Village of Woodridge, Illinois requires a building permit before construction, alteration, repair and other listed work begins.1 Woodridge sets its own zoning, and its Community Development Department handles building review and planning.23 For a parcel in DuPage County, contact DuPage County Health Department Plan Review about septic installation or repair; we could not confirm the septic authority for every Woodridge parcel.4
At a glance
- Building permits
- Required before listed construction, repairs, building-system and driveway work1
- Zoning
- Village zoning applies; lot size and setbacks depend on the district2567
- Residential building fees
- $400 plan review; $0.40 per square foot for building permit and inspection, with a $350 minimum; additional fees excluded8
- Accessory dwellings
- Conditional in R-1, R-2 and R-3; detached ADUs limited to 800 square feet9
- Public sewer
- Connection required for qualifying new buildings when sewer is within 400 feet along the available main-extension path10
- Owner plumbing work
- Qualifying owner occupants may do their own plumbing, subject to code, inspection and local permit requirements1112
Who to call
Building permits
Village of Woodridge Community Development Department
Village building permit applications, building inspections and plan review, planning and zoning; ask for a planner for parcel-use questions.
5 Plaza Drive Woodridge, IL 60517
Septic permits
DuPage County Health Department Plan Review
Questions about permits for septic installation or repair on the DuPage County portion of Woodridge; confirm parcel jurisdiction and sewer requirements with the Village.
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Village of Woodridge means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of Woodridge, IL?
Woodridge requires a building permit before erection, construction, alteration, repair, demolition or movement of a building or structure, including listed electrical, plumbing and mechanical work.1 The requirement also covers site clearing or excavation for a proposed building and driveway work in or across a public walk, parkway or curb.1 A Woodridge property owner remains responsible for compliance even when a former owner performed the work.1 Building permit issuance requires submitted plans, adequate approved water and sewerage facilities, and payment of required fees.13
Who handles building permits in Village of Woodridge?
The Village of Woodridge Community Development Department provides building inspections, plan review, planning and zoning services.3 Call 630-719-4750 to confirm the applications needed for your building project; ask for a planner when the question concerns the proposed use or development of a parcel.3 Woodridge residential fees for single, duplex and townhouse buildings include a nonrefundable $400 plan-review fee plus $0.40 per square foot for the building permit and inspection, including basement and garage space, with a $350 minimum.8 Accessory-structure, plumbing and electrical fees are additional.8
Does Village of Woodridge have zoning, lot-size rules and setbacks?
Woodridge has village zoning, with separate residential, business and industrial districts.2 In Woodridge’s R-1 district, the minimum lot area is 43,560 square feet; front, rear and exterior side yards require 50 feet, while the interior side yard requires 15 feet.57 R-1 maximum building coverage is 35%, and maximum height is the lower of 35 feet or 2 stories.1415 Woodridge’s R-2 minimum lot area is 12,000 square feet, while R-3 requires 8,200 square feet.6 Ask the Village’s Community Development Department planner to identify the parcel’s district before designing a house or addition.3
How do septic permits and sewer connections work inside Woodridge?
Woodridge requires qualifying new houses, buildings and structures to connect to public sanitary sewer at the owner’s expense when the property abuts a street or right-of-way containing sewer and the sewer is within 400 feet of a property line, measured along the available main-extension path.10 Connection is due within 90 days after official notice.10 Illinois requires approval of new private sewage-disposal system plans from IDPH or the applicable local authority before construction begins.16 For Woodridge land in DuPage County, ask Health Department Plan Review about installing or repairing septic; we could not confirm the complete septic-permit authority for all village parcels.4 Confirm adequate approved water and sewerage facilities with the Village before seeking building permit issuance.13
Can you live in an RV or tiny home in Village of Woodridge?
We could not confirm Woodridge’s rules for residential RV occupancy, temporary camping or a standalone tiny home; ask the Village Community Development Department planner about the proposed use before buying land for that purpose.3 Woodridge does allow accessory dwelling units conditionally on lots with a single dwelling unit in R-1, R-2 and R-3, with a building permit required.9 At least one occupant of the primary dwelling or ADU must own the property, and yard, bulk, exterior-design and parking requirements apply.9 A detached ADU may be no larger than 800 square feet and requires 10 feet between foundations.9
Building a home in Village of Woodridge: what are the steps?
- Ask Woodridge Community Development to confirm the applications needed and discuss the proposed development with a planner.3
- Prepare the survey, required topographic information and building plans; plans generally need an Illinois-licensed architect’s seal, with stated exceptions for working drawings for single-family additions or accessory structures.13
- Establish approved water and sewerage, drainage protection and satisfactory all-weather emergency access, and pay the required fees before building permit issuance.13
- Arrange required Village building inspections during construction.17
- Obtain Woodridge’s occupancy permit before occupying a new home; the premises must meet approved plans and applicable zoning regulations.18
For a subdivision lot, Village Board approval of the plat and public-improvement plans must precede building permit issuance.19
What should you check before buying land in Village of Woodridge?
Ask Woodridge Community Development about the parcel’s proposed use and required building or development applications.3 We could not confirm complete village floodplain-development or driveway-access standards; include those questions in the same discussion.3 Illinois requires an IDOT permit before work within a state-maintained road’s right-of-way, including access-driveway requests.20 For a private well on the DuPage County portion of Woodridge, the DuPage County Health Department has a permit process for installation or repair.21 For land outside village limits, see DuPage County’s guide: the county building-code material applies to unincorporated land.22
Watch-outs
- A Woodridge temporary occupancy permit is limited to 6 months and requires a cash bond equal to 150% of estimated completion costs; obtain Village approval before moving in.18
- Illinois’s qualifying owner-occupant plumbing exemption does not establish a general exemption from Woodridge building permits or local plumbing permits.1112
- An ADU must remain accessory to a principal structure in Woodridge; conditional ADU permission does not establish permission for a standalone tiny home.9
Sources
- 8-1A-9: Building Permits (Village of Woodridge), quoted and re-checked
- Woodridge, IL Code of Ordinances (Village of Woodridge), quoted and re-checked
- Village of Woodridge Community Development Department (woodridgeil.gov)
- DuPage County Health Department Plan Review (dupagehealth.org)
- 9-5-1: R-1 Detached Single Dwelling Unit District (Village of Woodridge), quoted and re-checked
- Zoning District Dimensional Table (Village of Woodridge), quoted and re-checked
- 9-5-1: R-1 Detached Single Dwelling Unit District (Village of Woodridge), quoted and re-checked
- 3-1A-3: Fee Schedule (Village of Woodridge), quoted and re-checked
- 9-3-17: Accessory Dwelling Units (Village of Woodridge), quoted and re-checked
- 7-5C-1: Use of Public Sewers Required (Village of Woodridge), quoted and re-checked
- HB5913 Enrolled — Illinois Plumbing License Law amendment (Illinois statewide rule), quoted and re-checked
- 225 ILCS 320/18 — Local regulation; Department standards (Illinois statewide rule), quoted and re-checked
- 8-1A-9: Building Permits (Village of Woodridge), quoted and re-checked
- 9-5-1: R-1 Detached Single Dwelling Unit District (Village of Woodridge), quoted and re-checked
- 9-5-1: R-1 Detached Single Dwelling Unit District (Village of Woodridge), quoted and re-checked
- 77 Ill. Adm. Code 905.190 Installation Approval (Illinois statewide rule), quoted and re-checked
- 8-1A-10: Inspections (Village of Woodridge), quoted and re-checked
- 8-1A-12: Certificate of Occupancy (Village of Woodridge), quoted and re-checked
- 10-7-3: Building and Occupancy Permits (Village of Woodridge), quoted and re-checked
- Highway Permits (Illinois statewide rule), quoted and re-checked
- Water | DuPage County Health, quoted and re-checked
- Building and Permits, quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.