - 1 30 10 30”
Buildings in the R-1 Residential District on unincorporated land inside Dix township.
maximum building height: 35 feet (R-1 District.)
“Maximum height limits established for buildings and structures are as follows: (1) Thirty-five feet in the CO-1, R-1 and R-2 Districts.”
Manufactured homes on permanent foundations in the R-1 Residential District on unincorporated land inside Dix township.
“(k) Manufactured homes on permanent foundations and modular homes.”
Private sewage-system installation inside Dix township, which is within Ford County.
“Enforces regulations governing the installation and/or sealing of private well and installation of sewage systems.”
New private water-well construction inside Dix township.
“To ensure the safety of these water supplies, the IDPH and local health departments review water well installation plans, issue permits for new well construction, and inspect wells.”
Agricultural-use buildings on unincorporated land inside Dix township.
construction permit fee: 0 USD (Agricultural-use buildings.)
“Agricultural use buildings require a permit; however, by statute no fee is charged.”
Non-agricultural construction permits for unincorporated land inside Dix township.
construction permit fee up to 200 square feet: 20 USD (Non-agricultural projects.) · construction permit fee over 200 square feet: per 0.15 USD per square foot (Non-agricultural projects.)
“A fee of $20.00 for the first 200 square feet and fifteen cents ($.15) per square foot for structures over 200 sq ft is charged for all non-agricultural projects.”
Construction-permit applications for unincorporated land inside Dix township.
permit commencement deadline: <= 1 year (A permit expires if work has not commenced within one year after issuance.) · advance notice before starting work: >= 12 hours (Notice to the Zoning Enforcing Officer.)
“It shall be unlawful to construct, alter, remove or to commence the construction, alteration, or removal of a building or structure without first filing with the Zoning Enforcing Officer an application in writing and obtaining a formal permit. They may be requested by telephone, the request later to be in written form and mailed or brought to the Zoning Enforcing Officer at the Courthouse.”
We looked and could not find an official answer yet. Silence is not permission; ask Dix Township or Ford County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Dix Township publishes no rule on the point, not that none exists. Ford County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Dix Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.