Zoning, building permits and septic rules in Village of New Bedford, Illinois

Village of New Bedford is a village in Bureau County, Illinois. Village of New Bedford has not adopted its own zoning; the county’s or state’s rules apply inside its limits. 7 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Bureau County page.

Answers from the rulebook for Village of New Bedford

Village of New Bedford’s own rules

  • Local zoningAbsent (with conditions)

    Village of New Bedford's own zoning: the Bureau County planning and zoning department lists New Bedford village among the incorporated towns without municipal zoning controls, so county zoning applies inside the village instead.

    • Zoning-type rules inside New Bedford village come from the Bureau County zoning ordinance, not a village ordinance.
    • Village has no municipal zoning per the county's list; confirm with the village clerk.
    “in all incorporated towns in bureau county without municipal zoning controls including: arlington buda bureau cherry dover hollowayville lamoille malden manlius mineral new bedford ohio sheffield wyanet”

Rules another office applies inside Village of New Bedford

Village of New Bedford does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitRequired

    Residential construction inside New Bedford village, under Bureau County planning and zoning (the village has no municipal zoning controls).

    • County says permits are generally required, not in every case.
    • Department says to contact it before a project begins.
    “on residentially used land, for example, permits are generally required for most construction including new homes; additions to homes; decks, porches and patios; detached buildings, including small storage buildings (sheds); and. swimming pools (both above and below ground).”
  • InspectionsRequired

    Construction inside New Bedford village that needs a county zoning permit.

    • Source says 'generally', so the count may vary by project.

    inspections during construction: 3 count (generally)

    “generally, three inspections are made during the course of construction.”
  • Certificate of occupancyRequired

    Completed construction or a change of use of land inside New Bedford village under the county zoning ordinance.

    • Issued upon completion of construction or when land use changes.
    “occupancy certificates are issued upon completion of the construction project, or when the use on a tract of land changes.”
  • Agricultural exemptionConditional

    Agricultural uses inside New Bedford village that fall under the state agricultural exemption from county zoning.

    • Exemption applies only to certain agricultural uses under state law.
    • County suggests verifying with the zoning department and then with legal counsel.
    “certain agricultural uses are exempt from meeting local zoning requirements according to state law.”
  • Subdividing landRegulated (with conditions)

    Division of land inside New Bedford village under the Bureau County subdivision ordinance.

    • Bureau County subdivision ordinance applies as stated; the ordinance text was not opened.
    “the planning & zoning department is charged with regulating the division of lands under the jurisdiction of the bureau county zoning ordinance.”
  • Building in a floodplainLimited

    Development on land designated as special flood hazard area inside New Bedford village.

    • Bureau County floodplain ordinance is incorporated by reference in the county zoning ordinance and subdivision ordinance.
    • Applicant may need certified elevation information relative to the 100-year floodplain.
    “they are fairly restrictive and allow only limited development activity.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of New Bedford or Bureau County directly.

  • Owner-builder exemption — Owner-builder exemption for construction inside New Bedford village.
  • Building code adopted — Building code adopted for construction inside New Bedford village.
  • Minimum dwelling size — Minimum dwelling size inside New Bedford village under county zoning.
  • Minimum lot size — Minimum lot size inside New Bedford village under county zoning.
  • Setbacks — Setbacks inside New Bedford village under county zoning.
16 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.