Zoning, building permits and septic rules in Grimes, Iowa

Grimes is a city in Polk County, Iowa. Septic permits inside Grimes come from Polk County (Polk County Environmental Health Services · 515-286-3705). 5 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Polk County page.

Answers from the rulebook for Grimes

Grimes’s own rules

  • Building permitRequired

    New construction, structural changes, and other work regulated by city codes on land inside Grimes city limits; administered by the Grimes city Building Division

    • Construction may proceed only after the permit is issued
    • The official page is a summary and lists examples (new buildings, additions, decks, sheds, fences, driveways, and others); the city code text defining the trigger was not located
    • Page provided by the Building Division at 101 NE Harvey Street, Grimes, Iowa 50111
    “a permit is required for any construction that physically changes or adds structure to your property or for work regulated by city codes or ordinances.”
  • Permit processPartial

    How to apply for a building permit in Grimes city

    • The page links to an online application for a permit and to an inspection scheduling page; the linked pages were not opened
    • Permit review steps and timelines are not stated on the page
    “apply for a permit click here to apply for a permit.”

Rules another office applies inside Grimes

Grimes does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Private on-site wastewater (septic) systems on land inside Grimes city limits that lies in Polk County; Polk County's Environmental Health Services division administers them. Applies inside Grimes city because Polk County's jurisdiction is stated to cover the whole county except the city of Des Moines.

    • Source covers the Polk County portion of Grimes city only; any Grimes parcel in Dallas County is not covered by this source
    • Per the page, alternative treatment units (ATUs) are not allowed in Polk County under county ordinance
    • Per the page, regulations fall under Iowa Administrative Code 567-69 and Polk County Code of Ordinances Chapter III (health regulations); those texts were not opened
    • Only licensed contractors may perform septic work, except septic abandonments
    “polk county has jurisdiction throughout the county except for the city of des moines.”
  • Septic permitRequired

    Installation, alteration, repair, or replacement of a septic system on Polk County portion of Grimes city land; administered by Polk County Environmental Health Services

    • Permit fee must be paid after application approval and before the permit is issued
    • Abandonment-only permits are available for septic abandonment
    • Permits may be submitted through the county online portal
    “after your application is submitted and approved, a permit fee must be paid before the permit is issued.”
  • Septic inspectionRequired

    Septic system installation, alteration, repair, and abandonment on Polk County portion of Grimes city land

    • The permit holder must schedule the required inspections
    • In abandonment cases the inspector must be present for tank pumping and deconstruction
    • Iowa time-of-transfer septic inspection law (SF 261) is described on the same page as a separate requirement; not analyzed here
    “inspections are required, and in cases of system abandonment, the inspector must be present to observe the tank pumping and deconstruction.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Grimes or Polk County directly.

  • Owner-builder exemption — Whether an owner may build their own home without a licensed contractor in Grimes city
  • Building code adopted — Which building code edition (for example the International Residential Code) Grimes city has adopted for construction inside its limits
  • Certificate of occupancy — Whether a certificate of occupancy is issued for new homes in Grimes city
  • Local zoning — Whether Grimes city adopts and administers its own zoning ordinance for land inside its limits
  • Zoning districts — Published zoning district map and regulations for Grimes city
18 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Grimes publishes no rule on the point, not that none exists. Polk County’s page lists the county offices to call.

← All of Polk County: county rules, score and offices