Ford County, Illinois
Brenton Township is a township in Ford County, Illinois. 13 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Ford County page.
Brenton Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New construction and additions that increase the square footage of existing buildings on land inside Brenton township outside village or city zoning limits
“construction permits are required for all new construction and for all projects which increase the square footage of existing buildings on the property.”
Land inside Brenton township outside the limits of any village or city that has its own zoning. The county zoning ordinance covers this land because no Brenton township zoning ordinance was found. Ford County administers it; this is not a township-adopted ordinance.
“the zoning ordinance applies to the unincorporated areas of the county, as well as villages that do not have their own zoning.”
Zoning districts that apply to land inside Brenton township outside village or city zoning limits
“(1) ag-1 agricultural district (2) co-1 conservation district (3) r - 1 residential district (4) r - 2 residential district (5) r - 3 residential district (6) b - 1 highway business district (7) b - 2 general business district (8) i - 1 industrial district”
AG-1 agricultural district land inside Brenton township outside village or city zoning limits
minimum lot area, single-family dwelling: >= 43560 sq ft (AG-1 district; lots of record exception in Section 4(b)(1)) · minimum lot width: >= 150 ft (AG-1 district)
“lot width in ft. 150 150 100 65 60 none none none lot area in sq.ft. 43,560 43,560 20,000 7,800 6,000 none none none”
“lot width in ft. 150 150 100 65 60 none none none lot area in sq.ft. 43,560 43,560 20,000 7,800 6,000 none none none”
AG-1 agricultural district land inside Brenton township outside village or city zoning limits
front yard: >= 50 ft (AG-1 district) · side yard: >= 20 ft (AG-1 district) · rear yard: >= 50 ft (AG-1 district)
“district ag-1 co-1 r-1 r-2 r-3 b-1 b-2 front yard 50 50 30 25 25 25 none side yard 20 20 10 5 5 none none rear yard 50 50 30 25 25 25 none”
“district ag-1 co-1 r-1 r-2 r-3 b-1 b-2 front yard 50 50 30 25 25 25 none side yard 20 20 10 5 5 none none rear yard 50 50 30 25 25 25 none”
R-1 residential district land inside Brenton township outside village or city zoning limits
maximum building height: <= 35 ft (R-1 district; see Section 5(b) exceptions)
“thirty-five feet in the co-1, r-1 and r-2 districts.”
Agricultural use buildings on land inside Brenton township outside village or city zoning limits
“agricultural use buildings require a permit; however, by statute no fee is charged.”
Planned unit developments and land divisions that the ordinance connects to a separate county subdivision ordinance, inside Brenton township outside village or city zoning limits
“the site shall contain a minimum of 10 acres. the housing type, minimum lot area, yard, height, and accessory uses shall be determined by the requirements and procedure set out below, which shall prevail over conflicting requirements of this ordinance or the ordinance governing the subdivision of land.”
Residential building in the CO-1 conservation district, which covers flooding areas, inside Brenton township outside village or city zoning limits
“(c) single family dwelling if protected from flooding.”
Construction permit fees for non-agricultural projects in Brenton township outside village or city zoning limits
construction permit fee, first 200 square feet: 20 USD (non-agricultural projects only) · construction permit fee per square foot over 200 sq ft: per 0.15 USD (structures over 200 sq ft; non-agricultural projects only)
“a fee of $20.00 for the first 200 square feet and fifteen cents ($.15) per square foot for structures over 200 sq ft is charged for all non-agricultural projects.”
Zoning construction-permit process for land inside Brenton township outside village or city zoning limits
“a permit must be obtained before construction begins.”
We looked and could not find an official answer yet. Silence is not permission; ask Brenton Township or Ford County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Brenton Township publishes no rule on the point, not that none exists. Ford County’s page lists the county offices to call.