Tama County, Iowa
Garwin is a city in Tama County, Iowa. Garwin adopts its own zoning, so inside its limits Garwin’s rules apply, not the county’s. Septic permits inside Garwin come from Tama County (Tama County Sanitarian · 641-481-3550). 16 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Tama County page.
Inspection of building-sewer connections to the public sanitary sewer in Garwin city; no general building inspection rule was found.
“96.08 inspection required. all connections with the sanitary sewer system before being covered shall be inspected and approved, in writing, by the superintendent.”
Land inside Garwin city limits: Garwin city's own zoning ordinance (Ordinance No. 126, 'City of Garwin, Iowa, Zoning Ordinance') regulates use, construction and dimensions of buildings in the city.
“ordinance no. 126 entitled “city of garwin, iowa, zoning ordinance” and ordinance no. 127, the official zoning map ordinance, both adopted february 6, 1989, and amendments thereto have not been included as a part of the code of ordinances, but have been specifically saved from repeal and are in full force and effect.”
Zoning districts inside Garwin city limits as set by Garwin city's zoning ordinance Section 1.07.
“ag agricultural district cn conservation district rs residential single-family district rm residential multi-family district mh mobile home district cm commercial district li light industrial district hi heavy industrial district”
Single-family residential (RS) district inside Garwin city limits: minimum lot area for permitted residential uses.
minimum lot area (variant labeled 6 rs): >= 6000 sq ft (variant labeled 12 rs requires 12,000 sq ft) · minimum lot area (variant labeled 12 rs): >= 12000 sq ft (variant labeled 6 rs requires 6,000 sq ft) · minimum lot width (variant labeled 6 rs): >= 60 feet · minimum lot width (variant labeled 12 rs): >= 100 feet
“min. lot area (sq. ft.) min. lot width (feet) min. front yard (feet) min. side yard (feet) min. rear yard (feet) max. height (feet) 6 rs 12 rs 6,000 12,000 60 100 20 25 6 10 20 25 20* 20* (*amended by ordinance #184)”
“1. minimum lot area dwellings: 2 acres other uses: 5 acres”
Single-family residential (RS) district inside Garwin city limits: front, side and rear yard minimums for permitted residential uses.
minimum front yard (variant 6 rs): >= 20 feet (variant 12 rs: 25 feet) · minimum side yard (variant 6 rs): >= 6 feet (variant 12 rs: 10 feet) · minimum rear yard (variant 6 rs): >= 20 feet (variant 12 rs: 25 feet)
“min. lot area (sq. ft.) min. lot width (feet) min. front yard (feet) min. side yard (feet) min. rear yard (feet) max. height (feet) 6 rs 12 rs 6,000 12,000 60 100 20 25 6 10 20 25 20* 20* (*amended by ordinance #184)”
“3. minimum front yard dwellings: 50 feet other uses: 50 feet 4. minimum side yard dwellings: 15 feet 36 other uses: 25 feet 5. minimum rear yard dwellings: 50 feet other uses: 50 feet”
Agricultural (AG) district inside Garwin city limits: maximum building height.
maximum height: <= 15 feet
“6. maximum height - 15 feet (amended by ordinance no. 130)”
“min. lot area (sq. ft.) min. lot width (feet) min. front yard (feet) min. side yard (feet) min. rear yard (feet) max. height (feet) 6 rs 12 rs 6,000 12,000 60 100 20 25 6 10 20 25 20* 20* (*amended by ordinance #184)”
New home inside Garwin city limits that can reach the city's public sanitary sewer: connection is made under a city sewer permit.
connection completion deadline: <= 30 days (after permit approval; extension possible for conditions beyond owner's control)
“any person desiring to make a connection with the sewer system shall first file with the clerk an application therefore”
Land in the CN conservation district and floodway fringe inside Garwin city limits.
“it is noted, however, that there is a floodway fringe created by separate city ordinance by which this specific area is further regulated.”
Sewer building-connection permit fee in Garwin city. Building permit fees were not found.
sewer connection permit fee, residential and commercial: 50 USD (industrial: $500.00)
“4. permit fee. the person who makes the application shall pay the following fee to the clerk to cover the cost of issuing the permit and supervising, regulating, and inspecting the work: a. residential and commercial. $50.00 b. industrial. $500.00”
Process for a sewer building-connection permit in Garwin city. General building permit process not found.
“96.02 plumber required. any connection to a public sewer shall be made by a plumber approved by the city.”
Garwin does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private on-site wastewater (septic) systems on land inside Garwin city limits, administered by the Tama County Board of Health through the county environmental health program; applies inside Garwin city only where a septic system is used rather than the city sewer.
“section 2. enforcement. this ordinance shall be enforced by the tama county board of health as required in the code of iowa 455b.172(4). the board of health or its agent shall be responsible for issuance of required permits.”
Installing or altering a private septic system on land inside Garwin city limits, under the county board of health and the state rule adopted by Tama County.
“no psds shall be installed or altered as described in 69.1(3) “b” unless a construction permit issued by the administrative authority is obtained prior to construction.”
Newly constructed private septic systems on land inside Garwin city limits; final at-location inspection by the administrative authority (Tama County Board of Health).
“the administrative authority shall conduct an at-location inspection of all newly constructed psdss before the system is backfilled.”
We looked and could not find an official answer yet. Silence is not permission; ask Garwin or Tama County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Garwin publishes no rule on the point, not that none exists. Tama County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Garwin means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.