Andrew is a city in Jackson County, Iowa. Andrew adopts its own zoning, so inside its limits Andrew’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on November 1, 2026. Rules for unincorporated land are on the Jackson County page.

Answers from the rulebook for Andrew

Andrew’s own rules

  • Building permitRequired

    Construction, reconstruction, alteration, repair, moving, or addition of structures inside Andrew city limits, per the city permit form

    • The city permits all construction projects through its building permits department.
    • Permit form: no work may begin until a permit has been issued.
    • Council approval is also required for exterior structures (see permit_process claim).
    “that no work shall begin until a permit has been issued”
  • InspectionsRequired

    Permitted work inside Andrew city limits

    • Inspection is by a person appointed by the mayor, on completion of the work, to check compliance with the permit and city ordinances.
    “all work should be inspected upon completion by a person appointed by the mayor to assure compliance to said permit and city ordinances.”
  • Local zoningPresent (with conditions)

    Land inside Andrew city limits: the city code refers to its own zoning ordinance and zoned districts

    • The city code (section 3-10-15) and the city's 6-16 and cell-tower provisions refer to 'the zoning ordinance' and 'all other general zoning district regulations' of Andrew city; the text of that ordinance and its district schedule was not located in this research run, so the district-level topics are unknown.
    • The quoted reference is in the vehicle-storage exception, not in a zoning chapter.
    “as authorized under the zoning ordinance or restricted residence district of this city”
  • SetbacksSpecified

    Residential area inside Andrew city limits, per the city's building permit application form; the form does not name a zoning district

    • Figures are as written on the city's permit application form, which states that a detailed sketch must show distances from all lot lines.
    • The form writes the figures with a prime mark (30’, 7’); unit read as feet.
    • Form item 5: a $20.00 fee applies to applications requesting a variance; variance standards not located.
    • Zoning-district setbacks (including any agricultural or rural district) not located; these figures may not match the zoning ordinance.

    front yard setback: >= 30 feet · side yard setback: >= 7 feet · rear yard setback: >= 30 feet

    “residential area: front yard required 30’ side yard required 7’ rear yard required 30’”
  • Subdividing landRegulated (with conditions)

    Platted subdivisions of land inside Andrew city limits under the city's subdivision provisions in the code

    • Preliminary plats go to the city engineer and governing body; the final plat and the rest of the subdivision chapter were not opened.
    “the city clerk-treasurer shall forthwith refer two (2) copies of the preliminary plat to the city engineer and (2) copies to the governing body.”
  • Permit feesPublished (with conditions)

    Building permit applications for construction inside Andrew city limits

    • Application and fee must be received at city hall two weeks before the council meeting where it is presented.
    • Permit is good for one year.
    • A $20.00 fee applies to applications requesting a variance.

    building permit fee: 15 USD (Variance applications: $20.00 permit fee (form item 5))

    “application and a $15.00 permit fee must be received at the city hall 2 weeks prior to the council meeting or special meeting that it is to be presented at and is good for one year.”
  • Permit processPublished (with conditions)

    Building permits for exterior structures and other construction inside Andrew city limits

    • Application requires a detailed sketch and narrative showing lot lines and distances.
    • Council approval is required for exterior structures (fences, decks, porches, sheds, moved structures) before work begins.
    • Work must finish within one year of issuance, or a new permit is needed.
    • Work is inspected on completion by a mayor-appointed person.
    “approval of the city council on all exterior structures is required before construction/repair is begun”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Andrew or Jackson County directly.

  • Owner-builder exemption — Owner-builders in Andrew city
  • Building code adopted — Construction inside Andrew city limits
  • Certificate of occupancy — Occupancy of new buildings inside Andrew city limits
  • Zoning districts — Zoning district map and schedule for Andrew city
  • Minimum dwelling size — Minimum dwelling size in Andrew city's residential districts
18 more unanswered
  • Minimum lot size
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Andrew publishes no rule on the point, not that none exists. Jackson County’s page lists the county offices to call.

← All of Jackson County: county rules, score and offices