Paw Paw Township is a township in DeKalb County, Illinois. 10 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the DeKalb County page.
Paw Paw Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction on unincorporated land inside Paw Paw township.
“reviews and issues all building permits for construction in unincorporated DeKalb County”
Owner-occupant serving as a subcontractor on a permitted project on unincorporated land inside Paw Paw township.
“a Homeowner Exemption Contractor Registration Form as owner-occupant serving as a subcontractor on the project.”
Residential construction on unincorporated land inside Paw Paw township.
residential code: 2021 International Residential Code · energy code: 2021 IECC – Illinois State Energy Conservation Code
“This page is a listing of the codes that are enforced by DeKalb County, effective July 1, 2019.”
Permitted construction on unincorporated land inside Paw Paw township.
“Then, it is your responsibility to call for all required inspections as outlined in your permit package.”
Unincorporated land inside Paw Paw township; incorporated municipal land is excluded.
“DeKalb County is responsible for land use decisions for any property not annexed to a municipality. These are commonly referred to as “unincorporated properties”.”
Unincorporated land inside Paw Paw township, by parcel zoning classification.
“The map divides the community into zones or districts with specific use classifications.”
Private water-well drilling inside Paw Paw township.
water well permit/inspection/sample fee: 310 USD
“A) Yes. By law a permit must obtained from the health department.”
Building-permit applications on a parcel inside Paw Paw township with no driveway entrance or only an agricultural field entrance.
“A copy of the access permit from the appropriate road authority (if construction is to occur on a parcel possessing no driveway entrance or only an agricultural field entrance).”
Well and septic permits inside Paw Paw township.
water well permit/inspection/sample: 310 USD · septic permit, contractor installed: 415 USD · septic permit, homeowner installed: 615 USD
“Water Well Permit*/Inspection/Sample | $310.00”
Building-permit applications for unincorporated land inside Paw Paw township.
typical turnaround: 1 to 3 weeks (Depends on project complexity)
“Depending on the complexity of your project, turnaround time will typically take between one (1) to three (3) weeks.”
We looked and could not find an official answer yet. Silence is not permission; ask Paw Paw Township or DeKalb County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Paw Paw Township publishes no rule on the point, not that none exists. DeKalb County’s page lists the county offices to call.