Bear Lake County, Idaho
Bloomington is a city in Bear Lake County, Idaho. Septic permits inside Bloomington come from Bloomington. 14 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Bear Lake County page.
Erecting, moving or adding to any building or structure (except fences) inside Bloomington city
“no building or other structure, except fences, shall be erected, moved, or added to without a permit issued by the council.”
Buildings erected inside Bloomington city
“all buildings erected in the city of bloomington will be subject to review per guidelines found in the application for building permit and water and sewer connections.”
Manufactured homes placed inside Bloomington city; no general minimum dwelling size for site-built homes was found
minimum enclosed floor area (manufactured home): >= 1000 square feet
“a manufactured home shall be defined as multi-sectional and enclose a space of not less than one thousand (1,000) square feet.”
Single-family dwelling lots inside Bloomington city (single district; no separate zoning districts found)
minimum lot area per single-family dwelling: >= 0.5 acre (possible exemption under section 4.12 for listed prior-created lots) · minimum lot width facing public road: >= 100 feet (possible exemption under section 4.12 for listed prior-created lots)
“a one-half (1/2) acre lot is required for each single-family dwelling*.”
Buildings on single-family lots inside Bloomington city (single district)
front setback from public right-of-way: >= 20 feet · side and rear setback (no ditch nearby): >= 10 feet · setback from ditch edge: >= 25 feet (owners may build closer with written permission from Bloomington Irrigation Co. or private ditch owner)
“minimum front and side set-back twenty (20) feet from all public rights-of-way.”
All buildings inside Bloomington city (height measured from average finished grade to highest roof point per definitions)
maximum building height: <= 35 feet
“maximum building height thirty-five (35) feet.”
Manufactured homes placed inside Bloomington city
“the manufactured home shall be placed on an excavated and backfilled foundation and enclosed at the perimeter such that the home is located not more than twelve (12) inches above finished grade, except when placed on a basement foundation.”
A second residential dwelling on one lot inside Bloomington city (accessory dwelling)
maximum residential dwellings per lot: 1 dwelling
“only one (1) residential dwelling per lot, parcel, or plot.”
New homes inside Bloomington city that are near the city municipal water and sewer system
“connecting to and obtaining service from the city of bloomington municipal water and sewer system is governed by the current city of bloomington municipal water and sewer systems ordinances.”
Subdividing land inside Bloomington city limits
“no person shall subdivide any tract of land which is located within the city limits of bloomington city, except in conformity with the provisions of this ordinance and/or the subdivision ordinance.”
Building permit and water/sewer connection fees in Bloomington city
“permit and connection fees shall be set forth by the city council by resolution from time to time.”
Building permit process in Bloomington city
“the council shall approve a form and contents of the application for building permit by resolution.”
Bloomington does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Septic permits for lots inside Bloomington city limits, issued by Southeastern Idaho Public Health (the ordinance calls it 'southeast idaho public health')
“owners that cannot be connected to the sewer system must provide a copy of their approved septic permit issued by southeast idaho public health.”
Lots inside Bloomington city that cannot be connected to the city sewer system
“exception: some properties in the city of bloomington may not have availability for sewer connection. owners that cannot be connected to the sewer system must provide a copy of their approved septic permit issued by southeast idaho public health.”
We looked and could not find an official answer yet. Silence is not permission; ask Bloomington or Bear Lake County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Bloomington publishes no rule on the point, not that none exists. Bear Lake County’s page lists the county offices to call.