Bolthole Index

Spalding County, Georgia

Building permits, zoning and septic rules in Griffin, Georgia

Griffin, Georgia requires building permits for all new construction through the city’s Permits & Inspections office.1 Griffin administers its own zoning; Spalding County’s zoning rules concern unincorporated land.23 Inside Griffin, buildings that cannot be served by public sanitary sewer need a county-board-of-health septic permit before city construction or occupancy approval.4

At a glance

Building permits
Required for all new construction; city Permits & Inspections issues construction permits.1
Zoning
Griffin administers its own Unified Development Code.2
Septic permits
County board of health approval comes before city construction or occupancy approval where public sewer cannot serve the building.4
Owner-builder
City allows a Homeowner’s Affidavit for homeowners doing the work themselves; residency and contractor requirements apply.1
Accessory-building setbacks
Rear-yard residential accessory buildings need at least 5 feet from property lines, with a different corner-lot rule.5
Pre-owned manufactured homes
City permit required; $150 permit/inspection fee and $1,000 refundable bond or cash deposit.6

Who to call

Building permits

City of Griffin Permits & Inspections

Construction plan review, building permits, inspections and certificates of occupancy inside Griffin.

(770) 233-4130

100 S. Hill St. Griffin, GA 30223

Planning & zoning

City of Griffin Planning & Development Services

City development review and administration of the Unified Development Code.

(770) 233-4130

100 S. Hill St. Griffin, GA 30223

Septic permits

Spalding County Health Department, Environmental Health

Contact for county-board-of-health septic approval and questions about local well requirements.

(770) 467 - 4230

1007 Memorial Drive Griffin, GA 30224

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Griffin means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Griffin, GA?

Griffin requires a building permit for all new construction, and the city’s Permits Division issues construction permits and certificates of occupancy.1 Griffin also specifically requires a building permit for a solar energy system.7 Georgia’s mandatory construction codes apply statewide, including where a local government does not enforce them.8

Homeowners in Griffin may obtain a building permit with a completed Homeowner’s Affidavit only when doing the work themselves.1 The city says owners not living at the residence for a minimum of two years must use a licensed contractor; ask Permits & Inspections how that condition applies to your project.1 Licensed contractors must obtain electrical, plumbing and HVAC trade permits.1

Who issues building permits in Griffin, and where do you apply?

City of Griffin Permits & Inspections handles construction plan review, construction permits and certificates of occupancy.1 Contact the office at (770) 233-4130 or visit 100 S. Hill St., Griffin, GA 30223.1 Griffin’s Planning & Development Services Department is the starting point for development within city limits and administers the Unified Development Code.9

Griffin reviews submitted residential and commercial construction plans through a process coordinated by Planning & Development Services that typically involves Public Works, Electric and Public Safety.1 Septic approval for a Griffin building without public sewer remains with the county board of health, rather than the city building counter.10 Contact Spalding County Environmental Health at (770) 467 - 4230 for that approval.11

Does Griffin have zoning, and what setbacks apply?

Griffin has its own zoning administrator and Unified Development Code for land inside city limits.2 Ask City Planning & Development Services to identify the parcel’s district and confirm the proposed use, principal-building setbacks, minimum lot size and minimum dwelling size before committing to a design.9

For rear-yard accessory buildings on residential lots in Griffin, the minimum setback is 5 feet from all property lines.5 On corner lots, accessory buildings must instead meet the district’s front-yard setback along both streets.5 Those accessory-building rules do not establish the setbacks for the principal house.5 For land outside Griffin city limits, consult the Spalding County guide: county zoning governs unincorporated Spalding County.3

How do septic permits work inside Griffin?

A Griffin building that cannot be served by public sanitary sewer needs a septic or individual sewage-management-system permit from the county board of health before city construction or occupancy approval.4 Spalding County Environmental Health is the local contact; its listed phone is (770) 467 - 4230.11

Georgia requires the County Board of Health to find the site suitable before issuing an onsite sewage construction permit.12 Georgia also requires final inspection and written approval before a septic system is backfilled or used, including repairs, replacements and additions.13 In Griffin’s city sewer service area, human-occupancy buildings accessible to public water or sanitary sewer must connect to the applicable system before a certificate of occupancy is issued.14

Can you live in an RV, tiny home or manufactured home in Griffin?

We could not confirm permission to live in an RV on private land in Griffin; ask City Planning & Development Services about the proposed parcel and use.9 Griffin’s parking-lot rule requires the owner’s express authorization and prior notification to the city for camping or overnight stays, but that provision addresses parking lots.15

Georgia requires local siting approval for site-built or modular tiny homes, and applicable building codes still apply.16 Ask Griffin Planning & Development Services to confirm tiny-home or accessory-dwelling eligibility for your district.9 Griffin requires a permit to locate a pre-owned manufactured home, with a $150 permit/inspection fee and a $1,000 refundable bond or cash deposit.6 Each additional follow-up inspection beyond those covered by the fee costs $75.17

Building a home in Griffin: what are the steps, in order?

  1. Start with Griffin Planning & Development Services to confirm zoning and the proposed development.9
  2. Resolve wastewater approval: obtain the county-board-of-health septic permit if public sanitary sewer cannot serve the building.4
  3. Submit residential construction plans to Griffin’s Permits & Inspections office for plan review and the building permit.1
  4. Obtain Public Works and Utilities Department approval before a curb cut, grading or driveway improvement in a public right-of-way.18
  5. Arrange the city inspections required during construction and obtain a certificate of occupancy after final inspection.1

Before buying a parcel dependent on a private well, ask Spalding County Environmental Health about local well-construction requirements; Georgia requires a well contractor to contact the county health department in advance for site review.19 Ask Griffin Planning & Development Services to identify the office responsible for parcel-specific floodplain approval.9

Watch-outs

  • Griffin’s accessory-building setback is not a substitute for the principal-house district requirements; ask City Planning & Development Services for the parcel’s zoning requirements.59
  • A Griffin building without public sewer cannot receive city construction or occupancy approval before the county-board-of-health septic permit is issued.4
  • We could not confirm residential RV occupancy permission in Griffin; ask City Planning & Development Services before planning to live in an RV while building.9

Sources

  1. City of Griffin Permits & Inspections (cityofgriffin.com)
  2. Unified Development Code, § 202 Definitions (Griffin), quoted and re-checked
  3. Planning & Zoning (2026 county census)
  4. Code of Ordinances, § 94-35 Connection to public water and wastewater systems required (Griffin), quoted and re-checked
  5. Unified Development Code, § 504(B) (Griffin), quoted and re-checked
  6. Code of Ordinances, § 22-233 Permitting, inspection, certificate of occupancy and fees (Griffin), quoted and re-checked
  7. Unified Development Code, § 2007 Safety and inspections (Griffin), quoted and re-checked
  8. Mandatory and Permissive State Codes (Georgia statewide rule), quoted and re-checked
  9. City of Griffin Planning & Development Services (cityofgriffin.com)
  10. Code of Ordinances, § 94-35 Connection to public water and wastewater systems required (Griffin), quoted and re-checked
  11. Spalding County Health Department, Environmental Health (spaldingcounty.com)
  12. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  13. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  14. Code of Ordinances, § 94-35 Connection to public water and wastewater systems required (Griffin), quoted and re-checked
  15. Code of Ordinances, § 90-100 Parking of heavy vehicles (Griffin), quoted and re-checked
  16. Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
  17. Code of Ordinances, § 22-233 Permitting, inspection, certificate of occupancy and fees (Griffin), quoted and re-checked
  18. Unified Development Code, § 1402(E) Permit required (Griffin), quoted and re-checked
  19. Water Well Standards (Georgia statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Griffin

Griffin’s own rules

  • Building permitRequired

    Solar energy systems inside Griffin city.

    • The permit is reviewed by department staff; design and installation must comply with applicable codes, regulations, standards, and utility requirements.
    “A building permit, reviewed by department staff, shall be obtained for a solar energy system.”
  • InspectionsRequired

    Pre-owned manufactured homes located inside Griffin city.

    • Applicant must arrange inspection once installation is complete.
    “Applicant shall arrange for an inspection to be held once the installation of the manufactured home is complete.”
  • Certificate of occupancyRequired

    Pre-owned manufactured homes located inside Griffin city.

    • Issued when the building official certifies that Article VI requirements have been met.
    “A certificate of occupancy shall be issued to the applicant at such time that the building official certifies that the requirements of this article have been met.”
  • Local zoningPresent (with conditions)

    Land inside Griffin city limits.

    • The City Manager designates the zoning administrator to enforce the Unified Development Code.
    “Administrator, zoning: The person designated by the city manager of the City of Griffin to administer the enforcement of this ordinance.”
  • SetbacksSpecified

    Accessory buildings within rear yards on residential lots inside Griffin city.

    • For corner lots, setback from each street property line equals the district front-yard setback.
    • Applies to accessory buildings; the principal-building district schedule was not included in opened material.

    accessory building setback from property lines: >= 5 feet (Rear-yard accessory building on residential lot; corner-lot exception applies.)

    “Within a rear yard, an accessory building on a residential lot shall be located at least five feet from all property lines, except in the case of corner lots, accessory buildings shall be set back from the property line a distance equal to the front yard setback established for the zoning district on both streets.”
  • Camping on your landLimited

    Camping or overnight stays in parking lots inside Griffin city.

    • Camping or overnight stays require express authorization by the lot owner and prior notification to the city.
    “No parking lot in the city, regardless of the zoning district in which it is located, shall be used for camping or overnight stays unless expressly authorized by the owner of the lot and prior notification to the city.”
  • Manufactured homesLimited

    Pre-owned manufactured homes installed inside Griffin city limits.

    • Applicant must submit health-and-safety affidavit, photographs, refundable $1,000 bond or cash deposit, and permit/inspection fee.
    • Certificate of occupancy issues only after requirements are met.

    permit and inspection fee: 150 USD (Covers initial inspection and one follow-up; each additional follow-up is $75.) · refundable guarantee bond or cash deposit: 1000 USD (Required with permit application.)

    “A permit shall be required to locate a pre-owned manufactured home in the jurisdiction.”
  • Mandatory utility hookupConditional

    Human-occupancy buildings within the city sewer service area that are accessible to public water and/or sanitary sewer.

    • Connection is required before certificate of occupancy when accessible to the respective public system.
    • When public sewer becomes accessible to an existing occupied building with a failed septic system, its use must discontinue and the building must connect.
    “Buildings and structures accessible to a public water system and/or a public sanitary sewer system shall be properly connected on or into such system(s) prior to issuance of a certificate of occupancy.”
  • Driveway accessRequired

    Curb cuts, grading, or driveway improvements in public rights-of-way inside Griffin city.

    • Requires Public Works and Utilities Department approval.
    • City may require owner indemnification and later removal, relocation, or repair at owner's expense.
    “No person shall be authorized to open any curb cut, grade or otherwise make any improvements upon the public right-of-way of any street, road or highway, except with approval of the public works and utilities department.”
  • Permit feesPublished (with conditions)

    Permits to locate pre-owned manufactured homes inside Griffin city.

    • The $150 fee covers the initial inspection and one follow-up; each additional follow-up inspection costs $75.

    permit and inspection fee: 150 USD (Initial inspection and one follow-up inspection.) · additional follow-up inspection fee: per 75 USD (Each additional follow-up inspection.)

    “A permit and inspection fee of $150.00 shall be charged to the applicant to cover the cost to the city to process the permit application and inspect the pre-owned manufactured home. Such fee shall cover the initial inspection and one follow-up inspection. The applicant shall be charged $75.00 for each additional follow-up inspection that may be necessary.”
  • Permit processPartial

    Permit applications for locating pre-owned manufactured homes inside Griffin city.

    • Applicant must provide affidavit, interior/exterior photographs, refundable guarantee bond or cash deposit, and permit/inspection fee.
    • The rule covers pre-owned manufactured homes only.

    guarantee of condition bond or cash deposit: 1000 USD (Refundable.)

    “To obtain a permit, applicants shall provide to the building official: (1) An affidavit signed by the applicant that the pre-owned manufactured home meets health and safety standards required by this Act; (2) Photographs of the interior and exterior of the pre-owned manufactured home providing evidence that home meets the minimum health and safety standards of section 22-234; (3) A $1,000.00 refundable guarantee of condition bond or $1,000.00 refundable cash deposit; and (4) The permit and inspection fee required by subsection (d) of this section.”

Rules another office applies inside Griffin

Griffin does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Septic or individual sewage-management systems serving buildings inside Griffin city that cannot be served by public sanitary sewer.

    • Permit must conform to statewide minimum standards and county-board-of-health regulations then in force.
    “No permit for the construction of any residence, building or other facility which cannot be served by public sanitary sewer shall be issued, and no certificate for the use and occupancy for any existing residence, building or other facility which cannot be served by public sanitary sewer shall be issued, unless a septic tank or individual sewage management system permit has been issued by the county board of health in conformity with any state-wide minimum standards for sewage management systems and the regulations of the county board of health then in force and effect.”
  • Septic permitRequired

    Buildings inside Griffin city that cannot be served by public sanitary sewer.

    • A county-board-of-health septic or individual sewage-management-system permit is required before city construction or occupancy approval.
    • Permit must conform to statewide minimum standards and county-board-of-health regulations then in force.
    “No permit for the construction of any residence, building or other facility which cannot be served by public sanitary sewer shall be issued, and no certificate for the use and occupancy for any existing residence, building or other facility which cannot be served by public sanitary sewer shall be issued, unless a septic tank or individual sewage management system permit has been issued by the county board of health in conformity with any state-wide minimum standards for sewage management systems and the regulations of the county board of health then in force and effect.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Griffin or Spalding County directly.

  • Owner-builder exemption — Owner-built residential construction inside Griffin city.
  • Minimum dwelling size — Residential districts inside Griffin city.
  • Minimum lot size — Residential districts inside Griffin city.
  • Lot coverage — Land inside Griffin city.
  • Building height — Land inside Griffin city.
8 more unanswered
  • Living in an RV
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Griffin publishes no rule on the point, not that none exists. Spalding County’s page lists the county offices to call.

← All of Spalding County: county rules, score and offices