Bolthole Index

Fayette County, Illinois

Zoning, building permits and septic rules in Wilberton Township, Illinois

Wilberton Township is a township in Fayette County, Illinois. Septic permits inside Wilberton Township come from Wilberton Township. 5 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Fayette County page.

Answers from the rulebook for Wilberton Township

Rules another office applies inside Wilberton Township

Wilberton Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicLocal (with conditions)

    Private sewage disposal systems serving land inside Wilberton Township.

    • The proposed system must meet the Illinois Department of Public Health Private Sewage Disposal Licensing Act and Code.
    “The Fayette County Health Department is a [...] unit of the local government of Fayette County, Illinois. [...] newly constructed septic system inspections and permits”
  • Septic permitRequired

    Installation or renovation of a private sewage disposal system serving land inside Wilberton Township.

    • A Private Sewage Disposal System Plan Review Application and $75.00 application fee must be submitted before installation.
    • The proposed system must meet the Illinois Department of Public Health Private Sewage Disposal Licensing Act and Code.
    • The applicant must give the Division of Environmental Health 48-hour notification before installation.

    application fee: 75 USD · pre-installation notification: 48 hours

    “Before a private sewage disposal system can be installed, a [...] Plan Review Application and a $75.00 application fee must be submitted.”
  • Well permitRequired

    New private water wells serving land inside Wilberton Township.

    • An Illinois Department of Public Health Application for Permit to Construct, Modify or Abandon a Water Well and a $100.00 application fee payable to the Illinois Department of Public Health must be submitted.
    • The proposed well must meet the Illinois Water Well Construction Code.
    • The applicant must give the Division of Environmental Health 48-hour notification before installation.

    application fee: 100 USD (payable to the Illinois Department of Public Health) · pre-installation notification: 48 hours

    “Before a private water well can be installed, [...] the $100.00 application fee [...] must be submitted.”
  • Building in a floodplainRequired

    Construction inside Wilberton Township when the site is in a regulated floodway: streams with drainage areas of at least one square mile in urban areas or ten square miles in rural areas.

    • The state Division must permit the construction before it begins.
    • For a qualifying statewide or regional permit, no application submission is needed if all permit limits are met.
    • If no floodway has been delineated, the Division generally requires permits for work anywhere in the floodplain.

    urban stream drainage-area threshold: >= 1 square mile · rural stream drainage-area threshold: >= 10 square miles

    “All construction activities in the floodways of streams [...] must be permitted by the Division prior to construction.”
  • Permit processPartial

    Private sewage and private-well installation processes serving land inside Wilberton Township.

    • The septic process requires plan-review application, a $75.00 fee, code compliance, permit issuance, and 48-hour notification.
    • The well process requires the state application, $100.00 fee, code compliance, permit issuance, and 48-hour notification.
    “48 hour notification to the Division of Environmental health”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Wilberton Township or Fayette County directly.

  • Building permit — Residential construction inside Wilberton Township.
  • Owner-builder exemption — Owner-built homes inside Wilberton Township.
  • Building code adopted — Residential construction inside Wilberton Township.
  • Inspections — Residential building inspections inside Wilberton Township.
  • Certificate of occupancy — New residential occupancy inside Wilberton Township.
18 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Wilberton Township publishes no rule on the point, not that none exists. Fayette County’s page lists the county offices to call.

← All of Fayette County: county rules, score and offices