Hardin County, Iowa
Radcliffe is a city in Hardin County, Iowa. Radcliffe adopts its own zoning, so inside its limits Radcliffe’s rules apply, not the county’s. Septic permits inside Radcliffe come from the county and state together. 12 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Hardin County page.
Land inside Radcliffe city limits, administered by the city under its own zoning ordinance (standalone Radcliffe Zoning Ordinance PDF; code chapter 165 is the zoning chapter in the city code)
“for the purpose of this ordinance, the city of radcliffe, lowa, is hereby divided into five (5) districts, which are as follows”
Zoning districts inside Radcliffe city limits: A-1 agricultural reserve, R-1 single-family, B-1, B-2 commercial, and M-1 manufacturing
“a-1 agricultural reserve district r-1 single-family district b-1 highway commercial b-2 downtown commercial m-1 manufacturing district”
Single-family dwelling lots in the R-1 single-family residential district inside Radcliffe city
minimum lot area, single-family dwelling: >= 7500 square feet (same figure applies to two- and three-family dwellings) · minimum average lot width: >= 50 feet
“dred (7,500) square feet and have an average wid th of not less than fifty (50) feet”
“a lot or parcel of land occupied by a sing le family dwelling shall have an area of not less than 25 acres”
Permitted uses in the A-1 agricultural reserve district inside Radcliffe city
minimum front yard: >= 50 feet · minimum rear yard: >= 50 feet · minimum side yard: >= 15 feet
“there shal l be a rear yard having a depth of not less than 50 fest”
“there shall be a side yard on each side of the building not less than four (4) feet in width”
Buildings in the R-1 single-family residential district inside Radcliffe city
maximum building height: <= 35 feet · maximum stories: <= 2.5 stories
“4. maximum height: no building shall exceed two and one-half exceed thirty-five (35) feet in height.”
Mobile and manufactured homes placed outside a manufactured home community or mobile home park inside Radcliffe city
“146.03 foundation requirements. a mobile home or manufactured home located outside of a manufactured home community or mobile home park shall be placed on a permanent frost-free foundation system that meets the support and anchorage requirements as recommended by the manufacturer or required by the state building code.”
Installing or altering an on-site wastewater treatment and disposal system inside Radcliffe city. The city code requires the permit from the county board of health.
“98.04 permit required. no person shall install or alter an on-site wastewater treatment and disposal system without first obtaining a permit from the county board of health.”
Privies, septic tanks, cesspools and other sewage disposal facilities inside Radcliffe city
“5. septic tanks. construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended or used for the disposal of sewage except as provided in these chapters.”
Houses and buildings for human occupancy inside Radcliffe city that abut a street, alley or right-of-way with a public sanitary or combined sewer
connection deadline after official notice: <= 90 days (applies after city notice)
“such compliance to be completed within 90 days after date of official notice from the city to do so provided that said public sewer is located within 100 feet of the property line of such owner and is of such design as to receive and convey by gravity such sewage as may be conveyed to it.”
Radcliffe does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater systems inside Radcliffe city where no public sanitary sewer is available under section 95.05. The county board of health is the permitting body; the city code sends construction to state rules and county regulations.
“98.03 compliance with regulations. the type, capacity, location, and layout of a private on-site wastewater treatment and disposal system shall comply with the specifications and requirements set forth by the iowa administrative code 567, chapter 69, and with such additional requirements as are prescribed by the regulations of the county board of health.”
We looked and could not find an official answer yet. Silence is not permission; ask Radcliffe or Hardin County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Radcliffe publishes no rule on the point, not that none exists. Hardin County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Radcliffe means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.