Effingham County, Illinois
Altamont is a city in Effingham County, Illinois. Altamont adopts its own zoning, so inside its limits Altamont’s rules apply, not the county’s. Septic permits inside Altamont come from Effingham County (Effingham County Health Department, Environmental Health · (217) 342-9237). 15 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Effingham County page.
Construction projects inside Altamont city limits.
“Prior to the start of a building project an “Application for Certificate of Zoning Compliance, Building/Construction Permit and Enterprise Zone Benefits” form must be completed.”
Building sites subject to the city's zoning/building-compliance application procedure.
“It is the zoning administrators duty and application requirement to inspect the building site to establish zoning compliances within the designated zone area.”
Structures and land uses within Altamont city corporate limits.
“The boundaries of the listed zoning districts are hereby established as shown on the zoning map of this municipality.”
Land within Altamont city limits.
“The boundaries of the listed zoning districts are hereby established as shown on the zoning map of this municipality.”
Travel trailers and other recreational vehicles inside Altamont city limits.
“No travel trailer or other recreational vehicle shall be used as a dwelling.”
Manufactured-home occupancy inside Altamont city limits.
“Manufactured homes and modular homes, provided said units conform to all applicable requirements of the Revised Code.”
Use of an accessory structure as a dwelling inside Altamont city limits.
“Use of any accessory structure as a dwelling is strictly prohibited throughout the City.”
Private sewerage systems inside Altamont city limits.
“Whenever the public sewerage system is not reasonably accessible, a private sewerage system shall be installed and used.”
Sewage service for development inside Altamont city limits.
“Whenever the public sanitary sewerage system is reasonably accessible (that is, when the distance from the property in question to the nearest public sewer with available capacity does not exceed one hundred (100) feet, all sewage shall be discharged into such system whether or not a private sewerage system already exists or is more convenient.”
Construction permit applicants inside Altamont city limits.
“Application for permits must be made by the owner of the property on which the construction is to take place or his duly authorized agent. A legal description of the property and a site plan of the proposed construction must be included with this application.”
Altamont does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Principal single-family building in the SR-1 Single-Family Residence District (Large Lot) inside Altamont city limits.
minimum living area: >= 900 square feet
“In the “SR-1” District, only one (1) principal building (single-family) shall be situated on any one (1) lot. The living area shall have a minimum of nine hundred (900) square feet.”
Principal building in the SR-1 Single-Family Residence District (Large Lot) inside Altamont city limits.
minimum lot area: >= 10000 square feet · minimum lot width at established building line: >= 80 feet · minimum lot depth: >= 100 feet
“Every principal building erected in the “SR-1” District shall conform to the following requirements:”
Principal building in the SR-1 Single-Family Residence District (Large Lot) inside Altamont city limits.
maximum percent coverage per lot: <= 25 percent
“(G) Maximum Percent Coverage Per Lot 25%”
Individual domestic sewage disposal systems inside Altamont city limits, which are within Effingham County.
“It shall be unlawful for any person to construct, alter or extend individual domestic sewage disposal systems within the county unless he or she holds a valid permit issued by the Health Department stating the name of such person for which the specific construction, alteration or extension is proposed.”
Construction, alteration, or extension of an individual domestic sewage disposal system inside Altamont city limits.
initial construction, alteration, or extension permit fee: 100 USD (Collected by the Health Department when the application is submitted.)
“Said permit to construct is valid for a period of six months from date of issuance. If construction has not started within this period, the permit is void.”
We looked and could not find an official answer yet. Silence is not permission; ask Altamont or Effingham County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Altamont publishes no rule on the point, not that none exists. Effingham County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Altamont means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.