Cedar County, Iowa
Lowden is a city in Cedar County, Iowa. Lowden adopts its own zoning, so inside its limits Lowden’s rules apply, not the county’s. Septic permits inside Lowden come from the county and state together. 20 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Cedar County page.
Construction or alteration of any building or structure, including fences, inside Lowden city
“it is unlawful to construct or alter any building or structure in the city, including fences, without first securing a permit therefore.”
Building permit projects in Lowden city
“public works may complete a pre-inspection prior to council approval.”
Land inside Lowden city limits (Cedar County, Iowa): the city administers zoning districts and an official zoning map
“permits will be granted only for tracts of land located in residential districts as identified on the current official zoning map on file with the city of lowden.”
Land inside Lowden city limits: the city's residential districts as shown on its official zoning map
“permits will be granted only for tracts of land located in residential districts as identified on the current official zoning map on file with the city of lowden.”
Lots for new buildings inside Lowden city, as stated on the city's building permit application (no district is named on the form; the form does not give the ordinance section number)
minimum lot size: >= 7500 sq ft · minimum frontage: >= 60 ft
“minimum lot size: 7,500 sq. ft.; minimum frontage: 60 ft.”
New principal buildings on ordinary lots inside Lowden city, as stated on the city's building permit application (district not named)
front yard setback: >= 15 ft (also applies from other buildings) · side yard setback: >= 7.5 ft · rear yard setback: >= 7.5 ft
“setbacks: 7.5 ft. side and rear; 15 ft. front and from other buildings”
“subdivisions: 25 ft. front yard, 7 ft. side yard, 30 ft. rear yard”
“no part of the structure shall be closer than five (5) feet from the principal structure or property line, or as set forth in the zoning ordinance for property setbacks”
Accessory buildings and structures in the rear yard inside Lowden city (occupancy of the required rear yard, not whole-lot coverage)
accessory structures share of required rear yard: < 30 percent (private garage may occupy up to 50 percent of the required rear yard; no more than 30 percent of the rear yard may be occupied by garage, accessory building or structure combined)
“the structure shall occupy less than 30 percent of the required rear yard, except for a private garage, which may occupy up to 50 percent of the required rear yard.”
Accessory buildings and structures (other than a private garage) inside Lowden city; principal building height limit not located
accessory building sidewall height: <= 12 ft (applies to accessory buildings and structures other than a private garage)
“accessory buildings and structures, other than a private garage, shall be limited to twelve (12) feet in height for sidewalls”
Recreational vehicles parked or stored on private lots inside Lowden city
habitation days per calendar year in residential districts: <= 14 days (in residential zoning districts)
“recreational vehicles parked or stored on premises or any lot shall not be used for permanent human occupancy. in residential zoning districts, recreational vehicles shall only allow human habitation for not more than fourteen (14) days in a calendar year.”
Mobile homes, manufactured homes and modular homes (factory-built homes) located on land inside Lowden city
special permit duration for mobile home outside a park: <= 1 year (reapplication allowed after expiry)
“all mobile homes, modular homes and factory built homes as defined in the iowa code located outside a mobile home park shall comply with all ordinances relating to residences or homes in the community and shall be affixed to a permanent perimeter foundation unless it is incompatible with the structural design of the home.”
Private sewage disposal systems on land inside Lowden city where no public sewer is available
“the type, capacities, location, and layout of a private sewage disposal system shall comply with all recommendations of the department of natural resources of the state of iowa and the county health department.”
Private sewage disposal system built where a public sanitary or combined sewer is not available inside Lowden city
private sewage permit and inspection fee: 100 USD
“before commencement of construction of a private sewage disposal system the owner shall first obtain a written permit signed by the superintendent.”
Private sewage disposal systems inside Lowden city
inspection response time: <= 72 hours (from receipt of notice)
“the superintendent shall be allowed to inspect the work at any stage of construction and, in any event, the applicant for the permit shall notify the superintendent when the work is ready for final inspection, and before any underground portions are covered. the inspection shall be made within 72 hours of the receipt of notice by the superintendent.”
Homes on land inside Lowden city where no public sanitary or combined sewer is available under section 6-2-2(4)
minimum lot area for subsurface soil absorption system: >= 15000 sq ft (no permit issued for subsurface soil absorption systems on smaller lots)
“where a public sanitary or combined sewer is not available under the provision of section 6-2-2(4), the building sewer shall be connected to a private sewage disposal system complying with the provisions of this section.”
A building on a lot abutting a street with a city sanitary or combined sewer inside Lowden city
distance from property line to public sewer triggering connection: <= 150 ft · time to connect after public sewer becomes available: <= 60 days (from official notice)
“provided that said public sewer is within one hundred fifty (150) feet of the property line.”
Division of land into lots inside Lowden city; building permits for tracts depend on platting
“no more than two building permits for each separate tract existing at the effective date of this ordinance shall be issued unless the tract has been platted in accordance with this ordinance”
Building permits issued by the City of Lowden, Iowa
storage shed or deck permit fee: 10 USD · solar installation permit fee: 10 USD · garage, house addition, storage unit or inground pool permit fee: 25 USD · house, duplex, apartment or commercial structure permit fee: 100 USD · each additional building permit fee: 50 USD
“permit fees 10.00 – storage shed, deck 10.00 – solar installation 25.00 – garage, house addition, storage unit/inground pool 100.00 – house, duplex, apartment, commercial structure 50.00 – each additional building”
Building permits in Lowden city
“no work may begin until the permit is approved by the city council.”
We looked and could not find an official answer yet. Silence is not permission; ask Lowden or Cedar County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Lowden publishes no rule on the point, not that none exists. Cedar County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Lowden means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.