Bolthole Index

Taylor County, Iowa

Zoning, building permits and septic rules in New Market, Iowa

New Market is a city in Taylor County, Iowa. Septic permits inside New Market come from Taylor County (Taylor County Sanitation Department (Sanitarian) · 641-344-0083). 6 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Taylor County page.

Answers from the rulebook for New Market

Rules another office applies inside New Market

New Market does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • InspectionsNot required

    A manufactured home inside New Market city limits that has been inspected under U.S. Department of Housing and Urban Development requirements and built to the federal manufactured-home construction and safety standards.

    • The exception applies only to manufactured homes that meet both the federal inspection and construction-standard conditions.
    “A city shall not require an inspection of a manufactured home”
  • Who permits septicCounty (with conditions)

    Onsite septic systems inside New Market city limits, where a septic system is used; the County page states that its permitting rule applies to any septic system in Taylor County.

    • A soil analysis is required as part of the permit.
    • Systems must be designed and constructed to comply with Iowa Administrative Code Chapter 69.
    “Each county board of health shall regulate the private water supply and private sewage disposal facilities”
  • Septic permitRequired

    Construction or repair of a septic system inside New Market city limits; the County rule covers any septic system in Taylor County.

    • A soil analysis is required as part of the permit to determine the type and size of system needed.
    • All systems must be designed and constructed to comply with Iowa Administrative Code Chapter 69.
    “A permit is required to construct or repair”
  • Septic inspectionRequired

    New or repaired septic systems inside New Market city limits; the County page says the construction-compliance requirement is verified by County Sanitation Department inspections.

    • Applies to systems designed and constructed under the County septic permit process.
    • Time-of-transfer inspections are separately required by state law on property transfer, subject to exemptions stated by that law.
    “verified through inspections by the Sanitation Department.”
  • Well permitRequired

    New private water wells, geothermal wells, and monitoring wells inside New Market city limits, to the extent a private well is proposed; the County page states the requirement without an incorporated-area exception.

    • The well permit must be obtained before work begins.
    • Well drillers must be Iowa certified.
    “The well permit shall be obtained prior to beginning work.”
  • Subdividing landRegulated (with conditions)

    A proposed subdivision plat inside New Market city limits that lies within the jurisdiction of a governing body.

    • The proposed plat must be submitted to the applicable governing body for review and approval before recording.
    • The governing body applies reasonable standards and conditions under applicable statutes and ordinances.
    • Within 60 days of an application for final approval, the governing body must determine conformity with its comprehensive plan and consider public-improvement burdens and relevant interests.
    • Final approval may not issue unless the plat conforms to Iowa Code sections 354.6, 354.11, and 355.8.

    final approval determination period: <= 60 days (Measured from application for final approval of the subdivision plat.)

    “A proposed subdivision plat lying within the jurisdiction of a governing body shall be submitted to that governing body for review and approval prior to recording.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask New Market or Taylor County directly.

  • Building permit — Construction inside New Market city limits.
  • Owner-builder exemption — Owner-built residential construction inside New Market city limits.
  • Building code adopted — Building construction inside New Market city limits.
  • Certificate of occupancy — Occupancy of buildings inside New Market city limits.
  • Local zoning — Land inside New Market city limits.
18 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Off-grid sanitation
  • Mandatory utility hookup
  • Agricultural exemption
  • Shed and accessory-building permit exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that New Market publishes no rule on the point, not that none exists. Taylor County’s page lists the county offices to call.

← All of Taylor County: county rules, score and offices