Ford County, Illinois
Button Township is a township in Ford County, Illinois. Septic permits inside Button Township come from the state health agency. 15 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Ford County page.
Button Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction and projects that increase the square footage of existing buildings on land in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of Gibson City, Paxton, and Piper City
“construction permits are required for all new construction and for all projects which increase the square footage of existing buildings on the property.”
Zoning districts applying in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
“(1) ag-1 agricultural district (2) co-1 conservation district (3) r - 1 residential district (4) r - 2 residential district (5) r - 3 residential district (6) b - 1 highway business district (7) b - 2 general business district (8) i - 1 industrial district”
Main single-family residential district R-1 in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
minimum lot area, R-1 single-family: >= 20000 sq ft · minimum lot width, R-1: >= 100 ft
“lot width in ft. 150 150 100 65 60 none none none lot area in sq.ft. 43,560 43,560 20,000 7,800 6,000 none none none”
“lot width in ft. 150 150 100 65 60 none none none lot area in sq.ft. 43,560 43,560 20,000 7,800 6,000 none none none”
Main single-family residential district R-1 in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
front yard, R-1: >= 30 ft · side yard, R-1: >= 10 ft · rear yard, R-1: >= 30 ft
“front yard 50 50 30 25 25 25 none side yard 20 20 10 5 5 none none rear yard 50 50 30 25 25 25 none”
“front yard 50 50 30 25 25 25 none side yard 20 20 10 5 5 none none rear yard 50 50 30 25 25 25 none”
Main single-family residential district R-1 in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
maximum building height, R-1: <= 35 ft
“(1) thirty-five feet in the co-1, r-1 and r-2 districts.”
Living in a trailer or RV on land in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
“except where otherwise permitted, all inhabited trailers shall be located in a trailer court which has received a conditional use permit and which conforms with the requirements of the following paragraph.”
Seasonal campgrounds and camps in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
“camps or campgrounds, commercial or governmental tracts of land of a design or character suitable for, or used for seasonal recreation and other similar living purposes.”
Occupancy of a mobile or manufactured home in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
minimum mobile home lot area: >= 5000 sq ft (lots in a trailer court) · minimum mobile home lot width: >= 50 ft (lots in a trailer court)
“each lot provided for the occupancy of a single mobile home unit shall have an area of not less than 5,000 square feet and a width of not less than 50 feet, and no park shall be permitted an average density of trailer lots of more than 8 per acre”
Private sewage (septic) systems on land inside Button township, Ford County, Illinois
“there are about 90 local health agencies in illinois that also review sewage disposal system construction plans, either by authority of a local ordinance or as an "agent" of the department.”
Agricultural use buildings in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
“agricultural use buildings require a permit; however, by statute no fee is charged.”
Land division and subdivision in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
“a plat of development shall be recorded regardless of whether a subdivision is proposed and such plat shall show building lines, common land, streets, easements and other applicable features required by the ordinance regulating the subdivision of land.”
Construction permit fees for non-agricultural projects in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of Gibson City, Paxton, and Piper City
construction permit fee, first 200 sq ft: 20 USD (non-agricultural projects) · construction permit fee per square foot over 200 sq ft: per 0.15 USD (structures over 200 sq ft; non-agricultural projects)
“a fee of $20.00 for the first 200 square feet and fifteen cents ($.15) per square foot for structures over 200 sq ft is charged for all non-agricultural projects.”
Zoning permit process in unincorporated Ford County, including Button township outside the one-and-one-half-mile zones of the cities
“the ford county zoning office administers the ford county zoning ordinance.”
We looked and could not find an official answer yet. Silence is not permission; ask Button Township or Ford County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Button Township publishes no rule on the point, not that none exists. Ford County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Button Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.