Effingham County, Illinois
Village of Teutopolis is a village in Effingham County, Illinois. 6 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Effingham County page.
Zoning districts inside Teutopolis village limits.
“Residential Districts 154.045 Description 154.046 R-1, Single-Family Residence Districts”
Main or principal structures and detached accessory structures in Teutopolis residential districts.
minimum setback from nearest right-of-way line: >= 25 feet (55 feet from the centerline of the abutting street applies if greater) · minimum setback from abutting-street centerline: >= 55 feet (Applies where greater than the right-of-way-line measurement) · minimum setback from shore line or high water line: 50 feet (Where the lot abuts a storm or floodwater runoff channel or basin)
“The minimum setback line shall be 25 feet from the nearest right-of-way line or 55 feet from the centerline [...] whichever is greater.”
Main or principal residential structures in Teutopolis residential districts.
maximum main or principal structure height: <= 35 feet (Multi-family dwellings may not exceed two stories)
“No main or principal structure shall exceed 35 feet in height, except that multi-family dwellings shall be permitted to a height not to exceed two stories;”
Short-term rentals within Teutopolis village corporate limits.
“Permit required. Short term rentals may be established and maintained on properties within the corporate limits [...] in accordance with this section;”
Village building-permit applications.
building or structure application fee up to 20,000 square feet: per 10 USD per 100 square feet or portion (Up to 20,000 square feet of floor area) · building or structure application fee above 20,000 square feet: per 5 USD per 100 square feet or portion (Floor area exceeding 20,000 square feet in the same building or structure) · garage or non-principal building fee: 25 USD (Garage designed for fewer than three automobiles or other non-principal building or structure) · agricultural NU-district structure fee: 25 USD (Structure constructed and used exclusively for agricultural purposes in a NU, Non-Urban District) · demolition permit fee: 10 USD (Permit to raze a building or structure within the village)
“Ten dollars for each 100 square feet, or portion thereof, of building or structure floor area up to 20,000 square feet of floor area”
Short-term-rental permits inside Teutopolis village limits.
“Any owner desiring to secure a short term rental permit from the village shall complete and file with the Building Official an application for a short term rental permit on such forms as prescribed by the Building Official (hereinafter referred to as the “short term rental permit application”). A short term rental permit application shall include at least the following information:”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Teutopolis or Effingham County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Teutopolis publishes no rule on the point, not that none exists. Effingham County’s page lists the county offices to call.